SUBJECT:
UPDATED INSPECTION PLAN FOR H.B. ROBINSON STEAM ELECTRIC PLANT (REPORT 05000261/2023005)
Dear Laura Basta:
The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for the H.B. Robinson Steam Electric Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4628 with any questions you have regarding this letter.
Sincerely, David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 05000261, 07200003, and 07200060 License No. DPR-23 Enclosure:
H.B. Robinson Inspection/Activity Plan (09/01/2023- 06/30/2025)
cc w/ encl: Distribution via LISTSERV August 21, 2023 Signed by Dumbacher, David on 08/21/23
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII: DRP RII: DRP NAME N. Childs D. Dumbacher DATE 08/21/23 08/21/23
Site Inspection Activity Plan Enclosure Robinson 09/01/2023 - 06/30/2025 FORCE-ON-FORCE PLANNING AND EXERCISE - ROB
2 10/23/2023 10/27/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
11/13/2023 11/17/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing FOCUSED ENGINEERING INSPECTION (FPTI)
2 10/16/2023 10/20/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
10/30/2023 11/3/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
PROBLEM IDENTIFICATION & RESOLUTION
2 3/4/2024 3/8/2024 IP 71152B 000747 Problem Identification and Resolution
3/18/2024 3/22/2024 IP 71152B 000747 Problem Identification and Resolution FOCUSED ENGINEERING INSPECTIONS (CGD)
2 4/29/2024 5/3/2024 IP 71111.21N.03 001808 Commercial Grade Dedication
5/13/2024 5/17/2024 IP 71111.21N.03 001808 Commercial Grade Dedication EMERGENCY PREPAREDNESS PROGRAM INSPECTION
2 6/3/2024 6/7/2024 IP 71114.02 000717 Alert and Notification System Testing
6/3/2024 6/7/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
6/3/2024 6/7/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
6/3/2024 6/7/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness
6/3/2024 6/7/2024 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION
2 8/12/2024 8/16/2024 IP 71130.02 000734 Access Control
8/12/2024 8/16/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
8/12/2024 8/16/2024 IP 71130.07 000739 Security Training
8/12/2024 8/16/2024 IP 71130.09 001656 Security Plan Changes
8/12/2024 8/16/2024 IP 71151 001338 Performance Indicator Verification ROBINSON INITIAL LICENSE EXAM
2 8/5/2024 8/10/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
9/9/2024 9/21/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
TARGET SET INSPECTION
UNIT 2 IN-SERVICE INSPECTION +SG
2 11/18/2024 11/29/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
2 10/7/2024 10/11/2024 IP 71130.14 000743 Review of Power Reactor Target Sets Unit Start End Activity CAC Title Staff Count
11/18/2024 11/22/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
Site Inspection Activity Plan
2 11/18/2024 11/22/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
11/18/2024 11/22/2024 IP 71124.04 000728 Occupational Dose Assessment
11/18/2024 11/22/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation
11/18/2024 11/22/2024 IP 71151 000746 Performance Indicator Verification
12/9/2024 12/13/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
12/9/2024 12/13/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
12/9/2024 12/13/2024 IP 71124.04 000728 Occupational Dose Assessment
12/9/2024 12/13/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation
12/9/2024 12/13/2024 IP 71151 000746 Performance Indicator Verification MATERIAL CONTROL AND ACCOUNTING
2 2/3/2025 2/7/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
ROBINSON REQUAL
2 2/9/2025 2/15/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance