| | Issue date | Site | Title | Topic |
|---|
| ML25246C348 | 3 September 2026 | Robinson | Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 | |
| ML26209A372 | 28 July 2026 | Catawba | Notification of Licensed Operator CT 2027-301 | |
| IR 05000414/2026090 | 27 July 2026 | Catawba | NRC Inspection Report 05000414/2026090 | Enforcement Discretion Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Through-Wall Leak Eddy-Current Testing |
| ML26189A347 | 23 July 2026 | Oconee Mcguire Catawba Harris Brunswick Robinson McGuire | Mcguire Nuclear Station, Units 1 and 2; Oconee Nuclear Station, Units 1, 2, and 3; and H. B. Robinson Steam Electric Plant, Unit No. 2 - Amendments (L-2026-LLA-0031) | |
| ML26190A206 | 20 July 2026 | Brunswick | Issuance of Amendment Nos. 315 and 343 Adoption of TSTF-585, Revise LCO 3.0.3 to Require Managing Risk and TSTF-597, Eliminate LCO 3.0.3 Mode 2 Requirement | Fire Protection Program |
| ML26201A340 | 20 July 2026 | Catawba | PIR Notification of Inspection_Rfi | Probabilistic Risk Assessment Operator Manual Action Temporary Modification Aging Management Operability Determination Maintenance Rule Program |
| ML26201A132 | 17 July 2026 | Robinson | Summary of Verbal Authorization for SG PORV | |
| ML26203A070 | 16 July 2026 | Catawba | Requalification Program Inspection Catawba Nuclear | |
| ML26197A239 | 16 July 2026 | Catawba | Review of the Fall 2025 Steam Generator Tube Inspection Report (C2R27) | Stress corrosion cracking |
| IR 05000413/2026002 | 15 July 2026 | Catawba | Integrated Inspection Report 05000413/2026002 and 05000414/2026002 | Boric Acid High Radiation Area Nondestructive Examination Functionality Assessment Operability Determination Fire Protection Program Unidentified leakage |