ML20205M301

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non-cited Violation Identified
ML20205M301
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/02/1999
From: Skinner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20205M304 List:
References
50-321-99-01, 50-321-99-1, 50-366-99-01, 50-366-99-1, NUDOCS 9904150217
Download: ML20205M301 (5)


See also: IR 05000321/1999001

Text

-

'

.

L

April-2, 1999

Southern Nuclear Operating Company, Inc.

I

ATTN: Mr. H. L Sumner, Jr.

Vice President, Hatch Plant

Nuclear Operations

P.O. Box 1295

Birmingham, AL 35201

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-321/99-01 AND 50-366/99-01

l

Dear Mr. Sumner:

l

On March 6,1999, the NRC completed an inspection at your Hatch facility. The enclosed report

presents the results of that inspection.

.

Based on the rru,uits of this inspection, the NRC has determined that one violation of NRC

requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),

consistent with Appendix C of the Enforcement Policy. If you contest the violation or severity

level of the NCV, you should provide a response within 30 days of the date of this inspection

report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document

Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region

ll, and the Director, Office of Enforcement, United States Nuclear Regulatory Commission,

Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by

Pierce H. Skinner)

150023

Pierce H. Skinner, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos.: 50-321 and 50-366

License Nos.: DPR-57 and NPF-5

(

Enclosure: NRC Inspection Report 50-321/99-01

)

and 50-366/99-01

cc w/ encl: (See Page 2)

!

9904150217 990402

PDR

ADOCK 05000321

G

PDR

fol

E

.,

,

SNC

2

cc w/ encl:

. J. D. Woodard

' Executive Vice President

Southern Nuclear Operating Company, Inc.

P. O. Box 1295

Birmingham, AL 35201-1295

,

. P. H. Wells

'

General Manager, Plant Hatch

' Southern Nuclear Operating Company, Inc.-

U. S. Highway 1 North

!

P. O. Box 2010

l

Baxley, GA 31515

D. M. Crowe

,

Manager Licensing - Hatch

l

Southern Nuclear Operating Company, Inc.

.

P. O. Box 1295

'

Birmingham, AL 35201-1295

Ernest L. Blake, Esq.

Shaw, Pittman, Potts and

Trowbridge

2300 N Street, NW

j

Washington, D. C. 20037

Office of Planning and Budget -

Room 610

270 Washington Street, SW

Atlanta, GA 30334

Director .

Department of Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

i

Manager, Radioactive Materials Program

Department of Natural Resources

,

4244 International Parkway

Suite 114 -

Atlanta, GA 30354

,

cc w/ encl cont'd: (See Page 3)

!

.

_-

'

.

SNC

3

cc w/ encl:

- Chairman

Appling County Commissioners

County Courthouse

Baxley. GA 31513

Program Manager

Fossil & Nuclear Operations

Oglethorpe Power Corporation

2100 E. Exchange Place

Tucker, GA 30085-1349

Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker

10th Floor

1299 Pennsylvania Avenue

Washington, D. C. 20004-9500

)

Senior Engineer - Power Supply

Municipal Electric Authority

of Georgia

1470 Riveredge Parkway NW

Atlanta, GA 30328-4684

Distribution w/ encl:

L. Plisco, Ril

P. H. Skinner, Ril

I.. Olshan, NRR

PUBLIC

NRC Resident inspector

U.S. Nuclear Regulatory Commission

11030 Hatch Parkway North

Baxley, GA 31513'

  • SEE PREVIOUS CONCURRENCE

l

VerNt

Ril:DRP

Ril:DRP

RII:DRP

Ril:DRP

Ril:DR5

Rll:DR5

Ril:EIC5

5IGNATURE

NAME

Gvmapp:dka

JTMunday*

JACanady*

TRFredette*

WPKleinsorge'

GRWiseman*

ATBoland*

DATE

4/ /99

4/ /99

4/ 199

4/ /99

4/ /99

4/ /99

4/ /99

COPY?

YES

NO

YE5

NO

YES

No

YES

No

YES

No

YES

NO

YES

No

OFFictAL RECORD COPY

DOCUMENT NAME: G;\\ HATCH \\lR9901.WPD

l

. m

.

-

-

-

t1AR-301999 12:53

tRC HATCH SITE

F.02

,

.

SNC

4

Distnbution w/9 ngl: Cor n 4

'

NRC Resident inspech

U.S. I?oclear Regulatory Commission

11030 Hatch Paikway North

Baxley, GA 31513

l

I

v. . 4

Rn:prw

RR.DRP

UI:urr

RgRF p

RH;urta

RH;uvur

dM

dM

$D

PL".=:

C" =*=

pTMunemy

% IAG =,

v

-

ji_____

verrueirinoege

un.. z--.an

DATE

al lys

algo /pg

3/ g e /3'J

N 31 139

3/ 19 9

st , i5s

al 199

i

(J D)

Tan

NO

YE5

NO

YE5

No

YE.S

NO

YEs

no

wur T s

YE5

NO

YE5

OFFKMAL NECORD COPY - DOCURIENT NAME: LA g-. a;.,512.WPD

TOTAL P.02

. ..

. - _ _ _ _ _ _

,

.

,

SNC

4

Distribution w/ encl: Continued

NRC Resident inspector

s

,

U.S. Nuclear Regulatory Commission

11030 Hatch Parkway North

Baxley, GA 31513

N

):

/ t

UrrLt

Ril;pMP

Rll:DRP

Ril.DRP

Ril.DRP

RiipRy

/

RJi;DR5 ,

fg 7y; org

MNAWRE

,g/

g

/ jyg

Lg[/gg ggg

NAME

CWRapp:dka

JTMunday

JACanady

TRFieJJ-

' p;;;{eCy j' GRWiseman

g )% yg3

,

DATE

3/ /99

3/ /99

3/ 199

3/ /99

[/[3kg99 /

yf99

g /99

GOFY7

YE5

NO

YES

NO

YE5

NO

YES

No

fnrE57/ N0

fTE5 / NO

/ YE5')

NO

OFFICIAL RECORD COPY

DOCUMENT NA' 5: G:\\HATCHilR9901.WPD

'#

/

V

V

m

_ - - _ - _ _ _ _ _ - _