IR 05000261/2022402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000261/2022402
ML22290A119
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/19/2022
From: Jannette Worosilo
NRC/RGN-II/DRS/PSB2
To: Remick J
Duke Energy Progress
References
IR 2022402
Download: ML22290A119 (8)


Text

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT - SECURITY BASELINE INSPECTION REPORT 05000261/2022402

Dear Mr. Remick:

On October 6, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H. B. Robinson Steam Electric Plant and discussed the results of this inspection with Mrs. N.

Flippin and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket No. 05000261 License No. DPR-23

Enclosure:

As stated

Inspection Report

Docket Number:

05000261

License Number:

DPR-23

Report Number:

05000261/2022402

Enterprise Identifier:

I-2022-402-0040

Licensee:

Duke Energy Progress, LLC

Facility:

H. B. Robinson Steam Electric Plant

Location:

Hartsville, South Carolina

Inspection Dates:

September 12, 2022 to October 06, 2022

Inspectors:

R. Patterson, Physical Security Inspector

J. Tornow, Physical Security Inspector

J. Wallo, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at H. B. Robinson Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements Tier II: (02.06 a - d, 02.07 a, 02.08 a, b, e)

Tier III: (02.09)

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP dated January 1, 2019.

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: All Requirements Tier II: (02.09 a, b, 02.11 b, d) Tier III: (02.14, 02.15 a, b)

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1) Tier I: All Requirements Tier II: (02.05 b, c, 02.06 a, b, 02.07 a, 02.09 b)

Tier III: (02.10, 02.11 a, 02.12 a, 02.13 a, b)

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) September 1, 2021 through September 1,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 6, 2022, the inspectors presented the security baseline inspection results to Mrs. N. Flippin and other members of the licensee staff.

On September 15, 2022, the inspectors debriefed the inspection results to L. Basta and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

2412832

Adverse Site Trend in PAA Notifications

1/20/2022

AD-SY-ALL-0210

SITE ACCESS CONTROLS

rev. 6

AD-SY-ALL-0215

SECURITY SEARCH AND ENTRY PROCESSING

Rev. 8

AD-SY-ALL-0240

SECURITY KEY AND LOCK CONTROLS

Rev. 2

AD-SY-ALL-0301

NUCLEAR WORKER UNESCORTED ACCESS

AUTHORIZATION PROGRAM

Rev. 8

AD-SY-ALL-0310

ACCESS AUTHORIZATION PROCESSING

Rev. 8

71130.02

Procedures

AD-SY-ALL-0370

ACCESS PROCESSING OF FOREIGN NATIONALS

Rev. 3

2351227

2359936

2360445

2360969

2362589

2368511

2401801

Corrective Action

Documents

2405105

2441862

2441873

Corrective Action

Documents

Resulting from

Inspection

2441885

2052541001

Work Order Package

06/28/2022

Operability

Evaluations

PM-426-2

Security UPS Batteries Quarterly PM

Revision 3

AD-EG-ALL-1374

Electromagnetic Interference on Plant Equipment

Revision 2

AD-SY-ALL-0580

Weapons Maintenance, Testing, and Accountability

Revision 7

AD-SY-ALL-0600

Testing and Inspection of Security Equipment and Barriers

Revision 0

AD-SY-ALL-0610

Nuclear Security Equipment Maintenance Program

Revision 1

AD-SY-RNP-0600

Testing and Inspection of RNP Security Equipment and

Barriers

Revision 2

OP-926

TSC/EOF/Security Diesel Generator Operations

Revision 29

71130.04

Procedures

PLP-076

Portable Transceiver Usage

Revision 18

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Self-Assessments

20-RNP-SEC-

Nuclear Oversight-Audit Robinson Physical Security

2/17/2020

NRA Day Rifle Course Approval Letter

10/22/2021

NRA Night Rifle Course Approval Letter

10/22/2021

Various Armorer Qualification Documents

Various Training Instructor Qualification Documents

Various Security Officer Training Qualification Documents

Miscellaneous

Various Security Written Test Documents

LP-SY-ALL-0516

Use of Force

Revision 5

PY-SY-ALL-0005

Fleet Nuclear Security Use of Force Policy

Revision 2

SFI-0002N

Tamper Training

Revision 4

TG-SY-ALL-0500

Conduct of Fleet Courses of Fire

Revision 10

TG-SY-RNP-0506

RNP Tactical Course Guire

Revision 4

71130.07

Procedures

TG-SY-RNP-0530

OJT/TPE Guide

Revision 2

71151

Procedures

AD-PI-ALL-0700

PERFORMANCE INDICATORS

Rev. 5