ML23227A249

From kanterella
Revision as of 13:57, 13 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

International, HI-STORM FW Amendment 7 RAI 3-10 Response Clarification Call Action Items
ML23227A249
Person / Time
Site: 07201032
Issue date: 08/15/2023
From: Elisio D
Holtec
To: Yen-Ju Chen
Office of Nuclear Material Safety and Safeguards, Document Control Desk
Shared Package
ML23227A248 List:
References
CAC 001028, EPID L-2021-LLA-0053
Download: ML23227A249 (1)


Text

Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

August 15, 2023

Yen-Ju Chen, Sr. Project Manager Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Docket No. 72-1032, Certificate of Compliance (CoC) No. 1032 CAC No. 001028, EPID No. L-2021-LLA-0053

Subject:

HI-STORM FW Amendment 7 RAI 3-10 Response Clarification Call Action Items

Reference:

[1] Clarification Call with Holtec on HI-STORM FW Amendment 7 Request for Additional Information (RAI) 3-10 Conversation Record between Holtec and NRC associates dated August 3, 2023. ADAMS Accession No. ML23216A217.

Dear Ms. Chen:

By conversation dated August 3, 2023 [1], the NRC Staff requested clarification on some of the Holtec responses to RAI 3-10 to continue their review of the HI-STORM FW Amendment 7. The meeting minutes summarize some discussion between Holtec and the NRC before the call as well as two action items to be completed by Holtec in the weeks following the call. Completion of those two action items is documented in Attachment 1. Attachment 2 contains a proprietary supporting document.

Since some attachments to this letter contain Holtec proprietary information, an affidavit requesting this information be withheld in accordance with 10CFR2.390 is included as Attachment 3.

If you have any questions or require any additional information, please contact me at 856-797-0900 ext. 3326.

Document ID 5018108 Page 1 of 2 Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

Sincerely,

Denise Elisio Licensing Engineer, Holtec International

cc:(via email)

Yoira Diaz-Sanabria (USNRC)

Kimberly Manzione (Holtec)

Attachments: : Summary of Clarification Call Action Items (non-proprietary) : Holtec Dry Storage Position Paper DS-331, Structural Acceptance Criteria for the Metamic-HT Fuel Basket, Revision 3 (proprietary) : Affidavit in Accordance with 10CFR2.390

Document ID 5018108 Page 2 of 2