MONTHYEARML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) ML23131A4192023-05-10010 May 2023 003 Radiation Safety Baseline Inspection Information Request IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML21295A2992021-10-22022 October 2021 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021004 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 ML20191A2192020-07-0909 July 2020 Notification of Conduct of a Fire Protection Team Baseline Inspection U.S. Nuclear Regulatory Commission Inspection Report No. 05000261/2020012 ML19347D1072019-12-13013 December 2019 Plan - Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20190052019-08-28028 August 2019 Updated Inspection Plan for H.B. Robinson Steam Electric Plant, Unit 2 - (Report 05000261/2019005) ML19232A4172019-08-20020 August 2019 Radiation Safety Baseline Inspection RFI 2019-004 IR 05000261/20180062019-03-0404 March 2019 Annual Assessment Letter for H. B. Robinson Steam Electric Plant, Unit 2 - Report 05000261/2018006, Report 05000261/2018402, Report 05000261/2018501 IR 05000261/20180052018-08-23023 August 2018 Updated Inspection Plan for H.B. Robinson Steam Electric Plant Unit 2 (Inspection Report 05000261/2018005) ML18215A1352018-08-0303 August 2018 U2 Baseline In-Service Inspection 2018003 Public ML18172A1142018-06-20020 June 2018 Radiation Safety Baseline Inspection Emailed Initial Information Request 2018003 ML18115A0512018-04-25025 April 2018 RP Inspect Info & Doc Request IR 05000261/20170062018-02-28028 February 2018 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261/2017006, Report 05000261/2017402, Report 05000261/2017501 IR 05000261/20170052017-08-28028 August 2017 Updated Inspection Plan for H. B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2017005 IR 05000261/20160062017-03-0101 March 2017 Annual Assessment Letter for H. B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2016006 ML17021A0042017-01-20020 January 2017 Notification of Inspection and Request for Information IR 05000261/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for H.B Robinson Steam Electric Plant - NRC Inspection Report 05000261/2016005 ML16092A2002016-03-29029 March 2016 Notification of H.B. Robinson Steam Electric Plant - Component Design Bases Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000261/2016008 IR 05000261/20150062016-03-0202 March 2016 Annual Assessment Letter for H.B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2015006 IR 05000261/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for H.B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2015005 IR 05000261/20140012015-03-0404 March 2015 Annual Assessment Letter for H.B. Robinson Steam Electric Plant NRC Inspection Report 05000261/2014001 ML14245A1732014-09-0202 September 2014 Mid-Cycle Ltr 2014 ML14063A1832014-03-0404 March 2014 2013 Annual Assessment Letter for H.B. Robinson Steam Electric Plant ML13246A0682013-09-0303 September 2013 Mid Cycle Assessment Letter ML13224A3172013-08-12012 August 2013 Notification of Inspection and Request for Information ML13085A1272013-03-26026 March 2013 Notification of Inspection and Request for Information IR 05000261/20120012013-03-0404 March 2013 Annual Assessment Letter for H.B. Robinson Steam Electric Plant (NRC Inspection Report 05000261/2012001) ML12248A1642012-09-0404 September 2012 Mid Cycle Assessment Letter Robinson 2012 ML12209A3772012-07-27027 July 2012 IR 05000261-12-008, on 01/01/2012, H.B. Robinson Steam Electric Plant-Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML1206504242012-03-0505 March 2012 End of Cycle Assessment Report 22 IR 05000261/20110012011-03-0404 March 2011 Annual Assessment Letter (Report 05000261/2011001) ML1024405952010-09-0101 September 2010 Report 22 - 2010 Mid Cycle Inspection/Activity Plan ML1006209802010-03-0303 March 2010 Report 22 - 2010001 Inspection/Activity Plan ML0924405542009-09-0101 September 2009 Inspection/Activity Plan, Report 22, 09/01/2009 - 12/31/2010 RNP-RA/09-0067, Nickel-Alloy Nozzles and Penetrations Program Inspection Plan2009-07-29029 July 2009 Nickel-Alloy Nozzles and Penetrations Program Inspection Plan ML0824610022008-09-0202 September 2008 Inspection / Activity Plan, 09/01/2008 - 12/31/2009, Report 22 IR 05000261/20080012008-03-0303 March 2008 Annual Assessment Letter (IR 05000261-08-001) ML0724306772007-08-31031 August 2007 Mid-Cycle 2007 Report ML0724702262007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - H.B. Robinson Steam Electric Plant Unit 2 ML0706001892007-03-0101 March 2007 Inspection / Activity Plan 03/01/2007 - 09/30/2008 - Report 22 ML0624304422006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08 ML0606103992006-03-0202 March 2006 Inspection/Activity Plan for 03/01/2006 - 09/30/2007 2023-08-23
[Table view] Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] |
Text
March 3, 2021
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - REPORT 05000261/2020006
Dear Mr. Kapopoulos:
The Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of H.B. Robinson Steam Electric Plant Unit 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2020, through December 31, 2020. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at H.B. Robinson Steam Electric Plant Unit 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2022. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
Additionally, during this period the NRC will schedule an additional inspection per a revised version Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html Please contact me at 301-415-2934 with any questions you have regarding this letter.
Sincerely,
/RA/
Booma Venkataraman, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-261 License Nos.: DPR-23 Enclosure:
Robinson Inspection/Activity Plan (03/01/2021 - 12/31/2022)
cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - REPORT 05000261/2020006 DATED: March 3, 2021 DISTRIBUTION:
M. Kowal, RII L. Gibson, RII S. Price, RII OE MAIL RIDSNRRDRO PUBLIC RidsNrrPMRobinson Resource ROPassessment Resource ROPreports Resource ADAMS Accession No. ML21061A240 OFFICE RII: DRP RII: DRP RII: DRP NAME J. Hamman A. Wilson B. Venkataraman DATA 2/24/21 2/24/2021 3/3/2021 OFFICAL RECORD COPY
IP 22 Inspection Activity Plan Report Robinson 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count MATERIAL CONTROL & ACCOUNTING - ROB 1 2 01/01/2021 12/31/2021 IP 71130.11 000742 Material Control and Accounting (MC&A)
EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3 2 03/01/2021 03/05/2021 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments CYBER SECURITY INSPECTION 4 2 04/12/2021 04/16/2021 IP 71130.10P 000741 Cyber Security 2 04/26/2021 04/30/2021 IP 71130.10P 000741 Cyber Security RP PUBLIC RAD SAFETY AND TRANSPORTATION INSPECTION 3 2 05/10/2021 05/14/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 2 05/10/2021 05/14/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program 2 05/10/2021 05/14/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation 2 05/10/2021 05/14/2021 IP 71151 000746 Performance Indicator Verification EMERGENCY PREPAREDNESS EXERCISE 5 2 05/17/2021 05/21/2021 IP 71114.01 000716 Exercise Evaluation 2 05/17/2021 05/21/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2 05/17/2021 05/21/2021 IP 71151 001397 Performance Indicator Verification TRIENNIAL HEAT SINK PERFORMANCE 1 2 07/19/2021 07/23/2021 IP 71111.07T 000700 Heat Sink Performance ROBINSON INITIAL LICENSE EXAM 3 2 08/16/2021 08/20/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
2 09/20/2021 10/01/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
SECURITY BASELINE INSPECTION 1 2 10/18/2021 10/22/2021 IP 71130.02 000734 Access Control 2 10/18/2021 10/22/2021 IP 71130.09 001656 Security Plan Changes 2 10/18/2021 10/22/2021 IP 71151 001338 Performance Indicator Verification TARGET SET INSPECTION 2 2 10/25/2021 10/29/2021 IP 71130.14 000743 Review of Power Reactor Target Sets This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report Robinson 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2 2 12/06/2021 12/10/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2 12/06/2021 12/10/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 2 12/06/2021 12/10/2021 IP 71151 000746 Performance Indicator Verification DUKE CORPORATE AA/FFD BASELINE SECURITY INSPECTION 2 2 01/10/2022 01/14/2022 IP 71130.01 000733 Access Authorization 2 01/10/2022 01/14/2022 IP 71130.08 000740 Fitness For Duty Program SECURITY BASELINE INSPECTION 1 2 02/14/2022 02/18/2022 IP 71130.01 000733 Access Authorization 2 02/14/2022 02/18/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2 02/14/2022 02/18/2022 IP 71130.07 000739 Security Training 2 02/14/2022 02/18/2022 IP 71130.08 000740 Fitness For Duty Program EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 2 06/06/2022 06/10/2022 IP 71114.02 000717 Alert and Notification System Testing 2 06/06/2022 06/10/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2 06/06/2022 06/10/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2 06/06/2022 06/10/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 2 06/06/2022 06/10/2022 IP 71151 001397 Performance Indicator Verification PROBLEM IDENTIFICATION AND RESOLUTION 4 2 06/06/2022 06/24/2022 IP 71152B 000747 Problem Identification and Resolution DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6 2 07/25/2022 07/29/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
2 08/08/2022 08/12/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
ROBINSON INITIAL LICENSE EXAM 3 2 08/29/2022 09/02/2022 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
2 10/03/2022 10/14/2022 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
SECURITY BASELINE INSPECTION 1 2 09/19/2022 09/23/2022 IP 71130.02 000734 Access Control 2 09/19/2022 09/23/2022 IP 71130.09 001656 Security Plan Changes This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report Robinson 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count SECURITY BASELINE INSPECTION 1 2 09/19/2022 09/23/2022 IP 71151 001338 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION +SG 2 2 11/21/2022 11/25/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 4 2 11/28/2022 12/02/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2 11/28/2022 12/02/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2 11/28/2022 12/02/2022 IP 71124.04 000728 Occupational Dose Assessment 2 11/28/2022 12/02/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 2 11/28/2022 12/02/2022 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.