Forwards IE Insp Rept 50-261/81-19 on 810611-0710 & Notice of Violation
ML14176A661
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/22/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML14176A659 List:
References
NUDOCS 8109090515
Download: ML14176A661 (2)


See also: IR 05000261/1981019

Text

JUL 2 2 1981

Carolina Power and Light Company

ATTN: Mr. J. A. Jones, Senior Executive

Vice President and Chief

Operating Officer

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

Subject:

Report No. 50-261/81-19

This refers to the routine safety inspection conducted by Mr. S. Weise of this

office on June 11 - July 10, 1981, of activities authorized by NRC Operating

License No. DPR-23 for the H. B. Robinson facility. Our preliminary findings

were discussed with Mr.. R. B. Starkey, Plant Manager at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be.established. Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within the

8109090515 810828

I PDR ADOCK 05000261

G

_PDR

Carolina Power & Light Company

2

specified periods noted above, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report No. 50-261/81-19

cc w/encl:

R. B. Starkey, Jr., Plant Manager

bcc w/encl:

NRC Resident Inspector

Central Files

Local Public Document Room

Washington Public Document Room

Nuclear Safety Information Center

Technical Information Center

Document Management Branch

State of South Carolina

RII

RII

RH

SWeise:dt

C

n

RButcher

C~wis

7/,Z/81

7/

1

7/.ZI/81

7/ 4be