SUBJECT:
H.B. ROBINSON STEAM ELECTRIC PLANT - INTEGRATED INSPECTION REPORT 05000261/2022001
Dear Ms. Flippin:
On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H.B. Robinson Steam Electric Plant. On April 18, 2022, the NRC inspectors discussed the results of this inspection with Ms. Laura Basta, Plant Manager, and other members of your staff.
The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No. 05000261 License No. DPR-23
Enclosure:
As stated
Inspection Report
Docket Number:
05000261
License Number:
Report Number:
Enterprise Identifier:
I-2022-001-0028
Licensee:
Duke Energy Progress, LLC
Facility:
H.B. Robinson Steam Electric Plant
Location:
Hartsville, SC
Inspection Dates:
January 01-March 31, 2022
Inspectors:
M. Fannon, Senior Resident Inspector
J. Walker, Resident Inspector
Approved By:
David E. Dumbacher, Chief
Reactor Projects Branch 3
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting an integrated inspection at H.B. Robinson Steam Electric Plant, in
accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs
program for overseeing the safe operation of commercial nuclear power reactors. Refer to
https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 2 operated at or near rated thermal power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection, unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met,
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase. The inspectors performed activities described in IMC 2515,
Appendix DProperty "Inspection Manual Chapter" (as page type) with input value "NRC Inspection Manual 2515,</br></br>Appendix D" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process., Plant Status, conducted routine reviews using IP 71152, Problem Identification
and Resolution, observed risk significant activities, and completed on-site portions of IPs. The
inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel to assess licensee performance and compliance with Commission rules and
regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
(1)
The inspectors evaluated readiness for seasonal extreme weather conditions prior to
the onset of seasonal cold temperatures and high winds for the following systems:
Steam driven auxiliary feedwater (SDAFW) and emergency diesel generator (EDG)
fuel oil storage and transfer on January 10-13, 2022.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following
systems/trains:
(1)
'B' EDG during 'A' EDG maintenance on January 6, 2022
(2)
'A' EDG prior to fast speed start test on February 2 and 3, 2022
(3)
'C' component cooling water (CCW) on March 15, 2022
(4)
'A' and 'B' station batteries on March 22 and 23, 2022
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
(1)
The inspectors evaluated system configurations during a complete walkdown of the
auxiliary feedwater system on February 28-March 3, 2022.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a
walkdown and performing a review to verify program compliance, equipment functionality,
material condition, and operational readiness of the following fire areas:
(1)
fire zone 5, CCW room on January 4, 2022
(2)
fire zone 3, safety injection (SI) pump room on January 31, 2022
(3)
fire zone 4, charging pump room on February 8, 2022
(4)
fire zone 6, motor driven auxiliary feedwater (MDAFW) on March 2, 2022
(5)
fire zone 22, main control room on March 22, 2022
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
(1)
SI pump room on January 11-20, 2022
71111.07A - Heat Exchanger/Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
(1)
'A' EDG jacket water heat exchanger
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
(1)
The inspectors observed and evaluated licensed operator performance in the control
room during a reduction in power to 97 percent for a MDAFW surveillance test,
SDAFW surveillance test, and the subsequent return to full power on March 8, 2022.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
(1)
The inspectors observed and evaluated an annual licensed operator requalification
exam on March 2, 2022.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following
structures, systems, and components (SSCs) remain capable of performing their intended
function:
(1)
'C' CCW with a known outboard seal leak (Nuclear Condition Report [NCR] 2413835)
Quality Control (IP Section 03.02) (1 Sample)
The inspectors evaluated the effectiveness of maintenance and quality control activities to
ensure the following SSC remains capable of performing its intended function:
(1)
'A' EDG during maintenance activities (Work Order [WO] 20460356 and 20423045)
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the
following planned and emergent work activities to ensure configuration changes and
appropriate work controls were addressed:
(1)
dedicated shutdown diesel generator (DSDG) automatic start failure on
January 5, 2022
(2)
'A' EDG fuel oil leak repair on January 6, 2022
(3)
'B' residual heat removal (RHR) maintenance activities on January 18, 2022
(4)
'A' EDG two-year overhaul from February 21 through 23, 2022
(5)
steam generator pressure protection channel testing schedule change due to
inclement weather on March 30, 2022
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the
following operability determinations and functionality assessments:
(1)
NCR 2410799, DSDG failed to automatically start during surveillance test
(2)
NCR 2416880, 'A' EDG fuel injector number 11 found leaking
(3)
NCR 2413835, increased leakage on the 'C' CCW outboard seal
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)
The inspectors evaluated the following temporary or permanent modifications:
(1)
Engineering Change (EC) 418883, 'E' deep well pump installation
(2)
EC 269423, DSDG auto-start feature addition
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the following post-maintenance testing activities to verify system
operability and/or functionality:
(1)
OST-401-1, 'A' EDG slow start following fuel oil return header hose replacement on
January 6, 2022
(2)
OST-252-2, 'B' RHR valve test following maintenance activities on January 18, 2022
(3)
OST-401-1, 'A' EDG slow start following two-year overhaul on February 23, 2022
(4)
WO 20507942, 'B' service water booster pump operation verification following
maintenance activities on March 22, 2022
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance testing activities to verify system operability
and/or functionality:
Surveillance Tests (other) (IP Section 03.01) (3 Samples)
(1)
OST-409-1, 'A' EDG fast speed surveillance test on February 3, 2022
(2)
MST-003, overpower and over temperature protection channel testing on
March 16, 2022
(3)
MST-013, steam generator water level protection channel testing on March 28, 2022
Inservice Testing (IP Section 03.01) (2 Samples)
(1)
OST-202, SDAFW system component test on March 8, 2022
(2)
OST-251-1, 'A' RHR pump and component test on March 9, 2022
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1
Sample)
(1)
The inspectors observed and evaluated an emergency preparedness drill on
January 26, 2022. The drill involved a steam generator tube rupture on the 'B' steam
generator, a trip of the 'A' CCW pump, main steam line break, failure of the SDAFW
pump, and large break loss of coolant accident.
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
The inspectors evaluated:
(1)
The inspectors observed and evaluated an emergency preparedness training
evolution on March 9, 2022. The training evolution involved a small break loss of
coolant accident that continued to increase in size to a large break, a loss of an
emergency electrical bus, unavailability of both containment spray trains, and a leak
of the waste gas decay tank resulting in a radiological release.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)
(1)
January 1-December 31, 2021
MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)
(1)
January 1-December 31, 2021
BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)
(1)
January 1-December 31, 2021
71152A - Annual Follow-up Problem Identification and Resolution
Annual Follow-up of Selected Issues (Section 03.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program
related to the following issues:
(1)
NCR 2416880, 'A' EDG cylinder fuel oil injector leak
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On April 18, 2022, the inspectors presented the integrated inspection results to
Ms. Laura Basta, Plant Manager, and other members of the licensee staff.