UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

rch 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 (NRC INSPECTION REPORT 05000261/2008001)

Dear Mr. Walt:

On February 06, 2008, the NRC technical staff completed its performance review of the H. B.

Robinson Steam Electric Plant for the period from January 1 through December 31, 2007. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only- Security-Related Information will include the security cornerstone review and a resultant inspection plan.

Overall, Robinson operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for Robinson Unit 2 for the most recent quarter, as well as the first three quarters of the assessment cycle, was in the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include operator licensing, and Temporary Instructions 171 (B.5.b) and 172 (Reactor Coolant System Dissimilar Metal Butt Welds).

CP&L 2 The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2009. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4603 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261, Docket No. 72-3 Licensee No.: DPR-23, License No. SNM-2502 Enclosure: Robinson Inspection/Activity Plan cc w/encl: (See page 3)

_________________________

OFFICE RII:DRP RII:DRP SIGNATURE RAM GJW NAME RMusser GWilson DATE 03/03/2008 02/12/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

CP&L 3 cc w/encl: David T. Conley William G. Noll Associate General Counsel - Legal Dept.

Director, Site Operations Progress Energy Service Company, LLC Carolina Power & Light Company Electronic Mail Distribution H. B. Robinson Steam Electric Plant Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge Ernest J. Kapopoulos, Jr. 2300 N. Street, NW Plant General Manager Washington, DC 20037-1128 Carolina Power & Light Company H. B. Robinson Steam Electric Plant Chairman of the North Carolina Electronic Mail Distribution Utilities Commission c/o Sam Watson, Staff Attorney Paul Fulford, Manager Electronic Mail Distribution Performance Evaluation and Regulatory Affairs PEB 5 Robert P. Gruber Electronic Mail Distribution Executive Director Public Staff - NCUC C. T. Baucom, Supervisor 4326 Mail Service Center Licensing/Regulatory Programs Raleigh, NC 27699-4326 Carolina Power & Light Company H. B. Robinson Steam Electric Plant Public Service Commission Electronic Mail Distribution State of South Carolina P. O. Box 11649 J. F. Lucas, Manager Columbia, SC 29211 Support Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.

Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.

S. C. Department of Health and Environmental Control Electronic Mail Distribution Beverly Hall, Chief Radiation Protection Section N. C. Department of Environment, Health and Natural Resources Electronic Mail Distribution

CP&L 4 Report to Tom Walt from Randall A. Musser dated March 3, 2008 SUBJECT: ANNUAL ASSESSMENT LETTER - H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 NRC INSPECTION REPORT 05000261/2008001 Distribution w/encl:

C. Patel, NRR C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS ROP Reports INPO PUBLIC

Page 1 of 2 Robinson 03/03/2008 14:51:02 Inspection / Activity Plan Report 22 03/03/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PREP TRIP-PROBLEM ID AND RESOL 1 2 IP 71152B Identification and Resolution of Problems 04/21/2008 04/25/2008 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 2 IP 71152B Identification and Resolution of Problems 06/02/2008 06/06/2008 Baseline Inspections 2 IP 71152B Identification and Resolution of Problems 06/16/2008 06/20/2008 Baseline Inspections PSB1-EP - EP INSP 1 2 IP 7111402 Alert and Notification System Testing 06/16/2008 06/20/2008 EP Baseline Inspection 2 IP 7111403 Emergency Response Organization Augmentation Testing 06/16/2008 06/20/2008 EP Baseline Inspection 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/16/2008 06/20/2008 EP Baseline Inspection 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/16/2008 06/20/2008 EP Baseline Inspection 2 IP 71151-EP01 Drill/Exercise Performance 06/16/2008 06/20/2008 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation 06/16/2008 06/20/2008 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 06/16/2008 06/20/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP 4 2 V23285 ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 07/28/2008 08/01/2008 Not Applicable PSB1-RP - RAD PROTECTION PRE-INSPECTION VISIT 1 2 IP 7112101 Access Control to Radiologically Significant Areas 08/11/2008 08/13/2008 Baseline Inspections OL EXAM - INITIAL EXAM 4 2 V23285 ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 08/18/2008 08/29/2008 Not Applicable TI-171 - B.5.B PHASE 2&3 3 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/08/2008 09/12/2008 Generic Safety Inspectio PSB1-RP - RAD PROTECTION OCCUPATIONAL WK1 2 2 IP 7112101 Access Control to Radiologically Significant Areas 10/06/2008 10/10/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 10/06/2008 10/10/2008 Baseline Inspections 2 IP 7112202 Radioactive Material Processing and Transportation 10/06/2008 10/10/2008 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/06/2008 10/10/2008 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 10/06/2008 10/10/2008 Baseline Inspections EB3ISI - ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/13/2008 10/17/2008 Baseline Inspections PSB1-RP - RAD PROTECTION OCCUPATIONAL WK2 3 2 IP 7112101 Access Control to Radiologically Significant Areas 10/20/2008 10/24/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 10/20/2008 10/24/2008 Baseline Inspections 2 IP 7112202 Radioactive Material Processing and Transportation 10/20/2008 10/24/2008 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Robinson 03/03/2008 14:51:02 Inspection / Activity Plan Report 22 03/03/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-MODS - MODIFICATIONS-10CFR50.59 5 2 IP 7111117B Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 10/20/2008 10/24/2008 Baseline Inspections 2 IP 7111117B Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 11/03/2008 11/07/2008 Baseline Inspections EB3TI172 - TI-172 1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 10/27/2008 10/31/2008 Generic Safety Inspectio PSB1-RP - RAD PROTECTION PRE-INSPECTION VISIT 1 2 IP 7112101 Access Control to Radiologically Significant Areas 12/15/2008 12/17/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC CORNERSTONE 4 2 IP 7112101 Access Control to Radiologically Significant Areas 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 01/12/2009 01/16/2009 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 01/12/2009 01/16/2009 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 01/12/2009 01/16/2009 Baseline Inspections OL RQ - REQUAL INSPECTION 2 2 IP 7111111B Licensed Operator Requalification Program 03/02/2009 03/06/2009 Baseline Inspections PSB1EP - EP EXERCISE 3 2 IP 7111401 Exercise Evaluation 05/18/2009 05/22/2009 EP Baseline Inspection 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/18/2009 05/22/2009 EP Baseline Inspection 2 IP 71151-EP02 ERO Drill Participation 05/18/2009 05/22/2009 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 05/18/2009 05/22/2009 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 05/18/2009 05/22/2009 Baseline Inspections EB3-HS - HEAT SINK 1 2 IP 7111107B Heat Sink Performance 06/01/2009 06/05/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.