IR 05000261/2023420
| ML23333A026 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 11/30/2023 |
| From: | Joshua Berry Security Performance Evaluation Branch |
| To: | Basta L Duke Energy Progress |
| References | |
| IR 2023420 | |
| Download: ML23333A026 (7) | |
Text
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - SECURITY BASELINE INSPECTION REPORT 05000261/2023420
Dear Laura Basta:
On November 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H. B. Robinson Steam Electric Plant, Unit 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Joshua K. Berry, Acting Chief Security Performance Evaluation Branch Division of Security Operations Docket No. 05000261 License No. DPR-23
Enclosure:
As stated
Inspection Report
Docket Number:
05000261
License Number:
Report Number:
Enterprise Identifier:
I-2023-420-0018
Licensee:
Duke Energy Progress, LLC
Facility:
H. B. Robinson Steam Electric Plant, Unit 2
Location:
Hartsville, South Carolina
Inspection Dates:
October 23, 2023 to November 17, 2023
Inspectors:
C. Roundtree, Team Leader
T. Barry, Senior Physical Security Inspector
C. Bustamante, Physical Security Inspector
J. Tornow, Physical Security Inspector
Approved By:
Joshua K. Berry, Acting Chief
Security Performance Evaluation Branch
Division of Security Operations
Summary
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting a security baseline inspection at H. B. Robinson Steam Electric
Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight
Process is the NRCs program for overseeing the safe operation of commercial nuclear power
reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
Inspection Scopes
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for
Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and
records, observed activities, and interviewed personnel to assess licensee performance and
compliance with Commission rules and regulations, license conditions, site procedures, and
standards.
Safeguards
71130.03 - Contingency Response - Force-On-Force Testing
Contingency Response - Force-On-Force Testing (1 Sample)
(1)
NRC inspectors completed the Contingency Response - Force-on-Force (FOF)
Testing inspection procedure by evaluating the licensees performance in
implementing the physical protection program to detect, assess, interdict, and
neutralize threats up to, and including, the design basis threat of radiological
sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.
Report Attachments
Supplemental Information for the report is considered Safeguards Information and is
located separately within the NRCs Safeguards Information Local Area Network and
Electronic Safe database (SLES), under NS126081.
Inspection Results
No findings were identified.
Exit Meetings and Debriefs
The inspectors verified no proprietary information was retained or documented in this report.
On November 16, 2023, the inspectors presented the security baseline inspection
results to Laura Basta and other members of the licensee staff.
Documents Reviewed
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
11/16/2023
10/26/2023
11/16/2023
11/16/2023
Corrective Action
Documents
Resulting from
Inspection
11/16/2023
Duke Energy Progress - Brunswick, Robinson and Harris
Nuclear Plants Physical Security Plan, Security Training
Plan and Qualification Plan, Safeguards Contingency Plan
and Independent Spent Fuel Storage Installation Security
Program Summary Description of Changes
01/17/2023
Duke Energy Progress - Brunswick, Robinson and Harris
Nuclear Plants Physical Security Plan, Security Training
Plan and Qualification Plan, Safeguards Contingency Plan
and Independent Spent Fuel Storage Installation Security
Program
Revision 16,
04/10/2023
A-1 Maps
Physical Footprint
HBR2-09800
Plot Plan
Revision 52,
12/17/2019
A-2
PPT Map Presentation Cameras, BREs
01/29/2019
AD-SY-ALL-0560
Security Drill and Exercise Program
Revision 9
AD-SY-RNP-
0251
Contingency Response
AD-SY-RNP-
0254
Robinson Unit 2 Administrative Procedure
RNP-Protective Strategy
Revision 2,
02/01/2023
Security Event
CSD-SY-RNP-
0130-02
Robinson Unit 2 Controlled Supporting Document
RNP Formal Target Sets
Revision 3,
06/16/2022
HBR2-09800
Plot Plan
Revision 052,
12/17/2019
Procedures
NED-C/STRU-
1008 A-8 Blast
Calc
Carolina Power & Light Company Calculation Sheet "NRC"
Interim Safeguards Compensatory Measures Order
02/25/02
Revision 1
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Calculation Title: Vehicle Barrier System
OFFICE
NSIR/DSO/SPEB
R-II/DRS/PSB
NSIR/DSO/SPEB
/ETA
NSIR/DSO/SPEB
/ETB
NAME
CBustamante
JTornow
CRoundtree
JBerry
DATE
Nov 29, 2023
Nov 30, 2023
Nov 30, 2023
Nov 30, 2023