MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter IR 05000261/20204202020-10-14014 October 2020 Security Inspection Report 05000261/2020420 - IP 92707 IR 05000261/20200122020-09-30030 September 2020 Fire Protection Team Inspection Report 05000261/2020012 IR 05000261/20200022020-07-23023 July 2020 Integrated Inspection Report 05000261-2020002, and Independent Spent Fuel Storage Installation Inspection Isfi Report 0720060-2020001 IR 05000261/20200012020-04-15015 April 2020 Integrated Inspection Report 05000261/2020001 IR 05000261/20200102020-03-18018 March 2020 Biennial Problem Identification and Resolution Inspection Report 05000261/2020010 IR 05000261/20190062020-03-0303 March 2020 Annual Assessment Letter for H. B. Robinson Steam Electric Plant Unit 2 NRC Report 05000261/2019006 IR 05000261/20190042020-02-13013 February 2020 Integrated Inspection Report 05000261/2019004, and Independent Spent Fuel Storage Installation Inspection (ISFSI) Report 0720060/2019002 IR 05000261/20204022020-01-23023 January 2020 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000261/2020402 IR 05000261/20193012019-11-19019 November 2019 NRC Operator License Examination Report 05000261/2019301 IR 05000261/20190032019-11-14014 November 2019 Integrated Inspection Report 05000261/2019003 IR 05000261/20190122019-09-19019 September 2019 NRC Inspection Report 05000261/2019012, and Investigation Report 2-2018-004; and Apparent Violations 2024-01-31
[Table view] Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] |
See also: IR 05000261/2021404
Text
December 8, 2021
Mr. Jeffrey Remick
Director, Nuclear Plant Security
Duke Energy Progress, LLC
3581 Robinson Steam Electric Plant
3581 West Entrance Road (RNPA12)
Hartsville, SC 29550
SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT - SECURITY BASELINE
INSPECTION REPORT 05000261/2021404
Dear Mr. Remick:
On October 29, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at H.B. Robinson Steam Electric Plant. On October 27, 2021, the NRC inspectors discussed
the results of this inspection with you and other members of your staff. The results of this
inspection are documented in the enclosed report.
One finding of very low security significance (Green) is documented in this report. This finding
involved a violation of NRC requirements. We are treating this violation as a non-cited violation
(NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or the significance or severity of the violation documented in this
inspection report, you should provide a response within 30 days of the date of this inspection
report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional
Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear
Security and Incident Response; and the NRC Resident Inspector at H.B. Robinson Steam
Electric Plant.
J. Remick 2
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Scott M. Shaeffer, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 05000261
License No. DPR-23
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV
ML21342A212
X Non-Sensitive X Publicly Available
X SUNSI Review
Sensitive Non-Publicly Available
OFFICE RII/DRS RII/DRS
NAME D. Strickland S. Shaeffer
DATE 12/06/2021 12/08/2021
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Number: 05000261
License Number: DPR-23
Report Number: 05000261/2021404
Enterprise Identifier: I-2021-404-0006
Licensee: Duke Energy Progress, LLC
Facility: H.B. Robinson Steam Electric Plant
Location: Hartsville, SC
Inspection Dates: October 25, 2021 to October 29, 2021
Inspectors: D. Strickland, Reactor Inspector
Approved By: Scott M. Shaeffer, Chief
Engineering Branch 2
Division of Reactor Safety
Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting a security baseline inspection at H.B. Robinson Steam Electric
Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the
NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer
to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
Failure to Identify all Target Set Supporting Element Locations
Cornerstone Significance Cross-Cutting Report
Aspect Section
Security Green None 71130.14
NCV 05000261/2021404-01
Open
An NRC identified Green NCV of 10 CFR 73.55(f)(1) was identified with for the licensees
failure to identify all target set element locations of a target set as required by site procedures.
Additional Tracking Items
None.
2
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for
Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and
records, observed activities, and interviewed personnel to assess licensee performance and
compliance with Commission rules and regulations, license conditions, site procedures, and
standards.
SAFEGUARDS
71130.14 - Review of Power Reactor Target Sets
The inspectors evaluated the Security Target Set Program. The following elements were
evaluated:
Review of Power Reactor Target Sets (1 Sample)
(1) [List requirements: 02.02 (a-d, f), 02.03, 02.04 (a-b), 02.05]
Power Reactor Target Sets (1 Sample)
Section 02.01 Review of Events and Logs
The inspector reviewed any licensee event reports, safeguards log entries, and
corrective action program entries since the last Target Set inspection that concern the
target set identification, development, and maintenance program.
Section 02.02 Target Set Identification and Development Process Review
The inspector assessed the licensee's documentation and maintenance of the
process used to develop and identify complete and accurate target sets as required
by 10 CFR Part 73 by reviewing applicable portions of procedures and samples of
records and conducting interviews with responsible personnel and plant employees.
Section 02.03 Verification of Target Sets Changes
The inspector reviewed changes to the licensees documented target sets since the
last Target Set inspection. The inspector verified that any design modifications and
procedure or configuration changes that have occurred were appropriately
documented in the site's target sets.
Section 02.04 Verification of Complete and Accurate Target Sets
The inspector interviewed licensee personnel and reviewed a sample of target sets
for reactor operation and for modes other than operation. The inspector reviewed
assumptions used in the licensees development of its target sets.
3
Section 02.05 Physical Protection Program Review
The inspector verified that the licensee performed a review of target sets for
accuracy, completeness, and applicability at least every 24 months and as otherwise
required, documented the results and recommendations, and entered findings in the
sites corrective action program (CAP).
INSPECTION RESULTS
Failure to Identify all Target Set Supporting Element Locations
Cornerstone Significance Cross-Cutting Report
Aspect Section
Security Green None 71130.14
NCV 05000261/2021404-01
Open
An NRC identified Green NCV of 10 CFR 73.55(f)(1) was identified with for the licensees
failure to identify all target set element locations of a target set as required by site
procedures.
Description: Licensee procedure AD-SY-ALL-0130, Development and Maintenance of
Target Sets Revision 1, establishes the requirements, responsibilities, and administrative
process for identification, analysis, revision and maintenance of Robinson's target set
program to meet the requirements found in 10 CFR 73.55. According to the Target Set
Information Worksheet Template provided in AD-SY-ALL-0130, the licensee is required to
document the locations of target set element locations that would be both identifiable and
accessible by an adversary.
On October 26, 2021, while the NRC inspectors were performing walkdowns of target set
elements, the team observed that the licensee did not identify all locations of a supporting
target set element from which an adversary could compromise it. The new locations would
be identifiable and accessible by an adversary and was therefore required to be documented
in the Target Set Notebook.
Following discussions with the licensee, the inspectors noted the deficiencies in the target
sets would not result in any changes to the licensees protective strategy.
Corrective Actions: The licensee entered the deficiency into their correction action program
as CR-02403256
Performance Assessment:
Performance Deficiency: Failure to document and maintain the process used to develop and
identify target sets, to include the site-specific analysis and methodologies used to determine
and group the target set equipment or elements
Screening: The inspectors determined the performance deficiency was more than minor
because if left uncorrected, it would have the potential to lead to a more significant safety
concern. Specifically, the failure to identify all TS component locations may lead the security
force to not place protection priority on specific plant areas. And an adversary attack at these
locations could lead to core damage.
4
Significance: The inspectors assessed the significance of the finding using Appendix E, Part
I, Baseline Security SDP for Power Reactors. The inspectors determined that the finding
met the criteria in section 8.0, Evaluating Target Set Findings (Figure 6) since all target set
findings are screened IAW this section and with the Figure 6 SDP flow chart. The licensee did
not adequately document and maintain the process used to develop Target Sets as described
in section 8.04 of the SDP. Specifically, the finding was screened to green because the
licensees process did not identify target set supporting elements and/or locations as
described in section 8.04(a).
Cross-Cutting Aspect: None
Enforcement:
Violation: 10 CFR 73.55(f)(1) states that the licensee shall document and maintain the
process used to develop and identify target sets, to include the site-specific analysis and
methodologies used to determine and group the target set equipment or elements
Contrary to the above, the licensee failed to adequately implement the requirements of 10
CFR 73.55(f)(1). Specifically, the licensee failed to maintain the process used to develop
target sets by not including all target set element locations that could be compromised by an
adversary.
Enforcement Action: This violation is being treated as a non-cited violation, consistent with
Section 2.3.2 of the Enforcement Policy.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 27, 2021, the inspectors presented the security baseline inspection results
to Jeffrey Remick and other members of the licensee staff.
5
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.14 Corrective Action 02217937 07/11/2018
Documents 02403141 10/26/2021
Engineering CSD-SY-RNP- 10/25/2021
Evaluations 0130-02
Procedures AD-SY-ALL-0120 1
AD-SY-ALL-0130 3
AOP-034 31
6