Ack Receipt of Util Withdrawing 880711 Request for Relief from ASME Code Section XI Requirement for Testing Class 2 Portions of Main Steam Lines of Units at 1.25 Times Design Pressure.Code Case N-479 Acceptable for Use at Plant
ML20247B076
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/19/1989
From: Crocker L
Office of Nuclear Reactor Regulation
To: Hairston W
GEORGIA POWER CO.
References
TAC-71943, TAC-71944, NUDOCS 8907240033
Download: ML20247B076 (2)


Text

_ _ _ _ _ _ _

July'19, 1989 Docket Nos. 50-321 Distribution:

50-366 (Docket file..

L. Crocker NRC PDR" R. Hermann Mr. W. G. Hairston, III PD 11-3 Reading OGC (Info. only)

Senior Vice President. -

S. Varga E. Jordan Nuclear Operations G. Lainas B. Grimes Georgia Power Company D. Matthews ACRS (10)

P. O. Box 1295 M. Rood Hatch Plant File Birmingham, Alabama 35201

Dear Mr. Hairston:

SUBJECT:

HYDROSTATIC TESTING OF MAIN STEAM PIPING, EDWIN 1. HATCH HUCLEAR PLANT, UNITS 1 AND 2 (TACS 71943 and 71944)

In a letter dated July 11, 1988, Georgia Power Company (GPC) requested relief from the ASME Code Section XI requirement for testing the Class 2 portions of the main steam lines _ of the Hatch units at 1.25 times the design pressure.

In a letter dated Cctober 13, 1988, the staff denied this reque t based upon insufficient technical information to justify a determination that the Code-required test was impractical.

By letter dated January 23, 1989, GPC provided additional information in support of the relief request, and informed the staff that, in a parallel action, it had been in contact with the ASME Section XI Code Committee to request a rvision to the Code requirement.

Subsequently, a GPC letter dated May 30,19<

informed the staff that on May 5,1989, the full ASME committee had approved a Code Case (N-479) that would allow alternate testing of the Class 1 and Class 2 portions of the main steam lines at the~ same time at Class 1 pressure. Although Code Case N-479 has not been approved for general usage by the NRC, it has been reviewed and found to be acceptable for use at Hatch Units 1 and 2.

This approved Code Case will allow hydrostatic testing of the main steam lines eff9ctively as initially proposed by GPC in its July 11, 1988, relief request.

Accordingly, relief is no longer needed and the May 30, 1989 letter withdrew l

the relief request.

In accordance w Mh the May 30, 1989 letter from GPC, the staff is taking no further action on the relief request and this matter is closed.

Please call me if you have any questions.

Sincerely, I

Original signed by:

l Lawrence P. Crocker, Pro, ject Manager Project Directorate 11-3 8907240033 890719 Division of Reactor Projects - 1/II ADOCK 0500 1

fDR Office of Nuclear Reactor Regulation P

cc:

3 See next page M[oodPD f1 3 PD II-3 11-3 7

{0 LCrocker: sa DMatthews 7//f/89 7 //f/89 q/g/89

~

~

  1. \\

,e

~

cc:

G. F. Trowbridge, Esq.

Mr. R. P. Mcdonald Shaw, Pittman, Potts and Trowbridge Executive Vice President -

2300 N Street, N. W.

Nuclear Operations Washington, D.C.

20037 Georgia Power Company P.O. Box 1295 Mr. L. T. Gucwa Birmingham, Alabama 35201 Engineering Department Georgia Power Company Mr. Alan R. Herdt, Chief P. O. Box 1295 Project Branch #3 Birmingham, Alabama 35201 U.S. Nuclear Regulatory Comission 101 Marietta Street, NW, Suite 2900 Nuclear Safety and Compliance Manager Atlanta, Georgia 30323 Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.

P. O. Box 1295 Birmingham, Alabama 35201 Resident Inspector U.S. Nuclear Regulatory Comission Route 1, Box 725 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.

Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Director Environmental Protection Division l

Department of Natural Resources l

205 Butler Street, S.E.,

Suite 1252 l

Atlanta, Georgia 30334 l

Chairman i

Appling County Commissioners County Courthouse Baxley, Georgia 31513

_- _ ____- ___ _ ___- _ _ a

_