Operator Manual Action or Manual Operator Action is part of a pre-planned sequence in response to an event. Its specific to a required step when a person needs to perform an action. This is in contrast to an automatic action which is when an instrument detects and activates something.
Discussion on manual action vs automatic action
Automatic is generally more reliable then a human action. So if a plant uses a manual action to accomplish a safety function it receives scrutiny that its trained, practiced, and validated. In regard to a change per 50.59, changing an automatic to manual operator action will normally require NRC approval.
The reason to use manual action instead of automatic is because automatic could result in unnecessary automatic actuation. If time permits, it may be preferred for a person to interpret the plant conditions as valid prior to system actuation. For example, preventing scrams in response to invalid signals.
Topic |
|---|
|
|
| All by date | | | Start date | Site | Title |
|---|
| ML26043A214 | 12 February 2026 | | Feb 13 Public Workshop: Evaluating NEIs Digital Instrumentation and Controls Recommendations for Accelerating NRC Reform | | ML26027A103 | 3 February 2026 | River Bend | Issuance of Amendment No. 220 Revision to the Licensing Basis and Minimum Basin Water Level for the Ultimate Heat Sink | | ML25317A783 | 10 December 2025 | Wolf Creek | Issuance of Amendment No. 245, Request for Deviation from Fire Protection Requirements | | ML25338A265 | 4 December 2025 | Wolf Creek | Draft Wolf Creek Portable Lighting SE for Licensee Comment - 12-4-2025 | | ML25324A400 | 20 November 2025 | Palisades | Joint Petitioners Motion to Withdraw All Petitions | | ML25304A101 | 31 October 2025 | Crane | Crane Clean Energy Center - Emergency Action Levels | | ML25304A104 | 31 October 2025 | Crane | Crane Clean Energy Center - Emergency Action Levels | | ML25307A047 | 30 October 2025 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 33, Chapter 8, Electrical Systems | | RS-25-145, Radiological Emergency Plan Addendum Revision. Includes EP-AA-1003, Addendum 3, Revision 9, Emergency Action Levels for Clinton Station | 23 October 2025 | Clinton | Radiological Emergency Plan Addendum Revision. Includes EP-AA-1003, Addendum 3, Revision 9, Emergency Action Levels for Clinton Station | | ML25290A106 | 13 October 2025 | Susquehanna | Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Appendix 15a, Nuclear Safety Operational Analysis (Nsoa) - (a System-Level/Qualitative Type Plant FMEA) |
|
|---|