IR 05000261/2011001

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter (Report 05000261/2011001)
ML110630060
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/04/2011
From: Mccree V
Region 1 Administrator
To: Duncan R
Carolina Power & Light Co
Shared Package
ML110630051 List:
References
IR-11-001
Download: ML110630060 (2)


Text

Page 1 of 2 Robinson 03/04/2011 06:53:11 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 95002 - 95002 SUPPLEMENTAL INSPECTION 8 2 05/31/2011 06/10/2011 IP 95002 Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor 95001 - 95001 SUPPLEMENTAL INSPECTION 2 2 03/21/2011 03/25/2011 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area PSB1-RP - RP PUBLIC RADIATION SAFETY INSP 5 2 05/23/2011 05/27/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2 05/23/2011 05/27/2011 IP 71124.04 Occupational Dose Assessment 2 05/23/2011 05/27/2011 IP 71124.05 Radiation Monitoring Instrumentation 2 05/23/2011 05/27/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 05/23/2011 05/27/2011 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 05/23/2011 05/27/2011 IP 7111401 Exercise Evaluation 2 05/23/2011 05/27/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/23/2011 05/27/2011 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM PREP 4 2 11/07/2011 11/11/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 2 11/28/2011 12/02/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 4 2 12/05/2011 12/09/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES PSB1-RP - OCCUPATIONAL RP BASELINE WK1 3 2 01/23/2012 01/27/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 01/23/2012 01/27/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 01/23/2012 01/27/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 01/23/2012 01/27/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 01/23/2012 01/27/2012 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 01/30/2012 02/03/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK2 4 2 02/06/2012 02/10/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 02/06/2012 02/10/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 02/06/2012 02/10/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 02/06/2012 02/10/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 02/06/2012 02/10/2012 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 2 of 2 Robinson 03/04/2011 06:53:11 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 2 05/07/2012 05/11/2012 IP 71152B Identification and Resolution of Problems 2 05/21/2012 05/25/2012 IP 71152B Identification and Resolution of Problems PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 2 05/21/2012 05/25/2012 IP 7111402 Alert and Notification System Testing 2 05/21/2012 05/25/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/21/2012 05/25/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/21/2012 05/25/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/21/2012 05/25/2012 IP 71151 Performance Indicator Verification EB3 HS - TRIENNIAL HEAT SINK INSPECTION 1 2 06/04/2012 06/08/2012 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.