Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006
ML21061A240
Person / Time
Site: Robinson Duke energy icon.png
Issue date: 03/03/2021
From: Booma Venkataraman
Division Reactor Projects II
To: Kapopoulos E
Duke Energy Progress
References
IR 2020006
Download: ML21061A240 (6)


Text

March 3, 2021

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - REPORT 05000261/2020006

Dear Mr. Kapopoulos:

The Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of H.B. Robinson Steam Electric Plant Unit 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2020, through December 31, 2020. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at H.B. Robinson Steam Electric Plant Unit 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2022. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

Additionally, during this period the NRC will schedule an additional inspection per a revised version Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html Please contact me at 301-415-2934 with any questions you have regarding this letter.

Sincerely,

/RA/

Booma Venkataraman, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-261 License Nos.: DPR-23 Enclosure:

Robinson Inspection/Activity Plan (03/01/2021 - 12/31/2022)

cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - REPORT 05000261/2020006 DATED: March 3, 2021 DISTRIBUTION:

M. Kowal, RII L. Gibson, RII S. Price, RII OE MAIL RIDSNRRDRO PUBLIC RidsNrrPMRobinson Resource ROPassessment Resource ROPreports Resource ADAMS Accession No. ML21061A240 OFFICE RII: DRP RII: DRP RII: DRP NAME J. Hamman A. Wilson B. Venkataraman DATA 2/24/21 2/24/2021 3/3/2021 OFFICAL RECORD COPY

IP 22 Inspection Activity Plan Report Robinson 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count MATERIAL CONTROL & ACCOUNTING - ROB 1 2 01/01/2021 12/31/2021 IP 71130.11 000742 Material Control and Accounting (MC&A)

EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3 2 03/01/2021 03/05/2021 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments CYBER SECURITY INSPECTION 4 2 04/12/2021 04/16/2021 IP 71130.10P 000741 Cyber Security 2 04/26/2021 04/30/2021 IP 71130.10P 000741 Cyber Security RP PUBLIC RAD SAFETY AND TRANSPORTATION INSPECTION 3 2 05/10/2021 05/14/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 2 05/10/2021 05/14/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program 2 05/10/2021 05/14/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation 2 05/10/2021 05/14/2021 IP 71151 000746 Performance Indicator Verification EMERGENCY PREPAREDNESS EXERCISE 5 2 05/17/2021 05/21/2021 IP 71114.01 000716 Exercise Evaluation 2 05/17/2021 05/21/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2 05/17/2021 05/21/2021 IP 71151 001397 Performance Indicator Verification TRIENNIAL HEAT SINK PERFORMANCE 1 2 07/19/2021 07/23/2021 IP 71111.07T 000700 Heat Sink Performance ROBINSON INITIAL LICENSE EXAM 3 2 08/16/2021 08/20/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 09/20/2021 10/01/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

SECURITY BASELINE INSPECTION 1 2 10/18/2021 10/22/2021 IP 71130.02 000734 Access Control 2 10/18/2021 10/22/2021 IP 71130.09 001656 Security Plan Changes 2 10/18/2021 10/22/2021 IP 71151 001338 Performance Indicator Verification TARGET SET INSPECTION 2 2 10/25/2021 10/29/2021 IP 71130.14 000743 Review of Power Reactor Target Sets This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Robinson 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2 2 12/06/2021 12/10/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2 12/06/2021 12/10/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 2 12/06/2021 12/10/2021 IP 71151 000746 Performance Indicator Verification DUKE CORPORATE AA/FFD BASELINE SECURITY INSPECTION 2 2 01/10/2022 01/14/2022 IP 71130.01 000733 Access Authorization 2 01/10/2022 01/14/2022 IP 71130.08 000740 Fitness For Duty Program SECURITY BASELINE INSPECTION 1 2 02/14/2022 02/18/2022 IP 71130.01 000733 Access Authorization 2 02/14/2022 02/18/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2 02/14/2022 02/18/2022 IP 71130.07 000739 Security Training 2 02/14/2022 02/18/2022 IP 71130.08 000740 Fitness For Duty Program EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 2 06/06/2022 06/10/2022 IP 71114.02 000717 Alert and Notification System Testing 2 06/06/2022 06/10/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2 06/06/2022 06/10/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2 06/06/2022 06/10/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 2 06/06/2022 06/10/2022 IP 71151 001397 Performance Indicator Verification PROBLEM IDENTIFICATION AND RESOLUTION 4 2 06/06/2022 06/24/2022 IP 71152B 000747 Problem Identification and Resolution DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6 2 07/25/2022 07/29/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

2 08/08/2022 08/12/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

ROBINSON INITIAL LICENSE EXAM 3 2 08/29/2022 09/02/2022 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 10/03/2022 10/14/2022 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

SECURITY BASELINE INSPECTION 1 2 09/19/2022 09/23/2022 IP 71130.02 000734 Access Control 2 09/19/2022 09/23/2022 IP 71130.09 001656 Security Plan Changes This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Robinson 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count SECURITY BASELINE INSPECTION 1 2 09/19/2022 09/23/2022 IP 71151 001338 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION +SG 2 2 11/21/2022 11/25/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 4 2 11/28/2022 12/02/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2 11/28/2022 12/02/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2 11/28/2022 12/02/2022 IP 71124.04 000728 Occupational Dose Assessment 2 11/28/2022 12/02/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 2 11/28/2022 12/02/2022 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.