The Reactor Coolant System (RCS) is about the water in the reactor and its boundary.
System |
---|
|
|
| Site | Start date | Title | Description |
---|
ML24289A119 | South Texas | 24 October 2024 | Final ASP Analysis - South Texas Project (Unit 2), Automatic Reactor Trip and Actuation of Two of Three EDGs (LER 499-2024-001) - Reject | | IR 05000354/2024003 | Hope Creek | 23 October 2024 | Integrated Inspection Report 05000354/2024003 | | ML24296B213 | Three Mile Island | 22 October 2024 | Slides for October 25, 2024, Meeting on Crane Clean Energy Center Regulatory Path to Restoring the Operating Reactor License Basis | | IR 05000317/2024003 | Calvert Cliffs | 22 October 2024 | Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 | | ML24295A123 | Arkansas Nuclear | 21 October 2024 | Enclosure 3: Relief Request ANO2-RR-24-001, Revision 0 (Non-Proprietary) | | BW240061, Core Operating Limits Report, Cycle 25, Revision 17 | Braidwood | 17 October 2024 | Core Operating Limits Report, Cycle 25, Revision 17 | | LR-N24-0062, Proposed Changes to Enclosure 2 Volume 13, ITS Section 3.8 Electrical Power Systems, of the Improved Technical Specification Conversion License Amendment Request | Hope Creek | 17 October 2024 | Proposed Changes to Enclosure 2 Volume 13, ITS Section 3.8 Electrical Power Systems, of the Improved Technical Specification Conversion License Amendment Request | | PMNS20241312, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, License Amendment Request to Revise Technical Specification 3.4.14 Related to Reactor Coolant System Pressure Isolation Valve Leakage | Sequoyah | 17 October 2024 | Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, License Amendment Request to Revise Technical Specification 3.4.14 Related to Reactor Coolant System Pressure Isolation Valve Leakage | | L-2024-159, Core Operating Limits Report for Reload Cycle 24 | Seabrook | 15 October 2024 | Core Operating Limits Report for Reload Cycle 24 | | ML24289A235 | Vogtle | 15 October 2024 | Supplemental Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 PRHR LAR | |
|