{{Adams
{{Adams
| number = ML20207F012
| number = ML20214S837
| issue date = 12/23/1986
| issue date = 06/02/1987
| title = Ack Receipt of 860630 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/86-06 & 50-366/86-06.Civil Penalty Should Remain as Presented in Notice of Violation.Encl Withheld (Ref 10CFR2.790 & 73.21)
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/86-06 & 50-366/86-06
| author name = Grace J
| author name = Grace J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Miller J
| addressee name = Oreilly J
| addressee affiliation = GEORGIA POWER CO.
| addressee affiliation = GEORGIA POWER CO.
| docket = 05000321, 05000366
| docket = 05000321, 05000366
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = EA-86-069, EA-86-69, NUDOCS 8701050369
| document report number = NUDOCS 8706100009
| title reference date = 05-18-1987
| package number = ML20214S839
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 1
}}
}}


Line 18: Line 20:


=Text=
=Text=
{{#Wiki_filter:_ __ _ __ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ______ ____ _________ _ _ _ _ _ - _ _ _ - _ _ _ _ .
{{#Wiki_filter:=
  -.
  -,
. DEC 231986
JUN 021987 Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 Georgia ATTN: Mr.Power James P.Conpany'Reilly O
Senior Vich President-Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-321/86-06 AND 50-366/86-06
      '
Thank you for your response of May 18, 1987, to our Notice of Violation issued on May 18, 1986, concerning activities conducted at your Hatch facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte


;
Sincerely, J. Nelson Grace Regional Administrator cc: J. T. Beckham, Vice President, Plant Hatch H. C. Nix, Site Operations General Manager A. Fraser, Acting Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing bcc: NRC Resident Ins)ector Executive Secretary Hug NRR /DRIS/SBh S. Jordan, Document Control Desk (RIDS IE04), 016 State of' Georgia gg61gg O
Docket Nos. 50-321, 50-366 License Nos. OPR-57, NPF-5 EA 86-69 l
gg, PDR-RII RII RII i i RI RII OMas lb oc DThompson M
Georgia Power Company ATTN: Mr. J. H. Miller, J President P. O. Box 4545 Atlanta, GA 30302
DMcGuire lipe J hr g
.
FCantrell
!  Gentlemen:
,
SUBJECT:  NRC INSPECTION REPORT NOS. 50-321/86-06 AND 50-366/86-06 Thank you for your response of June 30, 1986, to our Notice of Violation and Proposed Imposition of Civil Penalty issued on May 28, 1986, concerning licensed activities conducted at your Hatch facility. We have evaluated your responses to violations I, II.A, and II.C and found that they meet the requirements of 10 CFR 2.210. We will examine the implementation of your corrective actions during future inspection Af ter careful consideration of the basis of yeur request that the proposed civil penalty for Violation I be mitigated, we have concluded, for the reasons presented in the enclosure to this letter, that the civil penalty should remain as presented in the Notice of Violatio A detailed review of information presented in your request for reduction of the Severity Level for violations II.A and II.C has been determined not to be of sufficient basis to warrant reductio Your btsis for dental of Violation !!.B is that a functional test was performed on all intrusion alarms. Your are requested to provide the basis for your statement and any documentation of the functional test to this office for review and further evaluation of violation II.B in a supplemental response. For the reasons presented in the enclosure to this letter, your stated bases for denial of violations II.D and II.E are not considered to be adequate justification for withdrawal of these violations. Therefore, in accordance with 10 CFR 2.210(a),
05 y 87 05/34/87 05/p/87 05g /87 / /87 g//-/87 RII RII R '/ RII RI A
please submit to this office within 30 days of the date of this letter your supplemental response for violation II.B and a written statement describing steps which have been taken to correct violations II.D and II.E. the results achieved, corrective steps which will be taken to avoid further violations, and the date when full compliance will be achieve In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosure to this letter will ng be placed in the NRC Public Document Roo ['[GINr cenu g, ADOCK 0500  ,
VBroVnlee t/
t ,
LRey>es G n ns
ifDR
    @
        -
    'R odda st _
        'EGUARDS INFORMATION 3-0 y *N
/p/87 / /87 g/87 0 W /87 0/f/87
 
..
, Georgia Power Company  2 DEC 231986 The responses directed by this letter are not subject to the clearance procedure of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-51
 
Sincerely, J. Nelson Grace Regional Administrator Enclosures:
1. Staff Assessment of Licensee Response (SafeguardsInformation) Revised Citation (SafeguardsInformation)
cc w/ enc 1:
J. P. O'Peilly, Senior Vice President Nuclear Operations J. T. Beckham, Vice President, Plant Hatch H. C. Nix, Sites Operations General Manager A. Fraser, Acting Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing bec w/ enc 1:
IE File NMSS/SGPL NRR/DL/SSPB bcc w/o encl:
NRC Resident Inspector State of Georgia
    '
R11 ' RI RI! RII J5tdhb
  #
alk r f,$nkiNs it
, 12p:/86 [1243/86 12/a3/86 124}/86
      * ' G 03tlM COH1 Ain;
  :,AFEGUARDS INFORMATION  < l37ggggrgrjca
      'M 38 DECONTRCLLED.
}}
}}

Latest revision as of 07:24, 4 May 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/86-06 & 50-366/86-06
ML20214S837
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/02/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20214S839 List:
References
NUDOCS 8706100009
Download: ML20214S837 (1)


Text

=

-,

JUN 021987 Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 Georgia ATTN: Mr.Power James P.Conpany'Reilly O

Senior Vich President-Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/86-06 AND 50-366/86-06

'

Thank you for your response of May 18, 1987, to our Notice of Violation issued on May 18, 1986, concerning activities conducted at your Hatch facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, J. Nelson Grace Regional Administrator cc: J. T. Beckham, Vice President, Plant Hatch H. C. Nix, Site Operations General Manager A. Fraser, Acting Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing bcc: NRC Resident Ins)ector Executive Secretary Hug NRR /DRIS/SBh S. Jordan, Document Control Desk (RIDS IE04), 016 State of' Georgia gg61gg O

gg, PDR-RII RII RII i i RI RII OMas lb oc DThompson M

DMcGuire lipe J hr g

FCantrell

,

05 y 87 05/34/87 05/p/87 05g /87 / /87 g//-/87 RII RII R '/ RII RI A

VBroVnlee t/

LRey>es G n ns

@

'R odda st _

/p/87 / /87 g/87 0 W /87 0/f/87