Category:Inspection Report
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter IR 05000261/20204202020-10-14014 October 2020 Security Inspection Report 05000261/2020420 - IP 92707 IR 05000261/20200122020-09-30030 September 2020 Fire Protection Team Inspection Report 05000261/2020012 IR 05000261/20200022020-07-23023 July 2020 Integrated Inspection Report 05000261-2020002, and Independent Spent Fuel Storage Installation Inspection Isfi Report 0720060-2020001 IR 05000261/20200012020-04-15015 April 2020 Integrated Inspection Report 05000261/2020001 IR 05000261/20200102020-03-18018 March 2020 Biennial Problem Identification and Resolution Inspection Report 05000261/2020010 IR 05000261/20190062020-03-0303 March 2020 Annual Assessment Letter for H. B. Robinson Steam Electric Plant Unit 2 NRC Report 05000261/2019006 IR 05000261/20190042020-02-13013 February 2020 Integrated Inspection Report 05000261/2019004, and Independent Spent Fuel Storage Installation Inspection (ISFSI) Report 0720060/2019002 IR 05000261/20204022020-01-23023 January 2020 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000261/2020402 IR 05000261/20193012019-11-19019 November 2019 NRC Operator License Examination Report 05000261/2019301 IR 05000261/20190032019-11-14014 November 2019 Integrated Inspection Report 05000261/2019003 IR 05000261/20190122019-09-19019 September 2019 NRC Inspection Report 05000261/2019012, and Investigation Report 2-2018-004; and Apparent Violations 2024-01-31
[Table view] Category:Memoranda
MONTHYEARML22299A0212023-01-10010 January 2023 Memo to File - Robinson Final EA 2017, 2019, 2021 ML21145A0182021-05-25025 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regard the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20266G4412020-09-24024 September 2020 Insights Obtained from Review of Robinson Seismic Probabilistic Risk Assessment ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15253A4032016-03-11011 March 2016 Recommendation for Dispositioning Proposed Generic Issue on the Effects of Downstream Dam Failures on Nuclear Power Plants ML15342A2052016-01-0808 January 2016 Regulatory Audit in Support of License Amendment Request to Adopt NFPA 805 ML15288A1312015-11-17017 November 2015 Summary of Meeting with Duke Energy Progress, Inc. to Discuss H. B. Robinson Steam Electric Plant Unit No. 2 - Proposed License Amendment Request Transmission Upgrades ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML14112A4712014-05-0202 May 2014 Conference Call Summary - Regarding the Spring 2014 Steam Generator Inspections During a Forced Outage ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12314A0292012-11-13013 November 2012 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML1210707142012-05-21021 May 2012 Memo from G. Taylor and N. Melly to M. Salley H.B. Robinson High Energy Arc Fault Event Cable Damage Evaluation ML11180A0162011-07-0101 July 2011 Notice of Forthcoming Meeting with Carolina Power & Light Company Regarding H. B. Robinson Steam Electric Plant, Unit No. 2, to Introduce the New Management Team and Discuss Strategic Plan ML1108406312011-03-29029 March 2011 Notice of Forthcoming Pre-Application Meeting with Carolina Power & Light Co. and Florida Power Corp., Brunswick Units 1 & 2, Crystal River Unit 3, and H.B. Robinson Unit 2, to Discuss Transition to the Requirements of National Fire.. ML1015901992010-06-0808 June 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of Progress Energy Carolina'S Ownership Interest of H.B. Robinson Steam Electric Plant Unit 2, Brunswick Steam Electric Plant Units 1 and 2 & Shearon Harris Nuclear Power Plant Unit ML1001910052010-01-29029 January 2010 Notice of Conference Call with Progress Energy Carolinas, Inc., to Discuss H. B. Robinson Steam Electric Plant, Unit 2, Generic Letter 2004-02 Supplemental Response ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0524400382005-09-21021 September 2005 Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors. ML0506100282005-03-0303 March 2005 Closeout Memo, Bulletin 2003-02 SP-1500 Examination of RPV Lower Head Penetration Leakage ML0426003882004-09-16016 September 2004 Safety Evaluation on H. B. Robinson Request Involving Full Implementation of the Alternative Source Term, ML0409001302004-04-23023 April 2004 Renewal of Full-Power Operating License for H.B. Robinson, Unit No. 2 ML0410606752004-04-15015 April 2004 Ltr, Steam Generator Tube Inspection Letter ML0404104222004-02-0404 February 2004 Request Approval of Excused Absence for Employees Affected by Inclement Weather Conditions ML0327400092003-09-30030 September 2003 Results of the Robinson SDP Phase 2 Notebook Benchmarking Visit, During June 2003 ML0306504452003-03-0606 March 2003 Closeout of TAC Number for Best Estimate large-break loss-of-coolant Accident Methodology ML0301602062003-01-0808 January 2003 Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Robinson 2 ML0229703632002-10-23023 October 2002 Meeting with NEI, Surry & North Anna Units 1 & 2, McGuire & Catawba Units 1 & 2, Peach Bottom Units 2 & 3, St. Lucie Units 1 & 2, Fort Calhoun, H. B. Robinson Unit 2, R.E. Ginna, and Virgil C. Summer. the Proposed Agenda Is Attached ML0226700072002-09-24024 September 2002 Technical Specification Change Regarding Selective Implementation of Alternative Radiological Source Term ML0225601832002-09-13013 September 2002 Assessment of Radiological Consequences for 1.7% Power at H. B. Robinson Unit 2 Power ML0225502282002-09-12012 September 2002 Assessment of Atmospheric Dispersion & Radiological Dose Assessment for Fuel Handling Accident at H. B. Robinson Unit 2 Power ML0224003342002-08-27027 August 2002 NRR Notification of Significant Licensing Action for Proposed Issuance of Orders Re Responses to Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles. ML0218305842002-07-0808 July 2002 (HBRSEP2)-Additional Information Sent Via e-mail on June 6, 2002, by Carolina Power & Light Company (Cp&L) Regarding TS Change Request for Implementing Alternate Source Term ML0214200522002-05-13013 May 2002 Memo - Draft Response to RAI Received Via e-mail on 04/08/02 from CP&L on Relief Request RR-6 ML0214202542002-05-13013 May 2002 Memo -Draft Response to RAI Received Via e-mail on 04/08/02 from CP&L on Relief Request RR-6 ML0212301842002-04-26026 April 2002 Memo-Request for Additional Information Sent Via e-mail on January 10, 2002, to CP&L on a Relief Request NRC Generic Letter 1989-111989-06-30030 June 1989 NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level Redundancy ML0710202191983-05-24024 May 1983 Memo from Themis Speis to Roger Mattson Re Draft CRGR Package on A-30, DC Power 2023-01-10
[Table view] |
Text
October 28,2020 29, 2020 Formatted: Font color: Background 1
SUBJECT:
H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - SECURITY BASELINE INSPECTION REPORT 05000261/2020401
Dear Mr. Remick:
On October 15, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H.B. Robinson Steam Electric Plant, Unit 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/ Formatted: Font: Bold, Italic James C. Shehee, Chief Plant Support Branch Div of Reactor Safety Docket No. 05000261 License No. DPR-23
Enclosure:
As stated,
Inspection Report
Docket Number: 05000261 License Number: DPR-23 Report Number: 05000261/2020401 Enterprise Identifier: I-2020-401-0043 Licensee: Duke Energy Progress, LLC Facility: H.B. Robinson Steam Electric Plant, Unit 2 Location: Hartsville, SC Inspection Dates: August 3, 2020 to August 6, 2020 (Remote)
September 2421, 2020 - September 24, 2020 (Onsite)
October 14, 2020 - October 15, 2020 (Onsite)
Inspectors: J. Justice, Physical Security Inspector J. Wallo, Senior Physical Security Inspector I. Hall, Physical Security Inspector Approved By: James C. Shehee, Chief Plant Support Branch Div of Reactor Safety Formatted: Font color: Text 1 Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at H.B. Robinson Steam Electric Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was completed through a combination of remote and onsite inspection.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
Main article: IP 71130.02
(1)
- Tier III: 1 Requirement (02.09)
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program through
completion of the following inspection elements: Equipment Performance, Testing, and Maintenance
Main article: IP 71130.04
(1)
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
Main article: IP 71130.07
(1)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements: Security Plan Revision 13 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decreases in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) July 2019 through July
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 15, 2020, the inspectors presented the security baseline inspection results to Jeffrey Remick and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.02 Miscellaneous Various Key, Lock, and Core Control Records
Procedures AD-SY-ALL-0110 Protection of Information Related to Nuclear Security 6
AD-SY-ALL-0210 Site Access Controls 5
AD-SY-ALL-0215 Security Search and Entry Processing 4
AD-SY-ALL-0240 Security Key and Lock Control 1
AD-SY-ALL-0301 Nuclear Worker Unescorted Access Authorization Program 6
AD-SY-ALL-0310 Access Authorization Processing 5
AD-SY-ALL-0370 Access Processing of Foreign Nationals 1
AD-SY-ALL-0451 Behavior Observation Program 1
PO-SY-RNP- Final Access Control (FAC) 9
210
PO-SY-RNP- Visitor Processing 11
213
PO-SY-RNP- Sally Port Operations 12
20
PO-SY-RNP- SEP Search Officer 2
22
PO-SY-RNP- Vehicle Barrier Access Point (VBAP) Contact Officer 1
23
PO-SY-RNP- Controlled Access Area (CAA) and Use of SGI Outside the 4
281 CAA
PO-SY-RNP- RNP Security Keys and Lock Controls 1
290
Self-Assessments RNP 2020 06/08/2020
Baseline Security
Self-Assessment
Report
71130.04 Miscellaneous Various Intrusion Detection System Testing and Maintenance
Records
Various Security Communications Testing and Maintenance
Records
Various Security Uninterruptible Power Supply Testing and
Inspection Type Designation Description or Title Revision or
Procedure Date
Maintenance Records
Various Search Equipment Testing and Maintenance
Records
Procedures AD-SY-ALL-0580 Weapons Maintenance, Testing, and Accountability 6
AD-SY-ALL-0625 Security Owner Controlled Area (SOCA) Surveillance 0
Systems Maintenance and Testing
SP-012 Verification of Security System Component Operation 88
SP-021 Security System Tamper Test 029
71130.07 Miscellaneous Various Qualification Courses of Fire and Associated
Approvals
Various Security Training Lesson Plans
Various Security Officer Training Records and
Documentation
Procedures AD-SY-ALL-0510 Security Program Systematic Approach to Training 4
AD-SY-ALL-0520 Security Training 5
AD-SY-ALL-0524 Security On-The-Job (OJT) and Task Performance 1
Evaluation (TPE)
AD-SY-ALL-0540 Security Range Safety and Control 8
AD-SY-ALL-0560 Security Drill and Exercise Program 6
PY-SY-ALL-0005 Use of Force Policy 1
TG-SY-ALL-0500 Conduct of Fleet Courses of Fire and Physical Fitness Test 8
(PFT)
71130.09 Procedures Robinson Nuclear Plant Physical Security Plan 13
71151 Procedures AD-PI-ALL-0700 Performance Indicators 4
6