IR 05000261/2022401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000261/2022401
ML22105A050
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/19/2022
From: Jannette Worosilo
Division of Reactor Safety II
To: Remick J
Duke Energy Progress
References
IR 2022401
Download: ML22105A050 (8)


Text

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT - SECURITY BASELINE INSPECTION REPORT 05000261/2022401

Dear Mr. Remick:

On March 24, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H.B. Robinson Steam Electric Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket No. 05000261 License No. DPR-23

Enclosure:

As stated,

Inspection Report

Docket Number:

05000261

License Number:

DPR-23

Report Number:

05000261/2022401

Enterprise Identifier:

I-2022-401-0041

Licensee:

Duke Energy Progress, LLC

Facility:

H.B. Robinson Steam Electric Plant

Location:

Hartsville, SC

Inspection Dates:

March 21-March 24, 2022

Inspectors:

R. Patterson, Physical Security Inspector

A. Richardson, Physical Security Inspector

J. Wallo, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at H.B. Robinson Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection, unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met, consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1) Tier I: All Requirements

Tier II: (02.05 a, b, 02.07 a, b, 02.08 a, c)

Tier III: (02.09, 02.10 a-c)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1) Tier I: All Requirements

Tier II: (02.05 a, 02.06 a, d, e, f, g, h, i, j, k, l, m, n, 02.07 a, b, c, e)

Tier III: (02.08, 02.09 a, b, 02.11 a)

(2)

Drill Observation (1 Sample)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1) Tier I: All Requirements

Tier II: (02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e)

Tier III: (02.10, 02.11 a, 02.12 a, 02.14 a-c)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1)

Review Security Plan Changes (IP Section 02.01) (1 Sample)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the last performance of this IP.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On March 24, 2022, the inspectors presented the security baseline inspection results to Jeffrey Remick and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Various Access Authorization Records

21 MRO/SAE Audit

10/27/2021

20-Fleet-PAA-

PR-01

Nuclear Oversight - Performance Review

01/30/2020

Miscellaneous

21-Fleet-PAA-

PR-01

Nuclear Oversight - Performance Review

06/17/2021

AD-SY-ALL-0301

Nuclear Worker Unescorted Access Authorization Program

Revision 7

AD-SY-ALL-0310

Access Authorization Program

Revision 7

AD-SY-ALL-0320

Personnel Access Data System

Revision 3

AD-SY-ALL-0340

Access Authorization Training and Qualification Program

Revision 2

AD-SY-ALL-0350

Reviewing Official's Guidance for Access Authorization

Revision 2

Procedures

AD-SY-ALL-0370

Access Processing of Foreign Nationals

Revision 2

71130.01

Self-Assessments 2020-Fleet-PAA-

Audit Report

07/09/2020

2407542

Improperly Secured Vehicle

21-2255971

21-2256011

21-2256158

21-2256427

21-2256431

21-2360945

21-2360969

Corrective Action

Documents

21-2362609

Various Local Law Enforcement Agreements

01/01/2022

Miscellaneous

LP-SY-ALL-0559

Controller/Evaluator Training

Revision 11

AD-SY-ALL-0120

Safety/Security Interface Processes

Revision 2

AD-SY-ALL-0210

Site Access Controls

Revision 6

AD-SY-ALL-0560

Security Drill and Exercise Program

Revision 8

AD-SY-RNP-

251

Contingency Response

Revision 0

71130.05

Procedures

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AD-SY-RNP-

254

Protective Strategy

Revision 0

TG-SY-ADV-0500

Composite Adversary Force Operations and Training Guide

Revision 0

2019-RNP-SEC-

Nuclear Oversight Audit Robinson Physical Security

2/21/19

Self-Assessments

20-RNP-SEC-

Nuclear Oversight Audit Robinson Physical Security

2/17/20

2405833

HHS Laboratory Reporting

2408778

Administrative Error

Corrective Action

Documents

2408781

HHS Laboratory Reporting

AD-SY-ALL-0400

Fitness for Duty Program

Revision 4

AD-SY-ALL-0405

Fitness for Duty Violations

Revision 3

AD-SY-ALL-0410

Fitness for Duty Collections

Revision 4

AD-SY-ALL-0415

Fitness for Duty Blind Performance Testing Procedure

Revision 3

AD-SY-ALL-0420

Fitness for Duty Unscheduled Call Out

Revision 1

AD-SY-ALL-0440

Fitness for Duty Training & Qualification

Revision 2

AD-SY-ALL-0451

Behavior Observation Program

Revision 4

AD-SY-ALL-0460

Managing Fatigue and Work Hour Limits

Revision 5

71130.08

Procedures

PY-SY-ALL-0004

Duke Energy Nuclear Generation Fitness for Duty Policy

Revision 2