April 15, 2020
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT - INTEGRATED INSPECTION REPORT 05000261/2020001
Dear Mr. Kapopoulos:
On March 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H. B. Robinson Steam Electric Plant. On April 13, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects
Docket No. 05000261 License No. DPR-23
Enclosure:
As stated
Inspection Report
Docket Number:
05000261
License Number:
Report Number:
Enterprise Identifier: I-2020-001-0037
Licensee:
Duke Energy Progress, LLC
Facility:
H. B. Robinson Steam Electric Plant
Location:
Hartsville, South Carolina
Inspection Dates:
January 01, 2020 to March 31, 2020
Inspectors:
A. Beasten, PhD, Resident Inspector
M. Fannon, Senior Resident Inspector
Approved By:
Randall A. Musser, Chief
Reactor Projects Branch 3
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting an integrated inspection at H. B. Robinson Steam Electric Plant, in
accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs
program for overseeing the safe operation of commercial nuclear power reactors. Refer to
https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type
Issue Number
Title
Report Section
Status
LER 2019-001-00 for H.B.
Robinson Steam Electric
Plant, Unit 2, Turbine
Trip/Reactor Trip due to
Main Generator Lockout
Closed
PLANT STATUS
Unit 2 began the inspection period at rated thermal power (RTP) and remained at or near RTP
for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase. The inspectors performed plant status activities described in
IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem
Identification and Resolution. The inspectors reviewed selected procedures and records,
observed activities, and interviewed personnel to assess licensee performance and compliance
with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President
of the United States on the public health risks of the coronavirus (COVID-19), resident
inspectors were directed to begin telework and to remotely access licensee information using
available technology. During this time the resident inspectors performed periodic site visits
each week and during that time conducted plant status activities as described in IMC 2515,
Appendix DProperty "Inspection Manual Chapter" (as page type) with input value "NRC Inspection Manual 2515,</br></br>Appendix D" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.; and observed risk significant activities when warranted. In addition, resident and
regional baseline inspections were evaluated to determine if all or portion of the objectives and
requirements stated in the IP could be performed remotely. If the inspections could be
performed remotely, they were conducted per the applicable IP. In the cases where it was
determined the objectives and requirements could not be performed remotely, management
elected to postpone and reschedule the inspection to a later date.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following
systems/trains:
(1)
A and C charging pumps while B charging pump was out of service for planned
maintenance on January 8, 2020
(2)
A motor driven auxiliary feedwater pump (MDAFW) and steam driven auxiliary
feedwater (SDAFW) pump while B MDAFW pump was out of service for planned
maintenance on January 14, 2020
(3)
'A' emergency diesel generator (EDG) while B EDG was out of service for emergent
jacket water line repair, on January 15, 2020
(4)
B component cooling water (CCW) while protected for spent fuel pool cooling on
March 17, 2020
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
(1)
The inspectors evaluated system configurations during a complete walkdown of the
auxiliary feedwater (AFW) system on March 9, 2020.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a
walkdown and performing a review to verify program compliance, equipment functionality,
material condition, and operational readiness of the following fire areas:
(1)
Fire Zone 29, Service water intake structure on February 13, 2020
(2)
Fire Zone 14, Diverse and flexible coping strategies (FLEX) EDG area, on March 10,
2020
(3)
Fire Zone 15, Auxiliary building second level, on March 10, 2020
(4)
Fire Zone 6, AFW pump room on March 16, 2020
(5)
Fire Zone 3, Safety injection pump room, on March 30, 2020
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
(1)
Safety injection and containment spray pump room on March 23, 2020
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1
Sample)
(1)
The inspectors observed and evaluated licensed operator performance in the main
control room during a plant down power to 97 percent RTP, restoration to full RTP,
MDAFW surveillance testing, and control rod exercise on January 14, 2020.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (3 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following
structures, systems, and components (SSCs) remain capable of performing their intended
function:
(1)
B EDG jacket water leak on January 15, 2020
(2)
A MDAFW unavailability not properly recorded on February 21, 2020
(3)
B MDAFW stopped on low discharge pressure on March 12, 2020
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the
following planned and emergent work activities to ensure configuration changes and
appropriate work controls were addressed;
(1)
'B' MDAFW maintenance on January 14, 2020
(2)
'B' EDG jacket water leak repair on January 15, 2020
(3)
A EDG cross drive inspection on January 27 and 28, 2020
(4)
SDAFW maintenance on March 10, 2020
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the
following operability determinations and functionality assessments:
(1)
Nuclear Condition Report (NCR) 2303605, Dedicated shutdown diesel generator
battery capacity test
(2)
NCR 2309295, Battery Cell 5 sample tube plug broken
(3)
(4)
NCR 2321523, B EDG fuel oil transfer pump failed to stop
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2
Samples)
The inspectors evaluated the following temporary or permanent modifications:
(1)
Engineering change 291818 - Evaluate lack of full thread engagement on A service
water pump mounting bolt on February 21, 2020
(2)
Engineering change 413616 - Relocate portable AFW pumps for FLEX strategy on
February 24, 2020
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)
The inspectors evaluated the following post maintenance test activities to verify system
operability and functionality:
(1)
Work Order (WO) 20234359, C charging pump suction stabilizer relief valve
replacement on January 9, 2020
(2)
Work Request 20163068, 'A' EDG carbon dioxide pneumatic release valve
adjustment on January 9, 2020
(3)
WO 20342316, Cable spreading room and relay room fan belt re-tensioning on
January 14, 2020
(4)
WO 13534386, 'B' MDAFW planned maintenance on January 14, 2020
(5)
WO 20072634, Replace N-35 high level trip and P6 bistables on January 14, 2020
(6)
WO 20342796, 'B' EDG cylinder number 6 jacket water line repairs on January 15,
2020
(7)
WO 20380603, A EDG cross drive inspection and emergent repair of the 'A' EDG
output breaker on January 28, 2020
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01) (4 Samples)
(1)
OST-011, Quarterly control rod exercise on January 14, 2020.
(2)
MST-030, 4 kilovolt (kV) undervoltage to reactor protection system testing on March
17, 2020
(3)
MST-003-1, Average coolant temperature reactor protection system channel testing
on March 18, 2020
(4)
OST-401-2, 'B EDG slow speed start on March 20, 2020
Inservice Testing (IP Section 03.01) (1 Sample)
(1)
OST-202, SDAFW system component test on March 10, 2020.
FLEX Testing (IP Section 03.02) (1 Sample)
(1)
OST-453, Fukushima FLEX diesel generator '1A' and '1B' surveillance test on March
10, 2020.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)
(1)
Residual heat removal systems (MS09) from January 1, 2019 to December 31, 2019
MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)
(1)
Cooling water (MS10) from January 1, 2019 to December 31, 2019
BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)
(1)
Reactor coolant system leak rate (B102) from January 1, 2019 to December 31, 2019
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program
related to the following issues:
(1)
NCR 2280888, AFW discharge valve loss of control power indication
71153 - Followup of Events and Notices of Enforcement Discretion
Event Report (IP Section 03.02) (1 Sample)
The inspectors evaluated the following licensee event reports (LERs):
(1)
LER 05000261/2019-001-00, Turbine Trip/Reactor Trip due to Main Generator
Lockout (ML19282D756): The inspectors determined that it was not reasonable to
foresee or correct the cause discussed in the LER. Therefore, no performance
deficiency was identified. The inspectors also concluded that no violation of NRC
requirements occurred. The circumstances surrounding this LER are documented in
Inspection Report 05000261/2019003 Section 71153 (ADAMS Accession No.
ML19318F778). This LER is closed.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 13, 2020, the inspectors presented the integrated inspection results to Ernest J.
Kapopoulos Jr. and other members of the licensee staff.