ML23128A303: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 May 8, 2023 Yen-Ju Chen, Sr. Project Manager Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-1032, Certificate of Compliance (CoC) No. 1032 CAC No. 001028, EPID No. L-2021-LLA-0053
{{#Wiki_filter:Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909
 
May 8, 2023
 
Yen-Ju Chen, Sr. Project Manager Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards
 
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
 
Docket No. 72-1032, Certificate of Compliance (CoC) No. 1032 CAC No. 001028, EPID No. L-2021-LLA-0053


==Subject:==
==Subject:==
Line 30: Line 38:


==Dear Ms. Chen:==
==Dear Ms. Chen:==
By {{letter dated|date=March 23, 2023|text=letter dated March 23, 2023}} [1], the NRC staff sent Requests for Additional Information (Part
By {{letter dated|date=March 23, 2023|text=letter dated March 23, 2023}} [1], the NRC staff sent Requests for Additional Information (Part
: 5) to support review of Amendment 7 for the HI-STORM FW Certificate of Compliance No. 1032.
: 5) to support review of Amendment 7 for the HI-STORM FW Certificate of Compliance No. 1032.
A clarification call [2] between Holtec and the NRC was held on March 29, 2023. Holtec understood the need for additional information and expressed our plan to submit that information by May 8, 2023, in a {{letter dated|date=April 6, 2023|text=letter dated April 6, 2023}} [3]. Holtecs responses to the NRC staff RAIs Part 5 are in the attachments to this letter.
A clarification call [2] between Holtec and the NRC was held on March 29, 2023. Holtec understood the need for additional information and expressed our plan to submit that information by May 8, 2023, in a {{letter dated|date=April 6, 2023|text=letter dated April 6, 2023}} [3]. Holtecs responses to the NRC staff RAIs Part 5 are in the attachments to this letter.
The responses to the RAIs are provided in Attachment 1, with Attachment 2 being a non-proprietary copy. Changes to the FSAR as a result of the RSIs are included in Attachments 3 and Document ID 5018104 Page 1 of 2


Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 4 for both proprietary and non-proprietary versions, respectively. All proposed changes in Attachments 3 and 4 based on the RAI responses are highlighted in yellow to facilitate the NRC staffs review. Attachments 5 and 6 contain the revised licensing drawings supporting the RAI responses. Attachments 7 through 9 contain proprietary documents to support the RAI responses.
The responses to the RAIs are provided in Attachment 1, with Attachment 2 being a non-proprietary copy. Changes to the FSAR as a result of the RSIs are included in Attachments 3 and Document ID 5018104 Page 1 of 2 Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909
 
4 for both proprietary and non-proprietary versions, respectively. All proposed changes in Attachments 3 and 4 based on the RAI responses are highlighted in yellow to facilitate the NRC staffs review. Attachments 5 and 6 contain the revised licensing drawings supporting the RAI responses. Attachments 7 through 9 contain proprietary documents to support the RAI responses.
 
Since some attachments to this letter contain Holtec proprietary information, an affidavit requesting this information be withheld in accordance with 10CFR2.390 is included as Attachment
Since some attachments to this letter contain Holtec proprietary information, an affidavit requesting this information be withheld in accordance with 10CFR2.390 is included as Attachment
: 10. If you have any questions or require any additional information, please contact me at 856-797-0900 ext. 3326.
: 10. If you have any questions or require any additional information, please contact me at 856-797-0900 ext. 3326.
Sincerely, Denise Elisio Licensing Engineer, Holtec International cc:(via email)
 
Sincerely,
 
Denise Elisio
 
Licensing Engineer, Holtec International
 
cc:(via email)
Yoira Diaz-Sanabria (USNRC)
Yoira Diaz-Sanabria (USNRC)
Kimberly Manzione (Holtec)
Kimberly Manzione (Holtec)
Attachments: : HI-STORM FW Amendment 7 RAI Responses Part 5 (proprietary) : HI-STORM FW Amendment 7 RAI Responses Part 5 (non-proprietary) : HI-STORM FW FSAR Proposed Revision 10H, changed pages (proprietary) : HI-STORM FW FSAR Proposed Revision 10H, changed pages (non-proprietary) : Changes to Proposed Licensing Drawing-12283 (proprietary) : Changes to Proposed Licensing Drawing-12288 (proprietary) : Appendix N to Holtec Report HI-2094353, Analysis of Non-Mechanistic Tipover and Drop Events of Loaded HI-STORM FW Storage Cask (Revision 19)
Attachments: : HI-STORM FW Amendment 7 RAI Responses Part 5 (proprietary) : HI-STORM FW Amendment 7 RAI Responses Part 5 (non-proprietary) : HI-STORM FW FSAR Proposed Revision 10H, changed pages (proprietary) : HI-STORM FW FSAR Proposed Revision 10H, changed pages (non-proprietary) : Changes to Proposed Licensing Drawing-12283 (proprietary) : Changes to Proposed Licensing Drawing-12288 (proprietary) : Appendix N to Holtec Report HI-2094353, Analysis of Non-Mechanistic Tipover and Drop Events of Loaded HI-STORM FW Storage Cask (Revision 19)
(proprietary) : Holtec Report HI-2200503, Analysis of the Non-Mechanistic Tipover Event of the Loaded HI-STORM FW Version E Storage Cask (Revision 4) (proprietary) : Holtec Report HI-2210313, Analysis of the Non-Mechanistic Tipover Event of the Loaded HI-STORM FW Version UVH Storage Cask (Revision 1)
(proprietary) : Holtec Report HI-2200503, Analysis of the Non-Mechanistic Tipover Event of the Loaded HI-STORM FW Version E Storage Cask (Revision 4) (proprietary) : Holtec Report HI-2210313, Analysis of the Non-Mechanistic Tipover Event of the Loaded HI-STORM FW Version UVH Storage Cask (Revision 1)
(proprietary) 0: Affidavit in Accordance with 10CFR2.390 Document ID 5018104 Page 2 of 2}}
(proprietary) 0: Affidavit in Accordance with 10CFR2.390
 
Document ID 5018104 Page 2 of 2}}

Latest revision as of 17:30, 14 November 2024

International - HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 5
ML23128A303
Person / Time
Site: 07201032
Issue date: 05/08/2023
From: Elisio D
Holtec
To: Yen-Ju Chen
Office of Nuclear Material Safety and Safeguards, Document Control Desk
Shared Package
ML23128A302 List:
References
CAC 001028, EPID L-2021-LLA-0053, 5018104
Download: ML23128A303 (1)


Text

Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

May 8, 2023

Yen-Ju Chen, Sr. Project Manager Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Docket No. 72-1032, Certificate of Compliance (CoC) No. 1032 CAC No. 001028, EPID No. L-2021-LLA-0053

Subject:

HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 5

Reference:

[1] Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Request for Additional Information Batch 5, letter from Y. Chen (NRC) to D. Elisio (Holtec) dated March 23, 2023. ADAMS Accession No. ML23074A101.

[2] Conversation Call with Holtec on HI-STORM FW Amendment 7 RAI Batch 5, conversation record of March 29, 2023, call between Holtec and NRC. ADAMS Accession No. ML23100A091.

[3] Schedule for Responses to HI-STORM FW Amd. 7 Requests for Additional Information Part 5, letter from D. Elisio (Holtec) to Y. Chen (NRC) dated April 6, 2023. ADAMS Accession No. ML23096A301.

Dear Ms. Chen:

By letter dated March 23, 2023 [1], the NRC staff sent Requests for Additional Information (Part

5) to support review of Amendment 7 for the HI-STORM FW Certificate of Compliance No. 1032.

A clarification call [2] between Holtec and the NRC was held on March 29, 2023. Holtec understood the need for additional information and expressed our plan to submit that information by May 8, 2023, in a letter dated April 6, 2023 [3]. Holtecs responses to the NRC staff RAIs Part 5 are in the attachments to this letter.

The responses to the RAIs are provided in Attachment 1, with Attachment 2 being a non-proprietary copy. Changes to the FSAR as a result of the RSIs are included in Attachments 3 and Document ID 5018104 Page 1 of 2 Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

4 for both proprietary and non-proprietary versions, respectively. All proposed changes in Attachments 3 and 4 based on the RAI responses are highlighted in yellow to facilitate the NRC staffs review. Attachments 5 and 6 contain the revised licensing drawings supporting the RAI responses. Attachments 7 through 9 contain proprietary documents to support the RAI responses.

Since some attachments to this letter contain Holtec proprietary information, an affidavit requesting this information be withheld in accordance with 10CFR2.390 is included as Attachment

10. If you have any questions or require any additional information, please contact me at 856-797-0900 ext. 3326.

Sincerely,

Denise Elisio

Licensing Engineer, Holtec International

cc:(via email)

Yoira Diaz-Sanabria (USNRC)

Kimberly Manzione (Holtec)

Attachments: : HI-STORM FW Amendment 7 RAI Responses Part 5 (proprietary) : HI-STORM FW Amendment 7 RAI Responses Part 5 (non-proprietary) : HI-STORM FW FSAR Proposed Revision 10H, changed pages (proprietary) : HI-STORM FW FSAR Proposed Revision 10H, changed pages (non-proprietary) : Changes to Proposed Licensing Drawing-12283 (proprietary) : Changes to Proposed Licensing Drawing-12288 (proprietary) : Appendix N to Holtec Report HI-2094353, Analysis of Non-Mechanistic Tipover and Drop Events of Loaded HI-STORM FW Storage Cask (Revision 19)

(proprietary) : Holtec Report HI-2200503, Analysis of the Non-Mechanistic Tipover Event of the Loaded HI-STORM FW Version E Storage Cask (Revision 4) (proprietary) : Holtec Report HI-2210313, Analysis of the Non-Mechanistic Tipover Event of the Loaded HI-STORM FW Version UVH Storage Cask (Revision 1)

(proprietary) 0: Affidavit in Accordance with 10CFR2.390

Document ID 5018104 Page 2 of 2