IE Insp Rept 50-261/81-16 on 810511-0610.No Noncompliance Noted.Major Areas Inspected:Site Survey,Tmi Action Plan Requirements,Qa Practices,Outstanding Items Review & Plant Tour
ML14176A643
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/25/1981
From: Julian C, Weise S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML14176A642 List:
References
50-261-81-16, NUDOCS 8107240441
Download: ML14176A643 (7)


Text

P'kREG,,COMSSO

UNITED STATES SCLEAR REGULATORY COMMISSIO

REGION II

101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 Report N /81-16 Licensee: Carolina Power & Light Company 411 Fayetteville S Raleigh, NC 27602 Facility Name: H. B. Robinson Docket No. 50-261 License No. DPR-23 Inspector

/ r'&4 64-,

____6-

___qI S. Weise, Resident Inspector Date Signed Approved by i

_n___r-

_

C. A. Julian, Acting Section Chief, Division of Date Signed Resident and Reactor Project Inspection SUMMARY Inspection on May 11 - June 10, 1981 Areas Inspected This routine, announced inspection involved 104 resident inspector-hours on site in the areas of technical specification compliance, previous enforcement action followup, outstanding items review, plant tour, operations performance, housekeeping, site security, surveillance activities, TMI Action Plan requirements, maintenance activities, quality assurance practi-ces, radiation control activities, IE Bulletins and Notice Review, licensee event followup, and licensee modification followu Results Of the areas inspected, no violations or deviations were identifie PDR ADOCK 05000261

\\DR ADOPDR

DETAILS Persons Contacted Licensee Employees

  • R. B. Starkey, Plant General Manager H. S. Zimmerman, Director Plant Scheduling
  • S. Crocker, Manager, Environmental Radiation Control F. L. Lowery, Unit 2 Operations Supervisor M. Page, Engineering Supervisor
  • J. M. Curley, Manager, Technicial Support
  • F. M. Gilman, Specialist, Regulatory Compliance
  • W. Flanagen, Project Engineer C. Bethea, Training Supervisor Other licensee employees contacted included technicians, operators,

'mechanics, security force members, and office personne *Attended exit interview Exit Interview

.

The inspection scope and findings were summarized on June 9, 1981, with those persons indicated in paragraph 1 abov The licensee was advised that there were no violations or deviations noted. A commitment concerning the drawing control program was agreed upon as discussed in paragraph.

Licensee Action on Previous Inspection Findings (Closed)

Violation-Severity Level IV, 80-39-0 This item concerned the defeating of the turbine runback and automatic rod withdrawal block from any individual rod position indicator without performing a safety question review. The inspector reviewed the licensee's response letter of April 14, 198 The actions committed to by the licensee were confirmed to have been complete This item is close (Closed) Violation-Severity Level V, 81-02-0 This item concerned the failure to control a containment pressure indicator which was performing nonconservatively. The inspector reviewed the licensee's response on March 2, 1981, and Standing Order No. 7. A spot check was made of indications in the control room to verify that any indications that were out of tolerance were properly handled in accordance with Standing Order N.

No protection instruments 'were noted out of toleranc This item is close (Closed) Violation-Severity Level V, 81-03-0 This item dealt with the failure to keep annunciators and annunciator procedures curren The inspector reviewed the licensee's response letter of March 23, 1981, his subsequent actions, and the RTGB annunciators and annunciator

procedures. The inspector had no further questions on the licensee's corrective actions. This item is close (Closed) Infraction 80-26-01. This item dealt with the licensee's failure to properly store and identify fire protection equipment. The inspector reviewed the licensee's actions and found them consistent with his response letter of November 19, 198 The inspector's concerns with ensuring new personnel review the required procedures is discussed in paragraph 3.e belo This item is close (Closed) Infraction 80-26-0 This item concerned the licensee's failure to follow the requirements of the fire prevention welding procedure. The inspector reviewed the licensee's response letter of November 19, 1980, and determined that the following had occurred:

(1) The required reading file had been established and was documented as being read by appropriate personne (2) General Welding Procedure WP-500 had been revise (3) Controls on welder's symbols were as described in the above lette (4) The log of personnel not complying with requirements was not maintained due to there being no such personnel identified by the license The inspector. had no further questions on the specific corrective actions for this item. -However, there is no present program for ensuring that the large numbers of contractor personnel utilized during a refueling outage read the various procedures required by this item and paragraph above. The inspector is concerned that with various craftsmen having to read different required procedures and with no real system for dealing with a large influx of new personnel, it may be easy for individuals to perform work prior to reviewing all necessary procedure This is an inspector followup item for monitoring at the next major outag (81-16-01).

The infraction is close (Open) Violation -

Severity Level V,81-12-04. This item dealt with the licensee's failure to implement drawing control procedure The inspector reviewed the licensee's response letter of June 5, 1981, to Inspection Report 50-261/81-1 The inspector noted that the licensee's response on this item failed to provide a date when full compliance would be achieved. In discussions with licensee management, the inspector obtained a commitment that the following would occur:

(1) Licensee will identify those drawings which particularly impact plant operations, maintenance, and safety due to their association with safety-related equipment. (Approximately 1500 drawings).

(2)

Licensee will complete corrective action to have the above drawings, except Controlled Wiring Diagrams (CWDs)

updated by December 31, 198 CWD's will be updated by March 31, 198. Unresolved Items Unresolved items were not identified during this inspectio.

Licensee Event Followup On May 30, 1981, a contractor employee made an unauthorized entry into the

'B' steam generator for probing of steam generator tube The individual did not request health physics personnel coverage, as required, prior to entry and was not discovered for approximately 15 minute When health physics personnel discovered the contractor employee in the steam generator, he was told to leave but remained for several more minutes. This resulted in an exposure to his head which exceeds regulatory limits. The details of this occurrence are documented in inspection report 50-261/81-1.

Plant Tour The inspector conducted plant tours periodically during the inspection interval to verify that monitoring equipment was recording as required, equipment was properly tagged, operations personnel were aware of plant conditions, and plant housekeeping efforts were adequat The inspector determined that appropriate radiation controls were properly established, excess equipment or material was stored properly, and combustible material was disposed of expeditiously. During tours the inspector looked for the existence of unusual fluid leakds, piping vibrations, pipe hanger and seismic restraint abnormal settings, various valve and breaker positions, equipment clearance tags and component status, adequacy of firefighting equipment, and instrument calibration dates. Some tours were conducted on backshift The inspector noted no violations or deviation. Technical Specification Compliance During this reporting interval, the inspector verified compliance with selected limiting conditions for operation (LCO's) and reviewed results of selected surveillance test These verifications were accomplished by direct observation of monitoring instrumentation, valve positions, switch positions, and review of completed logs and record The licensee's compliance with selected LCO action statements were reviewed as they happene.

Plant Operations Review The inspector periodically during the inspection interval reviewed shift logs and operations records, including data sheets, instrument traces, and records of equipment malfunctions. This review included control room logs, tagout records. The inspector routinely observed operator alterness and demeanor during plant tour During abnormal events, operator performance

and response actions were observed and evaluate The inspector conducted random offhours inspections during the reporting interval to assure that operations and security remained at an acceptable leve Shift turnovers were observed to verify that they were conducted in accordance with approved licensee procedures. The inspector had no further comment.

Physical Protection The inspector verified by observation and interview during the reporting interval that measures taken to assure the physical protection of the facility met current requirement Areas inspected included the organization of the security force, the establishment and maintenance of gates, doors and isolation zones in the proper condition, that access control and badging was proper, that search practices were appropriate,, and that escorting and communications procedures were followe.

Review of IE Notices IEN's The inspector verified that IE Notices had been received on site and reviewed by cognizant licnesee personne Selected applicable IE Notices were discussed with licensee personnel to ascertain the licensees actions on these items. The inspector also verified that IE notices were reviewed by the Plant Nuclear Safety Committee in accordance with facility administrative policy. Licensee action on the following IE Notices were reviewed by the inspector and are close IE Notice 80-41 1 IE Bulletin Followup The inspector reviewed the licensee's May 26, 1981, response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety System -Component The inspector had no further question IE Bulletin 81-03 is close.

Outstanding Items Review a. (Closed)

Open item 79-30-0 Current Procedure at Waste Evaporator Panel. This item concerned the fact that there was no method in use to ensure that the correct revision to procedures are used at local stations outside the control roo The licensee has about ten controlled operating or annunciator procedures at various stations outside the control room. These procedures will be maintained current through the established procedure control and distribution system and will be the responsibility of an Operations Staff member. This item is close (Closed)

Inspector followup item 80-39-0 This item dealt, with the licensee's emergency procedures providing no linkage to operators to guide them to the Natural Circulation procedur The inspector

I

5 reviewed the licensee's recent revisions to emergency procedures EI-1 EI-4, EI-7, and EI-14, and General Procedure -6. The inspector had no further questions. This item is close.

TMI Action Plan Items TAP N II.F.2, NUREG 0578, 2.1.3.b Instrumentation to Detect Inadequate Core Coolin (1) This item required each PWR licensee to install a primary coolant saturation. meter (subcooling monitor).

An adequate subcooling monitor has been installed and an operating procedure (OP-54)

exists for the operator's us (2) This item also required that the licensee have a backup procedure for use of steam table This backup procedure exists as operating procedure OP-54 (3) The licensee has stated in his March 2, 1981, response letter to Inspection Report 50-261/81-02 that he will operate the core subcooling monitor in accordance with his proposed Technical Specification NUREG 0737, II.F.2, Item (1) is close TAP No. I.A.2.1. Modify RO/SRO Training (ITEM 4).

  • This item required that the inspector verify that training programs have been revised in accordance with office of NRR letter dated March 28, 1980, and CP&L letter RSEP/80-1035 dated July 11, 1980, to the Operator Licensing Branch. The inspector reviewed the licensee's revised training program schedule of classroom lectures, and lesson plan The licensee is in the process of implementing their revised training program as submitted to NRR for approva Training in heat transfer, fluid flow, and thermodynamics was held in March and April 1981. Training in mitigation of core damage is being conducted from April through July 198 The inspector audited portions of the mitigation of core damage cours The portions audited appeared adequate through the course is still undergoing revision based on participant inpu The inspector also reviewed the Simulator Retraining Program as provided to him in CP&L memorandum No-81-H69 With the exception of completion of any NRR review of the program, the inspector had no further question This item is close. Modifictaion of License Concening Primary Coolant System Pressure Isolation Valves OThe inspector reviewed the NRR Order date April 20, 1981, and subsequent licensee action The above Order required backleakage testing of low pressure safety injection check valves 875 A, B, C and 876 A, B, C and of

high pressure injection valves 874 A and These valves had not been tested within the last twelve months, necessitating that the MOV in each line be closed by May 20, 1981. However, these upstream MOV's are normally closed valves, and no safety evaluation was required. On May 11, 1981, the licensee requested a Technical Specification change to better reflect plant configuration and parallel valve testing capabilit These changes were granted by the Commission by License Amendment 56 on May 15, 198 The licensee commenced shutdown to cold shutdown on May 16, 1981, for steam generator eddy currrent testin The required check valve backleakage testing was conducted on June 10, 1981, while at hot shutdown Results of this testing (.Periodic Test 2.4) showed acceptable backleakage rate The inspector noted no violations or deviations.