Forwards Insp Repts 50-321/89-12 & 50-366/89-12 on 890624-0721.Violations Noted.Violation Not Being Cited Due to Licensee Meeting All of Criteria for Categorization of licensee-identified Violations
ML20248C904
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/02/1989
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20248C908 List:
References
NUDOCS 8908100182
Download: ML20248C904 (2)


See also: IR 05000321/1989012

Text

- - _ _ _ _ - _ _ _ _ _ - _ .

'

$

AUG 0 21989

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Georgia Power Ccepany

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Doerations

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NRC INSPECTI0a REPORT N05. 50-321/89-12 AND 50-366/89-12

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Messrs. J. E. Menning and R. A. Musser on June 24 - July 21,1989. The

inspection included a review of activities authorized for your Hatch facility.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, tt'e inspection consisted of selective examinations of procedures

and representa:ive records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. However, because all of the criteria for categorization of

licensee-identified violations were met, two violations are not being cited.

Therefore, no response to these violations is required. The details pertaining

to these licensee-identified non-cited violations are described in the enclosed

Inspection Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

,

b i

Ala R. Herdt, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ enc 1: (See page 2)

8908100182 890802 P t\

PDR ADOCK 05000321

_ _ _ _ -___ l .-_- __ ._

. - _ _ _ _ _ _ _ _ _ _ - _ - - . . _ _ . _ _ _ _ _ , _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ - _

-

. .

.

.

' Georgia Power Company 2

AUG 0 21999

-

.cc w/ enc 1:

R. P. Mcdonald, Executive Vice

President Naclear Operations

J. T. Beckham, Vice President

Plant Hatch

'H. C. Nix, General Manager

Plant Hatch

0. M..Fraser.. Site _ Quality

Assurance Manager- .

J. Heidt, Manager, Nuclear :i

Engineering and Licensing

Plant Hatch

S. B. Tipps,'ManagerLof Nuclear

Safety and Compliance

State of Georgia

bec w/ enc 1:

L. P. Crocker, NRR

K. E Brockman, RII

NRC Resident Inspector

Document Control Desk-

l

l LTrocine:er

08/;2/89

!

!