Category:INSPECTION REPORT
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20240042024-10-0303 October 2024 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 05000261/2024004 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter 2024-09-11
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000261/19990041999-07-30030 July 1999 Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occured & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19990031999-06-16016 June 1999 Insp Rept 50-261/99-03 on 990411-0522.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19990021999-05-11011 May 1999 Insp Rept 50-261/99-02 on 990228-0410.One NCV Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000261/19990011999-03-29029 March 1999 Insp Rept 50-261/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980121999-02-12012 February 1999 Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980131999-01-0808 January 1999 Partially Withheld Insp Rept 50-261/98-13 on 981207-11 (Per 10CFR73.21).No Violations Identified.Major Areas Inspected: Physical Security Program for Power Reactors IR 05000261/19980111998-12-23023 December 1998 Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980091998-11-23023 November 1998 Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19980081998-10-0909 October 1998 Insp Rept 50-261/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980061998-07-16016 July 1998 Insp Rept 50-261/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs IR 05000261/19980021998-04-27027 April 1998 Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000261/19970141998-02-10010 February 1998 Errata to Insp Rept 50-261/97-14,transmitted on 980202.Typo Was Discovered on Pages 9 & 12 of Rept ML14181A9781998-02-0202 February 1998 Insp Rept 50-261/97-14 on 971123-980103.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML14181A9591997-11-0707 November 1997 Insp Rept 50-261/97-10 on 970831-1011.Violations Noted But Not Cited & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19970081997-08-18018 August 1997 Insp Rept 50-261/97-08 on 970608-0719.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19972011997-08-14014 August 1997 Insp Rept 50-261/97-201 on 970407-0523.No Violations Noted. Major Areas Inspected:Si & AFW Sys & Support Sys ML14181A9331997-07-0707 July 1997 Insp Rept 50-261/97-07 on 970427-0607.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970041997-04-18018 April 1997 Insp Rept 50-261/97-04 on 970209-0322.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970051997-04-18018 April 1997 Insp Rept 50-261/97-05 on 970317-21.No Violations Noted. Major Areas Inspected:Plant Support & Security Program Plans IR 05000261/19970011997-03-24024 March 1997 Pages 1 & 29 to Insp Rept 50-261/97-01 ML14181A8811997-02-28028 February 1997 Insp Repts 50-261/97-02,50-324/97-01 & 50-325/97-01 & 50-400-97-02 on 970113-0206.Violations Noted.Major Areas Inspected:Access Authorization & Fitness for Duty Programs ML14181A8551996-12-16016 December 1996 Insp Rept 50-261/96-12 on 960928-1116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19960081996-08-0101 August 1996 Insp Rept 50-261/96-08 on 960526-0706.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19960071996-06-28028 June 1996 Insp Rept 50-261/96-07 on 960603-14.No Violations Noted. Major Areas Inspected:Integrated Performance Assessment to Development Perspective of Plant Strengths & Weaknesses; Operations,Maint,Engineering,Plant Support,Safety,Security IR 05000261/19960051996-06-24024 June 1996 Insp Rept 50-261/96-05 on 960414-0525.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000261/19960041996-05-10010 May 1996 Insp Rept 50-261/96-04 on 960303-0413.No Violations Noted. Major Areas Inspected:Plant Operations,Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems & Close Out of Items & Fire Protection Program ML14181A8161996-04-23023 April 1996 Insp Rept 50-261/96-03 on 960311-0404.Violations Noted. Major Areas Inspected:Security Program for Power Reactors, Mgt Support,Security Program Plans & Procedures;Safeguards Info,Audits & Security Lighting IR 05000261/19960021996-03-27027 March 1996 Insp Rept 50-261/96-02 on 960121-0302.No Violations Noted. Major Areas Inspected:Plant Operations,Close Out of Open Issues,Maint & Surveillance,Physical Security Program, Internal & External Exposure Controls & Training IR 05000261/19950301996-01-26026 January 1996 Insp Rept 50-261/95-30 on 951126-1231.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Surveillance,Engineering & Plant Support IR 05000261/19950291995-12-20020 December 1995 Insp Rept 50-261/95-29 on 951022-1125.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Function IR 05000261/19950281995-12-14014 December 1995 Insp Rept 50-261/95-28 on 951030-1103.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000261/19950261995-10-0404 October 1995 Insp Rept 50-261/95-26 on 950827-0916.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Functions IR 05000261/19950211995-08-10010 August 1995 Insp Rept 50-261/95-21 on 950618-0715.Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Functions IR 05000261/19950201995-07-10010 July 1995 Insp Rept 50-261/95-20 on Stated Date.No Violations or Deviations Noted.Major Areas Inspected:Licensee Efforts Re Violations & Open Items Noted During SW Operational Performance Insp IR 05000261/19950151995-06-28028 June 1995 Insp Rept 50-261/95-15 on 950530-0602.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Occupational Radiation Protection Program During Extended Outages IR 05000261/19950171995-06-26026 June 1995 Insp Rept 50-261/95-17 on 950605-09.No Violations Noted. Major Areas Inspected:Emergency Operating Procedures & CA for Previously Identified Deficiencies IR 05000261/19950111995-05-0202 May 1995 Insp Rept 50-261/95-11 on 950403-07.No Violations Noted. Major Areas Inspected:Emergency Response Training,Emergency Notifications & Communications & Protective Action Decision Making IR 05000261/19950101995-04-28028 April 1995 Insp Rept 50-261/95-10 on 950327-31.No Violations Noted. Major Areas Inspected:Insp Conducted in Areas of Risked Based Operational Safety Including Control Room Observation & Review of Corrective Action Taken on Previous Insp Items IR 05000205/20030181995-04-17017 April 1995 Insp Rept 50-261/95-06 on 950205-0318.Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Observation,Maint Observation & follow-up IR 05000227/20030031995-04-0909 April 1995 Insp Rept 50-261/95-07 on 950227-0303.Violations Noted. Major Areas Inspected:Design Changes & Plant Mods, Engineering & Technical Support & Follow Up on Previous Insp Findings IR 05000103/20020111995-03-0606 March 1995 Insp Rept 50-261/95-03 on 950103-0211.Noncited Violations Identified.Major Areas Inspected:Plant Operations,Maint Observation,Engineering Evaluation & Plant Support Activities IR 05000261/19950041995-02-24024 February 1995 Insp Rept 50-261/95-04 on 950123-27.No Violations or Deviations Noted.Major Areas Inspected:Semiannual Radiological Effluent Release Rept,Radiological Environmental Program & Process & Effluent Monitoring IR 05000261/19940281995-01-20020 January 1995 Insp Rept 50-261/94-28 on 941204-950102.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance Observation,Plant Safety Review Committee Activities & Followup IR 05000261/19940251994-10-13013 October 1994 Insp Rept 50-261/94-25 on 940912-16.No Violations or Deviations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities ML14181A6151994-10-0505 October 1994 Insp Rept 50-261/94-23 on 940821-0924.Violations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Operator Overtime & Followup ML14181A6101994-10-0404 October 1994 Insp Rept 50-261/94-24 on 940912-16.Violations Noted.Major Areas Inspected:Review of Licensee Status Re Implementation of SBO Rule & Corrective Actions for Previous Inspection Findings in Electrical Area IR 05000261/19940191994-09-0707 September 1994 Insp Rept 50-261/94-19 on 940724-0820.No Violations Noted. Major Areas Inspected:Plant Operations,Surveillance Operations,Maint Observation,Plant Support & Followup 1999-07-30
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20240042024-10-0303 October 2024 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 05000261/2024004 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter 2024-09-11
[Table view] Category:UTILITY
MONTHYEARIR 05000261/19900211990-10-16016 October 1990 Insp Rept 50-261/90-21 on 901001-05.Violation Noted.Major Areas Inspected:Observation of Inservice Insp & Work Activities IR 05000261/19900191990-09-11011 September 1990 Insp Rept 50-261/90-19 on 900820-24.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings IR 05000261/19900181990-09-0606 September 1990 Insp Repts 50-261/90-18 on 900813-17.Violations Noted,But Not Cited.Major Areas Inspected:Radiological Effluents,Plant Chemistry,Confirmatory Measurements,Pass & Radiation Monitoring IR 05000261/19900171990-09-0606 September 1990 Insp Rept 50-261/90-17 on 900711-0810.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Observation,Maint Observation,Onsite Review Committee & Written Repts of Nonroutine Events IR 05000261/19900101990-08-0707 August 1990 Insp Rept 50-261/90-10 on 900521-25,0604-08,25-29 & 0713.No Violations or Deviations Noted.Major Areas Inspected: in-depth Team Insp of Maint Program & Implementation IR 05000261/19900161990-08-0202 August 1990 Insp Rept 50-261/90-16 on 900716-20.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing & Followup on Previous Insp Findings.Weaknesses Identified for Valves in Component Cooling Water Sys IR 05000261/19900151990-08-0202 August 1990 Insp Rept 50-261/90-15 on 900710-13.No Violations or Deviations Noted.Major Areas Inspected:Inspector Follow Up Items & Violations Re Electrical & Fire Protection Sys & Licensee Fire Protection Program IR 05000261/19900141990-08-0202 August 1990 Insp Rept 50-261/90-14 on 900611-0710. No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation, self-assessment Capability & Outage Preparations IR 05000261/19900121990-07-0202 July 1990 Insp Rept 50-261/90-12 on 900511-0610.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Esf Sys Walkdown,Maint Observation & Onsite Followup of Events IR 05000261/19900051990-04-24024 April 1990 Insp Rept 50-261/90-05 on 900311-0410.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Maint Observation & Insp of Quality Verification Functions IR 05000261/19900071990-04-19019 April 1990 Insp Rept 50-261/90-07 on 900402-06.No Violations or Deviations Identified.Major Areas Inspected:Design Changes & Mods IR 05000261/19900061990-04-16016 April 1990 Operational Safety Team Insp Rept 50-261/90-06 on 900402-05. No Violations Noted.Major Areas Inspected:Review of Four Violations,One Unresolved Item & Ten Inspector Followup Items IR 05000261/19900041990-04-0404 April 1990 Insp Rept 50-261/90-04 on 900319-23.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Commercial Grade Procurement & Licensee Action on Previously Identified Insp Findings ML14176A8441990-03-0808 March 1990 Insp Rept 50-261/90-02 on 900111-0220.Violation Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation & Onsite Followup of Events at Operating Power Reactors IR 05000261/19900011990-02-26026 February 1990 Insp Rept 50-261/90-01 on 900129-0202.No Violations or Deviations Noted.Major Areas Inspected:Licensee Corrective Action on Previous Insp Findings,Radiographic Film & 1988 Refueling Outage Inservice Insp 90-day Rept IR 05000261/19890321990-02-0808 February 1990 Insp Rept 50-261/89-32 on 891216-900110.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Esf Sys Walkdown & Onsite Followup of Events at Reactors ML14176A8311990-01-29029 January 1990 Insp Rept 50-261/89-31 on 891212-13.No Violations or Deviations Noted.Major Areas Inspected:Sequencing & Loading Electrical Safeguards Equipment Onto Safety Buses in Response to Unresolved Item 89-25-02 Re Overlap Problem IR 05000261/19890291990-01-11011 January 1990 Partially Withheld Insp Rept 50-261/89-29 on 891204-08 (Ref 10CFR2.790(d) & 73.21).Violations Noted Re Protected Area Assessment.Major Areas Inspected:Physical Security Program, Including Audits,Barriers,Access Controls & Alarm Stations IR 05000261/19890251990-01-0808 January 1990 Insp Rept 50-261/89-25 on 891111-1215.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Esf Walkdown & Evaluation of self-assessment Capability IR 05000261/19890271989-12-11011 December 1989 Insp Rept 50-261/89-27 on 891113-16.No Violations or Deviation Noted.Weaknesses Noted.Major Areas Inspected: Annual Emergency Response Exercise & Emergency Organization Activation & Response in Control Room IR 05000261/19890241989-11-21021 November 1989 Partially Withheld Insp Rept 50-261/89-24 on 891016-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted. Major Areas Inspected:Physical Security Program for Power Reactors,Specifically Mgt Support/Plans & Alarm Stations IR 05000261/19890281989-11-16016 November 1989 Insp Rept 50-261/89-28 on 891030-1103.No Violations or Deviations Noted.Major Areas Inspected:Organization & Mgt Controls,Control of Radioactive Matls & Contamination Surveys & Followup on Previous Inspector Identified Items IR 05000261/19890171989-10-0606 October 1989 Insp Rept 50-261/89-17 on 890811-0910.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Physical Protection,Surveillance & Maint Observations & Event Followup IR 05000261/19890211989-09-29029 September 1989 Partially Withheld Insp Rept 50-261/89-21 on 890911-15 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000261/19890181989-09-14014 September 1989 Insp Rept 50-261/89-18 on 890814-0908.Violations Noted.Major Areas Inspected:Inoperability of Auxiliary Feedwater Sys IR 05000261/19890201989-09-14014 September 1989 Insp Rept 50-261/89-20 on 890827-0901.No Violations Noted. Major Areas Inspected:Selective Exams of Procedures & Representative Records,Interviews W/Personnel & Observation of Activities in Progress IR 05000261/19890151989-09-0707 September 1989 Insp Rept 50-261/89-15 on 890814-17.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation & Supplies,Organization & Mgt Control & Training IR 05000261/19890131989-08-31031 August 1989 Insp Rept 50-261/89-13 on 890711-0810.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation & Followup on Corrective Action for Violations IR 05000261/19890141989-08-24024 August 1989 Insp Rept 50-261/89-14 on 890731-0804.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Plant Chemistry & Environ Monitoring ML14176A7551989-07-12012 July 1989 Insp Rept 50-261/89-200 on 890522-26.No Violations Noted. Major Areas Inspected:To Determine Whether Motor Operated Valves Designed,Installed & Being Maintained in Manner That Would Ensure Capability to Perform ML14191B1161989-05-18018 May 1989 Insp Rept 50-261/89-08 on 890311-0417.Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Observation,Maint Observation,Esf Sys Walkdown & Onsite Followup of Events at Operating Power Reactors ML14191B0991989-03-10010 March 1989 Insp Rept 50-261/89-03 on 890111-0210.Violations Noted.Major Areas Inspected:Operational Safety Verification,Physical Protection,Surveillance Observation,Maint Observation,Esf Sys Walkdown & Onsite Review Committee IR 05000261/19890061989-03-0303 March 1989 Insp Rept 50-261/89-06 on 890206-09.Licensee-identified Item Re Failure to Follow Procedures for Access Into Radiation Area Noted.Major Areas Inspected:Procedures Re Transfer of Spent Fuel from Spent Fuel Pool to ISFSI IR 05000261/19890041989-02-23023 February 1989 Insp Rept 50-261/89-04 on 890130-0203.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Chemistry & Health Physics Practices Associated W/Spent Fuel Transfer Operations IR 05000261/19880381989-02-0606 February 1989 Insp Rept 50-261/88-38 on 881211-890110.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Physical Protection,Surveillance & Maint Observation & Onsite Followup of Events at Reactors & Mods ML14191B0731989-01-19019 January 1989 Insp Rept 50-261/88-36 on 881219-21.Violations Noted.Major Areas Inspected:Followup on Recently Identified Operating Events Involving Nonenviron Qualified Splices on Containment Fans & RCS High Point Vent Sys Not on Master List IR 05000261/19880311989-01-11011 January 1989 Insp Rept 50-261/88-31 on 881212-16.No Violations or Deviations Noted.Major Areas inspected:post-fire Safe Shutdown Capability Reverification & Assessment (Module 64510),including Functioning Configuration Mgt Program IR 05000324/19880331989-01-11011 January 1989 Insp Repts 50-324/88-33 & 50-325/88-33 on 880919-23.No Violations or Deviations Noted.Major Areas Inspected: Licensee Program to Maintain Occupational Exposures ALARA IR 05000261/19880351988-12-30030 December 1988 Corrected Rept Cover Sheet to Insp Rept 50-261/88-35 on 881128-1202.No Violations or Deviations Noted.Major Areas Noted:Resistance Temp Detector Bypass Elimination & Svc Water Sys Piping Replacement Mods IR 05000261/19880141988-12-21021 December 1988 Insp Rept 50-261/88-14 on 881128-1202.No Violations or Deviations Noted.Major Areas Inspected:Resistance Temp Detector Bypass Elimination & Svc Water Sys Piping Replacement Mods IR 05000261/19880331988-12-20020 December 1988 Insp Rept 50-261/88-33 on 881114-18.No Violations or Deviations Noted.Major Areas Inspected:Design Control,Design Changes & Mods IR 05000261/19880341988-12-20020 December 1988 Insp Rept 50-261/88-34 on 881111-1210.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Physical Protection,Surveillance Observation,Maint Observation & Onsite Followup of Events ML14191B0321988-12-0909 December 1988 Insp Rept 50-261/88-30 on 881011-1110.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Physical Protection,Surveillance Observation,Maint Observation & Onsite Followup of Events IR 05000261/19880231988-10-12012 October 1988 Corrected Page to Insp Rept 50-261/88-23 on 880811-0910.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Physical Protection, Surveillance Observation & Maint Observation ML14191B0151988-10-12012 October 1988 Insp Rept 50-261/88-23 on 880811-0910.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Physical Protection,Surveillance & Maint Observation,Esf Sys Walkdown & Onsite Review Committee IR 05000261/19880271988-10-0505 October 1988 Insp Rept 50-261/88-27 on 880912-14.No Violations or Deviations Noted.Major Areas Inspected:Biofouling of Containment Coolers.Licensee Actions After Identification of Potential Compromise of Containment Integrity Comprehensive IR 05000261/19880251988-09-28028 September 1988 Insp Rept 50-261/88-25 on 880829-0902.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention.Weakness Noted:During Exercise,One Individual Did Not Don self-contained Breathing Apparatus in Auxiliary Bldg IR 05000261/19880221988-09-19019 September 1988 Insp Rept 50-261/88-22 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities,Equipment, Instrumentation,Supplies & Organization & Mgt Control IR 05000261/19880241988-09-0707 September 1988 Insp Rept 50-261/88-24 on 880725-29.No Violations Noted. Major Areas Inspected:Svc Water Design Verification & Survey of Current Svc Water Initiatives.Potential Deficiencies Identified Re Svc Water Sys Per Updated FSAR Design IR 05000261/19880201988-08-31031 August 1988 Insp Rept 50-261/88-20 on 880801-03.No Violations or Deviations Noted.Major Areas Inspected:Observation & Evaluation of Key Emergency & Organizational Functions During partial-participation Exercise.Related Info Encl 1990-09-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-039, on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected1999-09-30030 September 1999 PNO-II-99-039:on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected IR 05000261/19990041999-07-30030 July 1999 Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occured & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19990031999-06-16016 June 1999 Insp Rept 50-261/99-03 on 990411-0522.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19990021999-05-11011 May 1999 Insp Rept 50-261/99-02 on 990228-0410.One NCV Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000261/19990011999-03-29029 March 1999 Insp Rept 50-261/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980121999-02-12012 February 1999 Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980131999-01-0808 January 1999 Partially Withheld Insp Rept 50-261/98-13 on 981207-11 (Per 10CFR73.21).No Violations Identified.Major Areas Inspected: Physical Security Program for Power Reactors IR 05000261/19980111998-12-23023 December 1998 Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980091998-11-23023 November 1998 Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19980081998-10-0909 October 1998 Insp Rept 50-261/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980061998-07-16016 July 1998 Insp Rept 50-261/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs IR 05000261/19980031998-06-0909 June 1998 Errata to Notice of Violation of Insp Rept 50-261/98-03, Conducted on 980105-09.Correction Reflects More Accurately That Licensee Actions Taken to Correct Violation Were Ineffective in Correcting Condition IR 05000261/19980021998-04-27027 April 1998 Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors ML14181A9961998-03-12012 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:As of 970407,licensee Failed to Revise UFSAR to Include Following Effects of Changes Made in Facility or Procedures as Described in UFSAR ML14181A9911998-03-0404 March 1998 Notice of Violations from Insp on 980105-09.Violations Noted:Licensee Failed to Verify Adequacy of Design to Substantiate Final Design Documents Met Design Inputs & Adequate for Design Change Affecting Pumps B & C IR 05000261/19970141998-02-10010 February 1998 Errata to Insp Rept 50-261/97-14,transmitted on 980202.Typo Was Discovered on Pages 9 & 12 of Rept ML14181A9811998-02-0606 February 1998 Notice of Violation from Insp on 980105-09.Violation Noted: as of 970407,licensee Failed to Correct Conditions Adverse to Quality Associated W/Instrument Sensing Line Slope Deficiencies Documented in Ltrs & 960221 ML14181A9781998-02-0202 February 1998 Insp Rept 50-261/97-14 on 971123-980103.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 07100012/20110221997-12-22022 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Accomplish Mod Related Activities as Evidenced.On 971007,licensee Did Not Evaluate Post Mod Test Acceptance Criteria for Measuring Total Air Flow ML20197E4841997-12-12012 December 1997 Notice of Violation from Insp on 970831-1011 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Establish Measures to Assure That Conditions Adverse to Quality Promptly Identified ML14181A3961997-12-0909 December 1997 EN-97-111:on 971212,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Re Failure to Identify Promptly & Correct Mispositioned EDG Output Breaker Switch ML14181A9591997-11-0707 November 1997 Insp Rept 50-261/97-10 on 970831-1011.Violations Noted But Not Cited & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML14181A9481997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:Reactor Trip Channels Had Not Been Calibrated IAW Formula Specified in TS 2.3.1.2.e IR 05000261/19970081997-08-18018 August 1997 Insp Rept 50-261/97-08 on 970608-0719.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19972011997-08-14014 August 1997 Insp Rept 50-261/97-201 on 970407-0523.No Violations Noted. Major Areas Inspected:Si & AFW Sys & Support Sys ML14181A9331997-07-0707 July 1997 Insp Rept 50-261/97-07 on 970427-0607.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970041997-04-18018 April 1997 Insp Rept 50-261/97-04 on 970209-0322.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A9001997-04-18018 April 1997 Notice of Violation from Insp on 970209-0322.Violation Noted:On 970224,during Performance of Special Process Procedure SPP-002,freeze Plugging of Piping Not Requiring Brittle Fracture Steps 7.3.3,7.3.8 & 7.3.9 Not Followed IR 05000261/19970051997-04-18018 April 1997 Insp Rept 50-261/97-05 on 970317-21.No Violations Noted. Major Areas Inspected:Plant Support & Security Program Plans IR 05000261/19970011997-03-24024 March 1997 Pages 1 & 29 to Insp Rept 50-261/97-01 ML14181A8811997-02-28028 February 1997 Insp Repts 50-261/97-02,50-324/97-01 & 50-325/97-01 & 50-400-97-02 on 970113-0206.Violations Noted.Major Areas Inspected:Access Authorization & Fitness for Duty Programs ML14181A8541996-12-16016 December 1996 Notice of Violation from Insp on 960928-1116.Violation Noted:On 961016,operations Surveillance Test Procedure OST-160 Pressure Isolation Check Valve Back Leakage Test, Rev 23,inadequate,did Not Provide Adequate Instructions ML14181A8551996-12-16016 December 1996 Insp Rept 50-261/96-12 on 960928-1116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A8461996-10-25025 October 1996 Notice of Violation from Insp on 960818-0928.Violation Noted:Between 960917-19,shift Supervisors Assigned to Shifts Failed to Ensure That FMEA Controls Were Maintained in SFP Bldg While Fuel off-load Was Ongoing IR 05000261/19963011996-09-20020 September 1996 Exam Rept 50-261/96-301 on 960816-24.Exam results:14 SROs Passed & 1 Failed IR 05000261/19960081996-08-0101 August 1996 Insp Rept 50-261/96-08 on 960526-0706.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19960071996-06-28028 June 1996 Insp Rept 50-261/96-07 on 960603-14.No Violations Noted. Major Areas Inspected:Integrated Performance Assessment to Development Perspective of Plant Strengths & Weaknesses; Operations,Maint,Engineering,Plant Support,Safety,Security IR 05000261/19960051996-06-24024 June 1996 Insp Rept 50-261/96-05 on 960414-0525.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000261/19960041996-05-10010 May 1996 Insp Rept 50-261/96-04 on 960303-0413.No Violations Noted. Major Areas Inspected:Plant Operations,Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems & Close Out of Items & Fire Protection Program ML14181A8151996-04-25025 April 1996 Notice of Violation from Insp on 960311-0404.Violation Noted:From 951128 to 960309,licensee Allowed Access to Protected Area Using Hand Geometry Sys W/O Having Conducted Tests to Ensure Equipment Met 90% Detection Probability ML14181A8161996-04-23023 April 1996 Insp Rept 50-261/96-03 on 960311-0404.Violations Noted. Major Areas Inspected:Security Program for Power Reactors, Mgt Support,Security Program Plans & Procedures;Safeguards Info,Audits & Security Lighting IR 05000261/19960021996-03-27027 March 1996 Insp Rept 50-261/96-02 on 960121-0302.No Violations Noted. Major Areas Inspected:Plant Operations,Close Out of Open Issues,Maint & Surveillance,Physical Security Program, Internal & External Exposure Controls & Training ML14182A2821996-03-12012 March 1996 Notice of Violation from Exam on 960209-15.Violation Noted: Licensee Failed to Take Adequate Corrective Action to Correct Deficiency Previously Identified ML14181A8041996-02-16016 February 1996 Notice of Violation from Insp on 960101-20.Violation Noted: Operating Procedure OP-402 Was Not Properly Implemented in That AFW-110 & AFW-111 Were Not Maintained Fully Open IR 05000261/19950301996-01-26026 January 1996 Insp Rept 50-261/95-30 on 951126-1231.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Surveillance,Engineering & Plant Support ML14181A7991996-01-26026 January 1996 Notice of Violation from Insp on 960126-31.Violation Noted: PIC-012 Did Not Provide Adequate Instructions for Ensuring That Accumulator Level Properly Calibr IR 05000261/19950291995-12-20020 December 1995 Insp Rept 50-261/95-29 on 951022-1125.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Function 1999-09-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORG IA30303 JUL 221981 Report No. 50-261/81-19 Licensee:
Carolina Power and Light Company 411 Fayetteville Street Raleigh, NC 27602 Facility Name: H. B. Robinson Steam Electric Plant Docket No. 50-261 License No. DPR-23 Inspector:
-*
V S. Weise-ate Signed Approved by:
CM C. Julia Acting Sectibn Chief, Division of 6ate Signed Resident and Reactor Project Inspection SUMMARY Inspection on June 11 - July 10, 1981 Areas Inspected This routine announced inspection involved 148 resident inspector hours on site in the areas of technical specification compliance, plant tour, operations performance, plant trips, reportable occurrences, housekeeping, site security, surveillance activities, TMI Action Plan requirements, maintenance activities, quality assurance practices, radiation control activities, inservice inspection program, IE circular and Notice review, outstanding items review, preparation for refueling, and independent inspection effor Results Of the 17 areas inspected, no violations or deviations were identified in 16 areas; one violation was found in one area. (Failure to perform adequate 10 CFR 50.59 reviews and failure to notify the Commission of a change to the FSAR, paragraph 12).
8.109095
JUL 221981 DETAILS 1. Persons Contacted Licensee Employees
- R. B. Starkey, Plant General Manager
- C. W. Crawford, Manager, Operations and Maintenance F. L. Lowery, Unit 2 Operations Supervisor
- J. M. Curley, Manager, Technical Support F. Gilman, Senior Specialist Regulatory Compliance
- C. Wright, Specialist Regulatory Compliance W. Farmer, Engineer C. Bethea, Training Supervisor S. Allen, Training Specialist Other licensee employees contacted included technicians, operators, a mechanic, security force members, and office personne Other Organizations J. Rudisell, Captain, Burns Security Force
- Attended exit interview 2. Exit Interview The inspection scope and findings were summarized on July 9, 1981 with those persons indicated in Paragraph 1 above. The licensee acknowledged the findings and stated that the failure to report Modification 383 (discussed in paragraph 12) was a result of their modification control procedure Modifications, historically, have not been reported until the entire packages is closed, regardless of implementation date. Inasmuch as modification package 383 has not been fully closed, it was not reporte The licensee stated that the modification procedures will be revised to use implementation as the triggering event for reporting to the Commissio. Licensee Action on Previous Inspection Findings Not inspecte. Unresolved Items Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve noncomplinace or deviations. New unresolved items identified during this inspection are discussed in paragraph JUL 2'2 iee
5. Technical Specification Compliance a. During this reporting interval, the inspector verified compliance with selected limiting conditions for operation (LCO's) and reviewed results of selected surveillance tests. These verifications were accomplished by direct observation of monitoring instrumentation, valve positions, switch positions, and review of completed logs and record The licensee's compliance with selected LCO action statements were reviewed as they happened. The inspector noted no violations or deviations b. The licensee has commenced reorganizing the plant staff in conjunction with changes in the corporate structure. New positions have been created, some of which have been filled by existing or new personne Technical Specification 6.2, Organization, states the offsite and facility staff organization requirements. Licensee personnel have been assuming their new organization responsibilities for several months, however, the licensee has not submitted an amendment to Technical Specifications to delineate the new organization and its effect on Plant Operation.-Although no explicit violations have been noted, this item is unresolved pending submission of an amendment request and subsequent NRC review. (50-261/81-19-01).
6. Plant Operations Review The inspector periodically during the inspection interval reviewed shift logs and operations records, including data sheets, instrument traces, and records of equipment malfunctions. This review included control room logs, auxiliary logs, operating orders, standing orders, jumper logs and equipment tagout records. The inspector routinely observed operator alertness and demeanor during plant tour During abnormal events, operator performance and response actions were observed and evaluated. The inspector conducted random off-hours inspections during the reporting interval to assure that operations and security remained at an acceptable leve Shift turnovers were observed to verify that they were conducted in accordance with approved licensee procedures. The inspector had no further comment. Plant Tour The inspector conducted plant tours periodically during the inspection interval to verify that monitoring equipment was recorded as required, equipment was properly tagged, operations personnel were aware of plant conditions, and plant housekeeping efforts were adequate. The inspector determined that appropriate radiation controls were properly established, excess equipment or material was stored properly, and combustible material was disposed of expeditiously. During tours the inspector looked for the existence of unusual fluid leaks, piping vibrations, pipe hanger and seismic restraint abnormal settings, various valve and breaker positions, equipment clearance tags and component status, adequacy of firefighting equipment, and instrument calibration dates. Some tours were conducted on backshifts. The inspector noted no violations or deviation JUL 22
8. Plant Trips:
a. On June 19, 1981, a lighting strike on nearby power lines caused the load drop anticipatory function of the electro-hydraulic control system to function, shutting the turbine and reheat stop valves. The unit was at about 85% power initially. Due to the magnitude of the power transient and its effects on steam generator water levels, the operators manually tripped the reactor. All systems performed as expected with the exception of 'A'
auxiliary feedwater (AFW) pump which tripped on low discharge pressure. This and related problems with 'A'
AFW pump are discussed in Licensee Event Report 81-17. Since the steam driven AFW pump was out of service for maintenance, this event placed the plant in a limiting condition for operation (LCO).
The LCO was terminated after about two and one half hours when 'A'
AFW pump was returned to service. The plant returned to power operation early in the morning on June 20, 198 b. On June 20, 1981, the reactor experienced a trip and safeguards initiation from about 90% power when an instrumentation and control technician attempted to replace a train B safeguards test pushbutto The technician had been replacing one section of the four section switch, but had obtained an incorrect replacement section. Due to the difference in electrical contacts, an electrical transient was experienced on the instrument bus resulting in the actuation of safeguards relays. After determining that the safeguards initiation was not required for plant protection, the operators stabilized plant conditions and reset the safeguards signal and equipment. The error in the switch replacement section was identified and the proper section installed. Satisfactory testing was completed on applicable sections of the reactor protection-circuitry, and the reactor was returned to power operation that evenin The inspector will review the licensee's action to prevent recurrenc. Physical Protection The inspector verified by observation and interview during the reporting interval that measures taken to assure the physical protection of the facility met current requirements. Areas inspected included the organi zation of the security force, the establishment and maintenance of gates, doors and isolation zones in the proper condition, that access control and badging was proper, that search practices were appropriate, and that escorting and communications procedures were followed. The inspector attended security force.retraining on the plant security pla No viola tions or deviations were note.
Inservice Inspection Program (ISI)
The inspector reviewed the licensee's revised ISI program as transmitted to the Office of NRR by letter dated March 10, 198 This letter committed the licensee to completing the requirements for the second quarter by July 1, 198 The inspector reviewed the quarterly portion of the revised program
against the licensee's ISI Periodic Tests which implement the program. The following discrepancies were noted:
a. The following valves were not tested quarterly as required: sampling valve 959, safety injection valves 870 C and D, power operated relief valves (PORVS) 455C and 456, PORV block valves 535 and 536, service water valves 580 and 581, and check valve V8-b. The boric acid transfer pump ISI Periodic Test 7.1A was not completed prior to July 1, 198 Following discussions with licensee personnel the inspector determined that the valve discrepancies were due to errors in the submitted progra Several valves were actually flow switches (SW 580 and 581).
Several valves should not have been included in the program (SS-959, SI 870C and D, V8-5).
The PORV and block valves were intended to be tested at cold shutdown vice quarterly. Licensee personnel stated that a revision to the program would be transmitted to NRR. This is an inspector followup item. (50-261/81-19-02).
The ISI testing on the boric acid transfer pumps was completed satis factorily on July 6, 1981. The inspector noted that these pumps are run at least three hours per week while recirculating the boric acid storage tank The licensee stated that the delay was caused by gauge calibration procedure revisions. The inspector had no further question. Preparation for Refueling The inspector reviewed the licensee's procedures for the handling of new fuel assemblied during the unloading and receipt inspection operations. The inspector observed the receipt, inspection, and storage of a sampling of new fuel elements (for use in Cycle 9) by the licensee and verified that these operations were performed in accordance with licensee procedures. The inspector reviewed the Training Instruction, TI-109, Qualification of Fuel Inspection Personnel and verified by document review that fuel inspectors had completed this qualification. Completed fuel inspection records will be reviewed at a later date. No violations or deviations were identified in this are.
Independent Inspection Effort Based on the inspector's knowledge of the abnormal use of a waste condensate tank (WCT) for storage of primary coolant waste water, a further review of this occurrence was made to a determine that applicable requirements were met. During the primary coolant leak event of November 27, 1980 (documented in Licensee Event Report 80-28), failure of the Waste Evaporter necessitated the transfer of waste water from the Waste Holdup Tank (WHUT) to the A, B, and E WCT's. This was done to provide WHUT volume for the dewatering of the containment sump. A and B WCT's are located inside the auxiliary building, while C, D, and E WCT's are located outside the.auxiliary building and are vented directly to atmosphere. E WCT was filled to 90% level with untreated
JUL. 22 Wal waste water on November 27, 1980. The activity level of this water was never determine This transfer of water was allowed by Administrative Instruction Section 5.3, Deviations From Established Procedures, using the justification that:
a) the safety of equipment was jeopardized by allowing the water to remain uncontained in either the containment or the auxiliary building sumps and b)
with the WHUT at 96% capacity in conjunction with a 22 gpm primary to containment atmosphere.leak, there was the potential for an unplanned release. Once the transfer was made, E WCT was placed under clearance to prevent inadvertent release of its contents. The waste evaporator was repaired by November 28th, and the water removed from E WCT by December 3, 198 Due to E WCT's location and its design for storage of low activity waste evaporator distillate, a 10 CFR 50.59 review should have been performed on the consequences of storing untreated waste water in these tank Additionally, the unvalved tank vent constituted an unreviewed unmonitored release path to the environment. The Plant Nuclear Safety Committee (PNSC)
reviewed the deviation on November 28th and concurred with its implementa tion, however no 10 CFR 50.59 review documentation exists to justify that the storage of untreated waste water in E WCT was not an unreviewed safety questio The inspector next reviewed plant Modification 383, which documented the installation of the new, increased-capacity waste evaporator; C, D, and E WCT's; and associated piping and instrumentation. The modification was designed in 1977, and PNSC approved it for installation in July, 1977. The system became operational in early 1978. The inspector's review found the licensee had determined that the modification was a change to the FSAR, but not an unreviewed safety question. The discussion of the safety impli cations attached with Section B of the modification stated that: a)
precautions were taken during the design phase to eliminate possible trouble points that could result in inadvertent release of liquids with low level activity and b) all overflows from potential radioactive systems are routed to the auxiliary building sump. The inspector noted that this was an inadequate justification of the issue to determine that it was not an unreviewed safety question, in that:
a. the review does not address the potential for an inad ertent and/or unmonitored release from the vent lines from C, D, E WCT's nor the potential effects of such a release, b. the review does not quantify the term low level activity, and c. Section 14.2.2. of the FSAR states that all liquid waste components are located in the auxiliary building except the reactor coolant drain and the pressurizer relief tanks and any leakage from the tanks or piping will be collected in the building sump to be pumped back into the liquid waste system. Subsequent to Modification 383, this was no
longer true. The FSAR also assumes the WCT's are 1000 gallons each (A and B) vice 10,000 gallons each (C, D, E).
In as much as the original safety evaluation for the modification was inadequate, the lack of a documented safety evaluation for the transfer of untreated waste waster constitutes an inadequate safety review. The above two examples (waste water transfer and Modification 383) of the failure to perform an adequate 10 CFR 50.59 review consititute a violatio (50-261/81-19-03).
The inspector also noted that Special Procedures #250 and #295 had been reviewed and approved by the PNSC for transferring reactor letdown water and WHUT water, respectively, to C, D, or E WCT's. These procedures were also not considered as involving an unreviewed safety question, however, the inspector could not identify that the two procedures had ever been use The inspector's review of Modification 383 and the licensee's Annual Report to the Commission determined that the licensee had not reported the change to the FSAR involved in the modification including a summary of the safety evaluation. This failure to report is an additional example of the violation. This issue is further discussed in paragraph The inspector noted that the licensee had identified the unvalved vent lines from C, D, and E WCT's as potential sources of radioactive spills should an incorrect valve lineup be made during recirculation of a full tank. This resulted in the licensee administratively limiting the filling of these tanks in excess of 45 percent until modifications are made to prevent overflow from the system. This administrative limit was disseminated by memorandum to the operators in January, 1980, but has never been formally proceduralized. This item is open pending incorporation of this admini strative limit in the plant operating manual. (50-261/81-19-04). The inspector will also follow-up on the design, approval, and implementation of a modification to prevent WCT overflow from the tank vent. (50-261/81-19-05).
1 TMI Action Plan Requirements a. TAP No. I.C.5. Feedback of Operating Experience. This item required that the licensee review and revise, as necessary, their procedures to assure that operating experiences are fed back to operators and other personne These procedures are to address the seven areas specified in NUREG 0737. The inspector reviewed the licensee's Training Instruction-303 which is the procedure for Dissemination of Information/Feedback of Operating Experience and held discussions with appropriate plant personne The training instruction addresses items (1) through (5) of the staff position. The periodic audit required by item (7) is included in the Corporate Quality Assurance, Performance Evaluation Unit Audit schedule on a semi-annual basis. The criteria for the audit are being developed. Item (6) is not specifically covered by the procedure, although the personnel involved appear to understand their responsibilities in this are JUL 22 10 Based on discussions with plant and corporate personnel, the inspector understands that the licensee is reorganizing its offsite organization to assume the duties noted above. The offsite organization, as presently envisioned, will consist of a Principal Engineering support group which will review material for applicability and recommend its transmittal to the site via a Manager for Corporate Nuclear Safety and a Director of Onsite Nuclear Safety (ONS).
The Onsite Nuclear Safety Group (corporate personnel at the site), which reports to the Director of ONS, will interface with plant personnel in investigating events and developing appropriate feedback actions. This new onsite group will probably assume many of the functions performed by plant personne The inspector is satisfied-that the present feedback system adequately meets the requirement In order to ensure that the anticipated corporate replacement program meets the requirements, the inspector will re-inspect this area at a later date as an inspector followup item (50-261/81-19-06). This item is close b. TAP No. II.B.4, Item 2A, NUREG 0737. Training for Mitigating Core Damage. This item required the licensee to develop a training program to teach the use of installed systems and equipment to control or mitigate accidents in which the core is severly damaged. The inspector reviewed the lesson plans for this training program and attended portions of a recent class. the inspector noted three areas in the lesson plan that did not fully satisfy the requirements of Enclosure 3 to H. R. Denton's letter (NRR) of March 28, 1980. These discrepancies were immediately rectified and action was initiated to disseminate to and document that this information was received by all operators that had previously taken the training. The inspector had no further questions on the implementation and adequacy of the training progra This item is close c. TAP No. I.A.1.3, Item 1:
Shift Manning, Limit Overtime, NUREG 073 The licensee's Administrative Instructions, section 4, on use of overtime discourages overtime. This instruction applies to Shift Foreman, Senior Control Operators. Control Operators, and Shift Engineers. Additionally, the instruction only applies when the reactor coolant system temperature is above 200aF and when fuel is being moved within the reactor vesse Health physicists, auxiliary operators, technicians, and key maintenance personnel are not specifically addressed, although the overtime limitation may be applied to other key safety personnel at the discretion of the Plant Manager The licensee's procedures specify the following overtime restrictions:
a. An individual shall not be permitted to work more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> straight (not including shift turnover time).
b. An individual will have at least the same number of hours off between work periods as the length of his last work period (not including shift turnover time).
c. An individual shall not work more than 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> in any 7 day period (not including shift turnover time).
d. An individual shall not work more than 14 consecutive days without having two consecutive days of These restrictions are in substantial agreement with the requirement The licensee does, as permitted, allow deviations from the above, if it is authorized by the Plant Manager. Documentation of the unusual circumstances is made on the individual's time shee The licensee's procedures do not address nor does management support the requirement that time on the control board be limited to about four hours of continuous duty if the operator is to work more than eight continuous hour The licensee has documented his disagreement along with his evaluation as to the adequate safety of his present policy in CP&L letter NO-81-346, Limitation on Overtime Required of Licensed Operators, dated February 26, 1981 to the Director, Division of Licensing, Office of Nuclear Reactor Regulation. This item is close O 14. Licensee Event Report (LER) Followup The inspector reviewed the following LER's to verify that the report details met license requirements, identified the cause of the event, described appropriate corrective actions, adequately assessed the event, and addressed any generic implications. Corrective action and appropriate licensee review of the below events was verified. The inspector had no further comment LER Event 81-04 Sample cooler leak to component cooling water system 81-14 First stage turbine pressure module nonconservative shift 81-15
'A'
Steam flow channel computer module erratic operation 1 Review of IE Circulars and Notices (IEC's and IEN's)
a. The inspector verified that IE Circulars and Notices had been received onsite and reviewed by cognizant licensee personne Selected applicable IE Circulars and Notices were discussed with licensee personnel to ascertain the licensees actions on these items. The inspector also verified that IE Circulars and Notices were reviewed by the Plant Nuclear Safety Committee in accordance with facility administrative policy. Licensee action on the following IE Circulars and Notices were reviewed by the inspector and are close JUL22
IE Circulars IE Notices 80-12 80-32 80-21 80-34 81-03 80-37 81-06 80-38 80-42 80-44 b. IE Notice 80-01 Fuel Handling Event The inspector reviewed the licensee's review of this item, the fuel handling procedures, and the Periodic Fuel Handling Equipment Interlock and Operation Test (PT 26.0).
The present controls to prevent fuel handling events appear acceptable. The inspector had some concerns with Section G, Manipulator Crane, of PT 26.0. This procedure neither checks the proper position of the upward travel limit switch nor records the tape reading corresponding to that position. This position, however, is reportedly marked on the tape and the accom panying air hose, and limit switch operation is tested. The gripper tube down position is reportedly marked on the tape measure but not recorded for historical data. Recording of the above tape readings could provide advance indication of positioning equipment or tape measure functional problems. The inspector will review the equipment function and checkout prior to the next refuelin Inspector followup item 50-261/81-19-07).
The Notice is close. Outstanding Items Review a. (Closed) Open Item 81-08-02. This item concerned the fact that the Spray Additive Tank Low Level alarm was set at 33% + 1% while Technical Specification 3.3.2.1a. requires a minimum tank level of about 35%.
The licensee has changed the low level alarm setpoint to 36% + 1% and has revised plant procedure PSL-7. This item is close b. (Closed) Inspector Followup Item 81-12-01. This item concerned discrepancies noted in the reliability and operability of boric acid heat tracing records. The inspector has reviewed the condition of these records over the past weeks and determined that their readability and performance has improved. Maintenance and operations personnel appear to be more responsive to recorder and system discrepancie This item is close. Licensee Identified Violation On June 18, 1981, the licensee reported to the inspector that they were in violation of 10 CFR 19.11(a).(4) and 19.11.(e). This was due to their past failure to post within two working days copies of the following documents:
a. Proposed imposition of civil penalty
JUJL 22 199 O b. Orders issued pursuant to Subpart B of 10 CFR 2 c. Any licensee response Licensee corrective action was to immediately post the required document These documents are to remain posted as specified in 10 CFR 19.11.(e).
Further administrative actions will be taken to ensure that documents are posted as required. The inspector had no further question. Performance Appraisal Evaluation During this inspection period the plant site and corporate offices were inspected by an NRC Performance Appraisal Team. This team will complete their inspection of licensee management and operations on July 17, 198 Their findings will be documented in a future report to the licensee.