Text

NOTICE OF VIOLATION Carolina Power and Light Company Docket No. 50-261 H. B. Robinson Unit 2 License No. DPR-23 EA 98-067 During an NRC inspection conducted from January 4 through February 14, 1998, a violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedures for NRC Enforcement Actions." NUREG-1600, the violation is listed below:

10 CFR 50.71(e) requires the Updated Final Safety Analysis Report (UFSAR) to be revised to include the effects of all changes made in the facility or procedures as described in the UFSAR.

Contrary to the above, as of April 7, 1997, the licensee failed to revise the UFSAR to include the follbwing effects of changes made in the facility or procedures as described in the UFSAR.

1)

UFSAR Table 6.3.2-5 stated that the maximum safety injection (SI) pump flowrate is 550 gallons per minute (gpm), which was less than the actual pump flowrate. This value is inconsistent with the SI pump flowrate of 600 gpm stated in UFSAR Section 6.3.2.2.3. The SI pump design parameters listed in UFSAR Table 6.3.2-5.are inconsistent than those shown in UFSAR Figure 6.3.2-4.

2)

UFSAR Section 10.4.8.2 did not list Anticipated Transient Without Scram (ATWS) Mitigation System Actuation Circuitry as a start signal for auxiliary feedwater (AFW).

3)

UFSAR Table 10.4.8-1 incorrectly stated that the steam driver AFW pump was 387 horsepower. The correct horsepower was 733.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201. Carolina Power and Light Company is hereby required to submit a written statement or explanation to the U.S.

Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, D.C.

20555 with a copy to the Regional Administrator. Region II, and a copy to the NRC Resident Inspector within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response. If an adequate reply is not received within the time specified in this Notice, an order or a 9803230022 980312 PDR ADOCK 05000261 PDR

CP&L 2

Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. However, if you find it necessary to include such information, you should clearly indicate the specific information that you desire not to be placed.in the PDR, and provide the legal basis to support your request for withholding the information from the public.

Dated at Atlanta, Georgia this 12th day of March 1998