ML20247P557
| ML20247P557 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/13/1989 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| References | |
| NUDOCS 8908040218 | |
| Download: ML20247P557 (2) | |
Text
_ - -____-
',, i
.s f
JUL 131989 Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 Georgia Power Company ATTN: Mr. W. G. Hairston, III Senior V,ce President -
Nuclear Operations-P. O. Box 1295 Birmingham, AL 35201 Gentlemen.
)
SUBJECT:
RII-89-A-0013 The enclosure to' this letter documents information received during discussions I
between Region II personnel and a concerned individual. The NRC has not made an - attempt to ascertain the accuracy of the information supplied by the
' individual. The enclosed concern is provided for your review and so that you can take the appropriate action.
The enclosed information is 'not being placed in the Public Document Room.
Appropriate safeguards must be applied to the enclosed information in view of its unsubstantiated nature in order to avoid an unwarranted invasion of privacy or defamation of character or named individuals.
The. concern identified in the enclosure contains sufficient information for follow-up, and you are requested to initiate a review of this concern and provide us with your findings within 45 days of receipt of this letter.
In order to ensure appropriate protection for the information, please mark the i
letter with your findings as containing "Information Exempt from Disclosure Under 10 CFR 2.790 (a)(6) and (7)." Indicate on the envelope that is is "T0 BE OPENED BY ADDRESSEE ONLY."
If you have any questions regarding this matter, please feel f ree to contact me or Mr. Oscar DeMiranda, Enforcement and Investigations Coordination Staff, at (404) 331-4193.
Sincerely, ORIGINAL SIGNED BY ALAN R. H3DT Alan R. Herdt, Chief Reactor Projects Branch 3 Division of Reactor Projects A 013 (Exempt from Disclosure) l cc w/o enc 1:
(See page 2)
, g 8908040218 890713 I
PDR ADOCK 05000321 1
P PDC
.780 /
l L__________.--.-___
_J
7..
.jc*
j:
- s.
j.
,. v I
Gecrgia Power Company 2
JUL 131989 cc w/o encl:
R. P. Mcdonald, Executive Vice President Nucfear Operations J. T. Beckham, Vice President, Plant Hatch H. C. Nix, General Manager,' Plant Hatch 0, M. Fraser, Site Quality Assurance Manager L. Gucwa, Manager, Nuclear Engineering and Licensing, Plant Hatch S. B._Tipps, Manager of Nuclear Safety and Compliance bec w/o encl:
L. Trocine M. Sinkule A. Herdt L. Reyes M. Ernst NRC Resident inspector State of Georgia bec w/ encl:
- 0. DeMiranda i
1 1
1 RII RII RII RII R11 Rgy RII l
'LTr c ne
+1 n-e AHerdt LTt ode a da
. ins M 1]I/iv/89 J /
89 6/ /89 f>/ g
/89 f/[3/89 Y(
/
_ _ _ _ _ _ _ _