Forwards SER Finding Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2
ML20210J950
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/02/1999
From: Olshan L
NRC (Affiliation Not Assigned)
To: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20210J957 List:
References
GL-96-05, TAC-M97054, TAC-M97055, NUDOCS 9908050149
Download: ML20210J950 (4)


Text

s

[ f tto

'o UNITED ST/ TES g

y p,

NUCLEAR REGULATOR.Y COMMISSION p

WASHINGTON, D. C. 20555 August 2, 1999 1

Mr. H. L. Sumner, Jr.

Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2 RE: SAFETY EVALUATION OF LICENSEE RESPONSE TO GENERIC LETTER 96-05, (TAC NOS. M97054 AND M97055)

Dear Mr. Sum'ier:

On September 18,1996, the NRC issued Generic Letter (GL) 96-05, " Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves," requesting each nuclear power plant licensee to establish a program, or to ensure the effectiveness of its current program, to verify on a periodic basis that safety-related motor-operated valves (MOVs) continue to be capable of performing their safety functions within the current licensing bases of the facility.

On October 29,1996, you submitted a 60-day response to GL 96-05 stating that you would implement the requested MOV periodic verification program at Edwin 1. Hatch Nuclear Plant, Units 1 and 2. On March 17,1997, you submitted a 180-day response to GL 96-05 providing a summary description of the MOV penodic verification program planned to be implemented at Hatch. In a letter dated February 27,1998, you updated your commitment to GL 96-05. On April 9,1999, you provided a response to a request for additional information regarding GL 96-05 forwarded by the NRC staff on January 28,1999.

We have reviewed your submittals and applicable NRC inspection reports for the MOV program at Hatch. Based on our understanding of your commitment to all three phases of the Joint Owners Group (JOG) Program on MOV Periodic Verification, we find that you have established an acceptable program to verify periodically the design-basis capability of the safety-related MOVs at Hatch. As discussed in the enclosed safety evaluation (SE), we conclude thr,i you are g

adequately addressing the actions requested in GL 96-05. The NRC staff may conduct I

inspections at Hatch to verify that the implementation of the MOV periodic verification program is in accordance with your commitments; this NRC SE; the NRC SE dated October 30,1997, on i

h 9908050149 990002 PDR ADOCK 05000321 p

PDR

f H. L. Sumner, Jr. August 2, 1999 the JOG Program on MOV Periodic Verification; and the NRC SE dated February 27,1996, on the Boiling Water Reactors Owners Group methodology for ranking MOVs by their safety

. significance.

Sincerely, Original signed by:

Leonard N. Olshan, Senior Project Manager, Section 1 Project Directorate ll Division of Licensing Project Management Office of Nuclear Reactor Regulation

' Docket Nos. 50-321 and 50-366

Enclosure:

Safety Evaluation cc w/ encl: See next page

\\

Distribylign; (Docket File L 4

PUBLIC ti PD ll-1 R/F TScarborough STingen RScholl-SE only

)

OGC

)

ACRS j

PSkinner, Rll 1

DOCUMENT NAME: G:\\PDil-1\\ HATCH \\9605sehatch.wpd'

To receive a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy with attachment /enclosur9 N = No copy OFFICC(3 PDll-1/PM PDil-1/LA 6 SC:PDll NAME LOlshan:cn CHawes N REmch DATEl 7 /Z6 /99' y/M/gg 7 /k/gg OFFICIAL RECORD COPY 0500'21

H. L. Sumner, Jr. the JOG Program on MOV Periodic Verification; and the NRC SE dated February 27,1996, on the Boiling Water Reactors Owners Group methodology for ranking MOVs by their safety significance.

Sincerel,

lYk Leonard N. Olshan, Senior Project Manager, Section 1 Project Directorate il Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366

Enclosure:

Safety Evaluation cc w/ encl: See next page

)

}

I Edwin 1. Hatch Nuclear Plant i

cc:

Mr. Ernest L. Blake, Jr.

_ Charles A. Patrizia, Esquire Shaw, Pittman, Potts Paul, Hastings, Janofsky & Walker and Trowbridge 10th Floor 2300 N Street, NW.

1299 Pennsylvania Avenue Washington, DC 20037 Washington. DC 20004-9500 Mr. D. M. Crowe Chairman Manager, Licensing Appling County Commissioners Southern Nuclear Operating County Courtheuse Company, Inc.

Baxley, Georgia 31513 P. O. Box 1295 Birmingham, Alabama 35201-1295 Mr. J. D. Woodard Executive Vice President Resident inspector Southern Nuclear Operating Plant Hatch Company, Inc.

11030 Hatch Parkway N.

P. O. Box 1295 Baxley, Georgia 31531 Birmingham, Alabama 35201-1295 Mr. Charics H. Badger Mr. P. W. Wells Office of Planning and Budget General Manager, Edwin I. Hatch Room 610 Nuclear Plant 270 Washington Street, SW.

Southern Nuclear Operating Atlanta, Georgia 30334 Company, Inc.

U.S. Highway 1 North Harold Reheis, Director P. O. Box 2010 i

Department of Natural Resources Baxley, Georgia 31515 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 Mr. R. D. Barker j

Program Manager Steven M. Jackson Fossil & Nuclear Operations Senior Engineer - Power Supply Oglethorpe Power Corporation Municipal Electric Authority 2100 East Exchange Place of Georgia P. O. Box 1349 1470 Riveredge Parkway, NW Tucker, Georgia 30085-1349 Atlanta, Georgia 30328-4684