Text
March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT (NRC INSPECTION REPORT 05000261/2012001)
Dear Mr. Gideon,
On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the H.B. Robinson Steam Electric Plant, Unit 2. The NRC reviewed the most recent quarterly Performance Indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, H.B. Robinson Steam Electric Plant, Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant, Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
We also plan on conducting several infrequently performed inspections which include: Operator Licensing Exams, TI 2515/182 and Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Phase 2. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4603 with any questions you may have regarding this letter.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects
Docket No.: 50-261 License No.: DPR-23
Enclosure: Robinson Inspection/Activity Plan (03/01/2013 - 06/30/2014)
cc w/Encl: (See page 3)
_________________________
X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP
SIGNATURE JGW:/RA/
RXM:/RA/
NAME JWorosilo RMusser
DATE 3/ /2013 3/
/20133/4/2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:w/encl Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532
Donald W. Barker Manager, Nuclear Oversight H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
J. W. (Bill) Pitesa Senior Vice President Nuclear Operations Duke Energy Corporation Electronic Mail Distribution
Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution
M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution
Mike Glover Director Site Operations H. B. Robinson Steam Electric Plant Electronic Mail Distribution
Richard Keith Holbrook Operations Manager H. B. Robinson Steam Electric Plant Electronic Mail Distribution
Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution
Sharon Wheeler Manager, Support Services H B Robinson Steam Electric Plant Electronic Mail Distribution
Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution
Richard Hightower Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution
Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution
David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128
Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution
Thomas Cosgrove Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
(cc:w/encl continued next page) (cc:w/encl. continued)
Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)
Progress Energy Electronic Mail Distribution
Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326
W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution
Mark Yeager Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution
Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211
Chairman North Carolina Utilities Commission Electronic Mail Distribution
Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550
John W. Flitter Director of Electric & Gas Regulation South Carolina Office of Regulatory Staff Electronic Mail Distribution Letter to William from Randall A. Musser dated March 4, 2013.
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT (NRC INSPECTION REPORT 05000261/2012001)
Distribution w/encl:
C. Evans L. Douglas OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
Robinson Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 1 03/04/2013 08:30:15 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
- COMPONENT DESIGN BASES INSPECTION
03/18/2013 03/22/2013 IP 7111121 Component Design Bases Inspection
04/08/2013 04/12/2013 IP 7111121 Component Design Bases Inspection
04/22/2013 04/26/2013 IP 7111121 Component Design Bases Inspection
05/13/2013 05/17/2013 IP 7111121 Component Design Bases Inspection
- EMERGENCY PREPAREDNESS EXERCISE
05/20/2013 05/24/2013 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event
05/20/2013 05/24/2013 IP 71151 Performance Indicator Verification
- RP PUBLIC RAD SAFETY BASELINE
05/20/2013 05/24/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment
05/20/2013 05/24/2013 IP 71124.07 Radiological Environmental Monitoring Program
05/20/2013 05/24/2013 IP 71151 Performance Indicator Verification
OL EXAM
- INITIAL EXAM PREP
07/08/2013 07/12/2013 V23392 ROBINSON/JULY 2013 INITIAL EXAM AT POWER FACILITIES
OL EXAM
- INITIAL EXAM WEEK
07/29/2013 08/02/2013 V23392 ROBINSON/JULY 2013 INITIAL EXAM AT POWER FACILITIES
TI-182
- TI-182 BURIED PIPING/TANK - PHASE 2
08/26/2013 08/28/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping
- UNIT 2 INSERVICE INSPECTION
09/23/2013 09/27/2013 IP 7111108P Inservice Inspection Activities - PWR
SGISI
- UNIT 2 SG INSERVICE INSPECTION
09/30/2013 10/04/2013 IP 7111108P Inservice Inspection Activities - PWR
- RAD HAZARDS ANALYSIS AND TRANSPORTATION
10/07/2013 10/11/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
10/07/2013 10/11/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
10/07/2013 10/11/2013 IP 71151 Performance Indicator Verification
- EP PROGRAM INSPECTION
05/05/2014 05/09/2014 IP 7111402 Alert and Notification System Testing
05/05/2014 05/09/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
05/05/2014 05/09/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
05/05/2014 05/09/2014 IP 71151 Performance Indicator Verification Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure