AUG 0 21989
Docket Nos. 50-321, 50-366
Georgia Power Ccepany
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Doerations
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
SUBJECT: NRC INSPECTI0a REPORT N05. 50-321/89-12 AND 50-366/89-12
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Messrs. J. E. Menning and R. A. Musser on June 24 - July 21,1989.
The
inspection included a review of activities authorized for your Hatch facility.
At the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report.
Within
these areas, tt'e inspection consisted of selective examinations of procedures
and representa:ive records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
However, because all of the criteria for categorization of
licensee-identified violations were met, two violations are not being cited.
Therefore, no response to these violations is required. The details pertaining
to these licensee-identified non-cited violations are described in the enclosed
Inspection Report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
,
b
i
Ala
R. Herdt, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ enc 1:
(See page 2)
8908100182 890802
P
t\\
ADOCK 05000321
_ _ _ _
-___
l
.-_-
__
._
. - _ _ _ _ _ _ _ _ _ _ - _ - - .
. _ _
. _ _ _ _ _ , _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ - _
-
. .
.
.
' Georgia Power Company
2
AUG 0 21999
-
.cc w/ enc 1:
R. P. Mcdonald, Executive Vice
President Naclear Operations
J. T. Beckham, Vice President
Plant Hatch
'H. C. Nix, General Manager
Plant Hatch
0. M..Fraser.. Site _ Quality
Assurance Manager-
.
J. Heidt, Manager, Nuclear
- i
Engineering and Licensing
Plant Hatch
S. B. Tipps,'ManagerLof Nuclear
Safety and Compliance
State of Georgia
bec w/ enc 1:
L. P. Crocker, NRR
K. E Brockman, RII
NRC Resident Inspector
Document Control Desk-
l
l
LTrocine:er
08/;2/89
!
!