Discusses Insp Repts 50-321/86-08 & 50-366/86-08 on 860224-0303 & Forwards Notice of Violation
ML20211K226
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/16/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20211K232 List:
References
NUDOCS 8606270353
Download: ML20211K226 (2)


Text

ydoa '

.

.s JUN 161986 f Docket Nos. 50-321, 50-366 e

License Nos. DPR-57, NPF-5

,

ATTN:[i Power Company Georg Mr. R. J. Kelly-Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

INSPECTION REPORT NOS. 50-321/86-08 AND 50-366/86-08 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by G. A. Schnebli and W. K. Poertner on February 24 - March 3, 1986. The inspection included a review of activities authorized for your Hatch facility.

At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.- The report documenting this inspection was sent to you with a letter dated April 4,1986.

Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activi_ ties in progress.

The inspection findings were previously identified to you in our letter, dated April 4,1986, and indicated that certain activities appeared to violate NRC

?

requirements.

As stated in that letter, no Notice of Violation was issued for one of the violations identified as it was under consideration for escalated enforcement action.

Our review is completed and the 1 violation, references to pertinent requirements, and elements to be included in your response are

,

described in the enclosed Notice of. Violation.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter;and its enclosure will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosure are.not subject to the-clearance procedures of the Office of Management and Budget as required by the

Paperwork. Reduction Act of 1980, PL 96-511.

i Should you have any questions concerning this letter, please contact us.

Sincerely, hbI 00$ $Iobob21 h0id hfftb b-G PDR Luis A. - Reyes, Acting Director

,

Division of Reactor Projects

Enclosure:

(See page 2)

>

V h ze/

-

-

. _ _ _ _

-

.

.

JUN 16 B&b Georgia Power Company

Enclosure:

Notice of Violation 9c w/ encl:

/J. T. Beckham, Vice President and

/ General Manager-Nuclear Operation V. C. Nix, Site General Manager

. E. Fornel, Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing

/ccw/ encl:

f1RC Resident Inspector

}

V Hugh S. Jordan, Executive Secretary Document Control Desk State of Georgia

,

c

/

RII RII RII R

RI RII I

II l

FJf/86 GSchnebli:bhg Wo tner e

/}Herdt bson VBf'ownlee k ns

t/g/86

// /86

$/f/86

/86 5/30'86 5/ 10/86 L, >ft

_