Forwards Insp Repts 50-321/89-17 & 50-366/89-17 on 890612-16 & 0731-0804.No Violations or Deviations Noted
ML20247B393
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/05/1989
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20247B398 List:
References
NUDOCS 8909130018
Download: ML20247B393 (2)


See also: IR 05000321/1989017

Text

__ . _ _ _ _ .

& WIC/&l

,. .

.. .-

. SEP 0 51989

r-

.c

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/89-17 AND 50-366/89-17

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

R. R. Marston and C. A. Hughey on June 12-16 and July 31 - August 4, 1989. The

inspection included a review of activities authorized for your Hatch facility.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us. i

i

Sincerely, l

I

CTIGfNAL SIGNED BY I

DOUGLAS /A COLINS l

Douglas M. Collins, Chief

Emergency Preparedness and '

Radiological Protection Branch i

Division of Radiation Safety

and Safeguards

Enclosure:

NRC Inspection Report

cc w/ encl: (See page 2)  ;

i

8909130018 890905

PDR

O

ADOCK 05000321

PDC

'] l

'

-

... . _ _

b i

. - - - __

.L

. ..

'*. *

Georgia Power Company 2

h.

!

l'

cc W/ encl:

R. P. Mcdonald, Executive Vice.

President. Nuclear Operations

J. T. Beckham, Vice President

Plant Hatch

Y H. C. Nix,LGeneral Manager

'

Plant Hatch

.0. M. Fraser, Site Quality

Assurance Manager

J. Heidt, Manager, Nuclear

Engineering and Licensing

Plant Hatch.

S.,B. Tipps, Manager of Nuclear

Safety and Compliance

State of Georgia

bec'w/ encl:.

L. P. Crocker, NRR

K. E Brockman, RII

NRC Resident Inspector

Document Control Desk

RII:DRSS pS RI RP

on # TDecker AHqrdt

8/Z3/89 8/2-f89 84T89

_ _ _ - __ _