Discusses Util Compliance W/Atws Rule (10CFR50.62).Design Change to Utilize Test Switches to Block Actuation Signal to Alternate Rod Injection Solenoid Valve During Testing Acceptable
ML20248A294
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/01/1989
From: Crocker L
Office of Nuclear Reactor Regulation
To: Hairston W
GEORGIA POWER CO.
References
TAC-59101, TAC-59102, NUDOCS 8908080236
Download: ML20248A294 (4)


Text

_

l' n

% ' * ;.[p a.

a N,

  • /

o UNITED STATES g.

a e.

NUCLEAR REGULATORY COMMISSION n

7; E

WASHINGTON, D. C. 20555 t

[

%,....../

August 1, 1989 Dccket Nos. 50-321 p'

50-366

. Mr. W. G. Hair:i, ton, III Senior Vice President -

Nuclear Operations i

' Georgia Power Comparty i

P.O. Box 1295 Birmirgham, Alabama 35201

Dear Mr. Hairston:

SUBJECT:

' COMPLIANCE WITH ATWS PULE, 10 CFR 50.62, FOR HATCH UNITS 1 AND 2 (TACs 59101 AND 59202)

An NRC letter dated Decester 14, 1988 provided the then current status of the NRC's review of Georgia Power Company's (GPC) conformance to the requirements of the ATWS Rule,10 CFR 50.62, for Hatch Units 1 and 2.. We stated in that letter that the Hstch units were in full compliance with rule requirements for boiling water reactors except'for one open item regarding testability at power of the Alternate Rod Injection (ARI) system. We requested that you document a design modification to the ARI system that would resolve this open issue.

By letter dated July 7,.1989, GPC committed to implement a design change that would utilize test switches to block the actuation signal to the ARI solenoid valve during testing..thereby enabling the ARI actuation relays to be energized.without causing the valves to change state. This design change, in conjunction with an alarm to alert the operator that a test of the system is in progress, would allow testing of the ARI system at power. The changes are to be implemented by the end of.the 1990 ar.d 1991 refueling outages for Units 1 and 2, respectively.

We have reviewed your proposed design change commitment and implementation schedule and find them acceptable. Accordingly, we conclude that these changes in conjunction with the other ATWS modifications, when implemented, will bring the Hatch Nuclear Plant, Units 1 and 2, into full compliance with the ATWS rule, 10 CFR'50.62.

G9080{:0236 890801 gDR nDOCK 05000321 iQ'

\\

PDC j

,e r

'; j.

h.jp. :.

o, t.:

- Mr. ' W. G. Hairston, ~ 111

.2.-

It, 1

1 As noted in our Decenber 14,.1988: letter, the final installation of the ARI -

modifications. including the' ARI function. time will be subject to a post-implementation revfew. Otherwise, we consider your actions in reponse to

- 10 CFR 50.62. tc be complete.

Please call me if you nave any questions.

1 Sincerely,

- 3 M

b Lawrence P. Crocker, Project Manager '

l Project Directorate II-3 o

Division of Reactor Projects-1/II Office of Nuclear Reactor Regulation cc: See next page s

I

^

"Q ?.

(~

t

.\\

,e,,

,k.

>t

't.

w q

'F J

I f

g m) t. #.,.

1 #. 3 1

.e a,- c '

'+

.. jan

,, L 4

t s

l lMr.W.G."Hairston,.:-III

]p;.' s

-t 4 1 lh,

.. kYY ' '

~

ji modifications' including the ARI' function time will betsubject to a AsL noted in our. December;14,1988.letteri the final. installation ~n' of. the"ARI b

post-implementation review.. Otherwise, we consider your actions tin reponse to 10 CFR 50.62 to be complete.

Please call pe if you. have any questient,.

1 l

Sincerely,

'F

.jgt 3

,O Lawrence P. Crocker; Project Manager f

Project Directorate II-3 Division of Reactor Projects-1/II.

p Office of Nuclear Reactor. Regulation F

cc:1 See next page..

' DISTRIBUTION iMEM"7TW).

NRC PDR Local PDR ' '

'PDil-3 Reading.

S..Varga-14-E-4 G. Laines 14-H-3 L

D.-Matthews 14-H-25 M.- Rood 14-H-25 L.:Crocker 14-H OGC (For' inform. Only) 15-B-18 E. Jordan

'MriBB-3302 B. Grimes.

9-A-2' S. Newberry 7-E-12 ACRS (10)

P-315 t

[ Hatch Plant File]

O d

er DI s'

'7 E//89 747/c9 7/3r /89 1 /1 / 89

l

  • y..,,.

Mr. W. G. Hairston, III Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 cc:

G. F. Trowbridge, Esq.

Nr. R. P. Mcdonald 1

Shaw, Pittman, Potts and Trowbridge Executive Vice President -

1 2300 N Street, N. W.

Nuclear Operations Washington, D.C.

20037 Georgia Power Company P.O. Box 1295 Mr. L. T. Gucwa Birmingham, Alabama 35201 Engineering Departrent

]

Georgia Power Compe Mr. Alan R. Herdt, Chief j

P. O. Box 1295 Project Branch #3 Birmingham, Alabama 35201 U.S. Nuclear Regulatory Comission 101 Marietta Street, NW, Suite 2900 Maiear Safety and Compliance Manager Atlanta, Georgia 30323 Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.

P. O. Box 129ti Birmingham, Alabama 35201 Resident Inspector U.S. Euclear Regulatory Comission Route 1, Box 725 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.

Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Director Environmental Protection Division Department of Natural Resources 205 Butler Street, S.E.,

Suite 1252 Atlanto, Georgia 30334 Choirman Appling County Commissioners County Courthouse Baxley, Georgia 31513

_ - _ _ _ - _ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.