Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions
ML20210F603
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/15/1999
From: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210F608 List:
References
HL-5810, NUDOCS 9908020065
Download: ML20210F603 (2)


Text

-

z I

turis Sammer Southern Nuclear Vice Presider

  • Operabag Company. loc.

Hatch Project Support 40 Inverness Parkway Post Office Box 1295 Birmingham, Alabama 35201

]

Tel 205.992.7279 )

Fax 205.9910341 )

1 July 15, 1999 SOL"THERNL 1 ME Docket Nos. 50-321 g,,,, ,, S,,,,, ron,r r,ru "50-36C HL-5810

' U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant FSAR and FHA Amendments Ladies and Gentlemen:

In accordance with the provisions of 10 CFR 50.7'1, Southern Nuclear Operating Company (SNC) hereby submits I signed original and 10 copics of this amendment to the Final Safety Analysis Reports (FSARs) (Revision 17B) and the Fire Hazards Analysis and Fire Protection Program (FHA) (Revision 14B) for Plant Hatch Units 1 and 2.

Prior FSAR amendment 17A (January 1999) and prior FHA amendment 14A (January 1999), in conjunction with enclosed FSAR amendment 17B and FHA amendment 14B, reflect plant changes through January 1999, thereby satisfying the requirements of 10 CFR 50.71.

In accordance with NEI 98-03 Revision 1, section A6, SNC hereby reports the information removed in FSAR amendment 17B. Unit 1 FSAR Chapter 14, Plant Safety Analysis, and Unit 2 FSAR Chapter 15, Accident Analysis, have been combined, with redundant information removed.

As such, Unit 1 FSAR Chapter 14 is deleted in its entirety and the combined safety analysis is contained in Unit 2 FSAR Chapter 15. This change is consistent with the virtually identical system designs, and similar thennal-hydraulic and transien: behavior characteristics of the two units. This ,

change was prepared as part of the ongoing Plant Hatch FSAR upgrade program. I in accordance with 10 CFR 50.71(e), Mr. H. L. Sumner, Jr. states he is a Vice President of Southern Nuclear Operatii.,, Company and is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his knowledge and belief, the information contained in the enclosed FSAR and FHA amendments accurately presents changes made since the i previous submittal, necessary to reflect infornmtion and analyses submitted to the Commission or prepared pursuant to Commission requirements.

Respectfully submitted,

' ~

g0 bM N :y H. L. Sumner, Jr.

Sworn to andsubscribed before me this l5 % day of , On , J999.

V- 0 0 Os& My commission expires:

WNNS SENIER17,2000 U Notary Public 9909020065 990715 ~

PDR ADOCK 05000321 M PDR  ;

m

p U.S. Nuclear Regulatory Commission Page 2 July 15,1999 CLT/eb

Enclosures:

1. Plant Hatch Unit 1 FSAR Amendment 17B
2. Plant Hatch Unit 2 FSAR Amendment 17B
3. Plant Hatch Units and 2 FRA Amendment 14B cc: Southem Nuclear Operatina Company (w/o enclosures)

Mr. P. H. Wells, Nuclear Plant General Manager SNC Document Management (R-Type A02.001)

U. S. Nuclew Regulatory Commission. Washincton. D. C.

Mr. L. N. Olshan, Licensing Project Manager - Hatch U. S. Nuclear Reculatory Commission. Region 11 Mr. L. A. Reyes, Regional Administrator Mr. J. T. Munday, Senior Resident inspector - Hatch State ofGeorcia (w/o enclosures)

Mr. L.C. Barrett, Commissioner - Department of Natural Resources 1

i l

I HL-5810

1 Lewis Sumner Southern Nuclear Vice President Operating Company. inc.

Hatch Project Support 40 invemess Parkway Post Office Box 1295 i Birmingham, Alabama 35201 l

pg  ;

Tel 205.992.7279

( Fax 205.992.0341 A

%J July 15, 1999 SOUTHERN L COMPANY Docket Nos. 50-321 Energy to Serve kr%rld* j r"~% 50-366 C) U.S. Nuclear Regulatory Commission HL-5810 ATTN: Document Control Desk Washington, D.C. 20555

(.

Edwin I. Hatch Nuclear Plant (V) FSAR and FHA Amendments Ladies and Gentlemen: <

l In accordance with the provisions of 10 CFR 50.71, Southern Nuclear Operating Company (SNC) ,

hereby submits I signed original and 10 copies of this amendment to the Final Safety Analysis l Reports (FSARs)(Revision 17B) and the Fire Hazards Analysis and Fire Protection Program (FHA)(Revision 14B) for Plant Hatch Units I and 2.

1 Prior FSAR amendment 17A (January 1999) and prior FHA amendment 14A (January 1999), in I conjunction with enclosed FSAR amendment 17B and FHA amendment 14B, reflect plant changes l

,A through January 1999, thereby satisfying the requirements of 10 CFR 50.71.

In accordance with NEl 98-03 Revision 1, section A6, SNC hereby reports the information removed in FSAR amendment 17B. Unit 1 FSAR Chapter 14, Plant Safety Analysis, and Unit 2 FSAR Chapter 15, Accident Analysis, have been combined, with redundant information removed.

As such, Unit 1 FSAR Chapter 14 is deleted in its entirety and the combined safety analysis is contained in Unit 2 FSAR Chapter 15. This change is consistent with the virtually identical system designs, and similar thermal-hydraulic and trantient behavior characteristics of the two units. This change was prepared as part of the ongoing Plant Hatch FSAR upgrade program.

In accordance with 10 CFR 50.71(c), Mr. H. L. Sumner, Jr. states he is a Vice President of Southern Nuclear Operating Company and is authorized to execute this oath on behalf of Southem Nuclear Operating Company, and to the best of his knowledge and belief, the information contained in the enclosed FSAR and FHA amendments accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements.

Respectfully submitted, p ,

\v h g

H. L. Sumner, Jr.

,m

, Sworn to ond subscribed before me this 15 6) day of O- 1999.

V O O OsoO My commission expires

U NotaryPublic mm"mN EXPIRES SEPTBeER U,2X c=Rcwmeer2ao j

II 1

O U.S. Nuclear Regulatory Commission Page 2 July 15,1999 O CLT/eb

Enclosures:

1. Plant Hatch Unit 1 FSAR Airer.dirgrit 17B O 2. Plant Hatch Unit 2 FSAR Amendment 17B
3. Plant Hatch Units I and 2 FHA Amendment 14B cc: Southem Nuclear Operatine Comoany [w/o enclosures)

Mr. P. H. Wells, Nuclear Plant General Manager l SNC Document Management (R-Type A02.001)

_U. S. Nuclear Renulatory Commission. Washinnton. D. C.

Mr. L. N. Olshan, Licensing Project Manager - Hatch

- U. S. Nuclear Renulatory Commission. Renion 11 Mr. L. A. Reyes, Regional Administrator Mr. J. T. Munday, Senior Resident inspector - Hatch state of Georaia (w/o enclosures)

Mr. L.C. Barrett, Commissioner - Department of Natural Resources O

O O

HL 5810

1 Lewis Sumner Southern Nuclear Vice President Operating Company Inc.

Hatch Project Support 40 invemess Parkway Post Office Box 1295 Birmingham, Alabama 35201

) Tel 205.992.7279 V Fax 205.992.0341

)

July 15, 1999 SOUTHERN L COMPANY

, Docket Nos. 50-321 Energy to Serve Mr1rorld*

('") 50-366 HL-5810 U.S. Nuclear Regulatory Commission ATFN: Document Controi Desk Washington, D.C. 20555

/

Edwin 1. Hatch Nuclear Plant FSAR and FHA Amendments _ 1 Ladies and Gentlemen:

l In accordance with the provisions of 10 CFR 50.71, Southern Nuclear Operating Company (SNC) i hereby submits I signed original and 10 copies of this amendment to the Final Safety Analysis Reports (FSARs) (Revision 17B) and the Fire Hazards Analysis and Fire Protection Program (FHA) (Revision 14B) for Plant Hatch Units I and 2. I Prior FSAR amendment 17A (January 1999) and prior FHA amendment 14A (January 1999), in n) conjunction with enclosed FSAR amendment 17B and FHA amendment 14B, reflect plant changes through January 1999, thereby satisfying the requirements of 10 CFR 50.71, in accordance with NEl 98-03 Revision I, section A6, SNC hereby reports the information removed in FSAR amendment 178. Unit 1 FSAR Chapter 14, Plant Safety Analysis, and Unit 2 FSAR Chapter 15, Accident Analysis, have been combined, with redundant information removed.

As such, Unit 1 FSAR Chapter 14 is deleted in its entirety and the combined safety analysis is contained in Unit 2 FSAR Chapter 15. This change is consistent with the virtually identical system designs, and similar thermal-hydraulic and transient behavior characteristics of the two units. This change was prepared as part of the ongoing Plant Hatch FSAR upgrade piogram.

In accordance with 10 CFR 50.71(c), Mr. H. L. Sumner, Jr. states he is a Vice President of

. Southem Nuclear Operating Company and is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his knowledge and belief, the information (V) contained in the enclosed FSAR and FHA amendments accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements.

,;qj

, Respectfully submitted, Q.J -

} ' tOO ~ q&r H. L. Sumner, Jr.

) Sworn to andsubscribedbefore me this I5 % day of ak, J999.

v v 0 0 .Os a & My commission expires:

I U Notary Pubhc M

"SSrJNEXPlRES SEPTEMBER U,20t

[ h .

p 1

U.S. Nuclear Regulatory Commission l Page 2 July 15,1999 l CLT/eb

Enclosures:

1. Plant Hatch Unit 1 FSAR Amendment 17B
2. Plant Hatch Unit 2 FSAR Amendment 17B l 3. Plant Hatch Units 1 and 2 FHA Amendment 14B cc: Southern Nuclear Operating Comoany (w/o enclosures)

Mr. P. H. Wells, Nuclear Plant General Manager l SNC Document Management (R-Type A02.001) -

! U. S. Nuclear Reaulatory Commission. Washington. D. C.

l. Mr. L. N. Olshan, Licensing Project Manager - Hatch l

l U. S. Nuclear Regulatorv Commission. Region 11 Mr. L. A. Reyes, Regional Administrator Mr. J. T. Munday, Senior Resident inspector - Hatch l State of Geornia' (w/o enclosures)

! . Mr. L.C. Barrett, Commissioner - Depanment of Natural Resources l

i O .

i HL-5810 l

J

i Lew5 Sumner Southern N: clear Vice President Operating Company,Inc.

Hatch Project Support 40 invemess Parkway Post Office Box 1295 l l

l ,- Birmingham, Alabama 35201

( ) Tel 205.992.7279 Fax 205.992.0341 July 15, 1999 SOUTHERN L COMPANY p Docket Nos.50-32l 5,,,gy ,, S,,,, yo,, w,,ig ~

id 50-366 HL 5810 U.S. Nuclear Regulatory Commission ATFN: Document Control Desk Washington, D.C. 20555 (V )

Edwin 1. Hatch Nuclear Plant FS AR and FHA Amendments 1

Ladies and Gentlemen-j In accordance with the provisions of 10 CFR 50.71, Southern Nuclear Operating Company (SNC) hereby submits 1 signed original and 10 copies of this amendment to the Final Safety Analysis Reports (FSARs)(Revision 17B) and the Fire Hazards Analysis and Fire Protection Program I

(FHA) (Revision 14B) for Plant Hatch Units I and 2.

Prior FSAR amendment 17A (January 1999) and prior FHA amendment 14A (January 1999), in p conjunction with enclosed FSAR amendment 178 and FHA amendment 14B, reflect plant changes h through January 1999, thereby satisfying the requirem? m of 10 CFR 50.71.

In accordance with NEl 98-03 Revision 1, section A6, SWC hercby reports the information removed in FSAR amendment 17B. Unit 1 FSAR Chapter 14, Plant Safety Analysis, and Unit 2 FSAR Chapter 15, Accident Analysis, have been combined, with redundant information removed.

As such, Unit 1 FSAR Chapter 14 is deleted in its entirety and the combined safety analysis is contained in Unit 2 FSAR Chapter 15. This change is consistent with the virtually identical system designs, and similar thermal hydraulic and transient behavior characteristics of the two units. This change was prepared as part of the ongoing Plant Hatch FSAR upgrade program.

In accordance with 10 CFR 50.71(c), Mr. H. L. Sumner, Jr. states he is a Vice President of Southern Nuclear Operating Company and is authorized to execute this oath on behalf of Southern n Nuclear Operating Company, and to the best of his knowledge and belief, the information

(]

\ contained in the enclosed FSAR and FHA amendments accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements.

Respectfully submitted, V s GWVJ -

l H. L. Sumner, Jr.

f

/% Sworn to andsubscribed before me this IS Ha day of On, J999.

9

\} V O W' r.Q O O a, o O My commission expires:

""M DPESSEPTEMBER17,2 U NotaryPublic l

M D9 coo 066 M

U.S. Nuclear Regulatory Commission Page 2 July 15,1999

' CLT/eb

Enclosures:

1. Plant Hatch Unit 1 FSAR Amendment 17B
2. Plant Hatch Unit 2 FSAR Amendment 17B
3. Plant Hatch Units I and 2 FHA Amendment 14B cc: Southern Nuclear Operatinn Comoaj!y (w/o enclosures)

Mr. P. H. Wells, Nuclear Plant General Manager SNC Document Management (R-Type A02.001)

U. S. Nuclear Renulatory Commission. Washinnton. D. C.

Mr. L. N. Olshan, Licensing Project Manager - Hatch

~ U. S Nuclear Renulatory Commission. Renion 11 Mr. L. A. Reyes, Regional Administrator Mr. J. T. Munday, Senior Resident inspector - Hatch  !

State of Geornia (w/o enclosures)  !

Mr. L.C. Barrett, Commissioner - Department of Natural Resources

^

O O -

l l

HL-5810