Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report)
ML23333A026
Person / Time
Site: Robinson 
Issue date: 11/30/2023
From: Joshua Berry
Security Performance Evaluation Branch
To: Basta L
Duke Energy Progress
References
IR 2023420
Download: ML23333A026 (7)


Text

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - SECURITY BASELINE INSPECTION REPORT 05000261/2023420

Dear Laura Basta:

On November 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H. B. Robinson Steam Electric Plant, Unit 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Joshua K. Berry, Acting Chief Security Performance Evaluation Branch Division of Security Operations Docket No. 05000261 License No. DPR-23

Enclosure:

As stated

Inspection Report

Docket Number:

05000261

License Number:

DPR-23

Report Number:

05000261/2023420

Enterprise Identifier:

I-2023-420-0018

Licensee:

Duke Energy Progress, LLC

Facility:

H. B. Robinson Steam Electric Plant, Unit 2

Location:

Hartsville, South Carolina

Inspection Dates:

October 23, 2023 to November 17, 2023

Inspectors:

C. Roundtree, Team Leader

T. Barry, Senior Physical Security Inspector

C. Bustamante, Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

Joshua K. Berry, Acting Chief

Security Performance Evaluation Branch

Division of Security Operations

Summary

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting a security baseline inspection at H. B. Robinson Steam Electric

Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight

Process is the NRCs program for overseeing the safe operation of commercial nuclear power

reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

Inspection Scopes

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for

Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and

records, observed activities, and interviewed personnel to assess licensee performance and

compliance with Commission rules and regulations, license conditions, site procedures, and

standards.

Safeguards

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1)

NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in

implementing the physical protection program to detect, assess, interdict, and

neutralize threats up to, and including, the design basis threat of radiological

sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

Report Attachments

Supplemental Information for the report is considered Safeguards Information and is

located separately within the NRCs Safeguards Information Local Area Network and

Electronic Safe database (SLES), under NS126081.

Inspection Results

No findings were identified.

Exit Meetings and Debriefs

The inspectors verified no proprietary information was retained or documented in this report.

On November 16, 2023, the inspectors presented the security baseline inspection

results to Laura Basta and other members of the licensee staff.

Documents Reviewed

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NCR 02491950

11/16/2023

NCR 02492054

10/26/2023

NCR 02494835

11/16/2023

NCR 02494957

11/16/2023

Corrective Action

Documents

Resulting from

Inspection

NCR 02494988

11/16/2023

Duke Energy Progress - Brunswick, Robinson and Harris

Nuclear Plants Physical Security Plan, Security Training

Plan and Qualification Plan, Safeguards Contingency Plan

and Independent Spent Fuel Storage Installation Security

Program Summary Description of Changes

01/17/2023

Duke Energy Progress - Brunswick, Robinson and Harris

Nuclear Plants Physical Security Plan, Security Training

Plan and Qualification Plan, Safeguards Contingency Plan

and Independent Spent Fuel Storage Installation Security

Program

Revision 16,

04/10/2023

A-1 Maps

Physical Footprint

HBR2-09800

Plot Plan

Revision 52,

12/17/2019

A-2

PPT Map Presentation Cameras, BREs

01/29/2019

AD-SY-ALL-0560

Security Drill and Exercise Program

Revision 9

AD-SY-RNP-

0251

Contingency Response

AD-SY-RNP-

0254

Robinson Unit 2 Administrative Procedure

RNP-Protective Strategy

Revision 2,

02/01/2023

AOP-34

Security Event

CSD-SY-RNP-

0130-02

Robinson Unit 2 Controlled Supporting Document

RNP Formal Target Sets

Revision 3,

06/16/2022

HBR2-09800

Plot Plan

Revision 052,

12/17/2019

71130.03

Procedures

NED-C/STRU-

1008 A-8 Blast

Calc

Carolina Power & Light Company Calculation Sheet "NRC"

Interim Safeguards Compensatory Measures Order

02/25/02

Revision 1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Calculation Title: Vehicle Barrier System

ML23333A026

OFFICE

NSIR/DSO/SPEB

R-II/DRS/PSB

NSIR/DSO/SPEB

/ETA

NSIR/DSO/SPEB

/ETB

NAME

CBustamante

JTornow

CRoundtree

JBerry

DATE

Nov 29, 2023

Nov 30, 2023

Nov 30, 2023

Nov 30, 2023