ML20058E849
| ML20058E849 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/23/1990 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20058E852 | List: |
| References | |
| NUDOCS 9011070375 | |
| Download: ML20058E849 (3) | |
See also: IR 05000321/1990019
Text
o
.
,,,
'3
1G ht
.
007 e a iggo
Docket Nos. 50-321, 50-366
.
o
Georgia Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT.NOS. 50-321/90-19 AND 50-366/90-19
This refers to the Nuclear Regulatory Consnission (NRC) inspection conducted by
q
E. D. Testa on September 25-28, 1990.
The inspection included a review of
activities authorized for your Hatch facility,
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report,
Areas examined during the inspection are identified in' the report.
Within
_
s
these areas, the inspection' consisted of selective examinations of procedures
j
'
- and representative records, interviews with personnel, and- observation of
activities in progress.
<
..
Q
Within the -scope .of ~ the inspection, no violations .or deviations were
identified.
4
Your. attention is directed to the exercise weakness identified in Paragraph 6
of' the . enclosed Inspection Report
. As required by 10 CFR 50, Appendix - E,
!
Section IV F.
any weaknesses that are identified shall be corrected.
]
. Accordingly, please advise us within 45 days of the date of this' letter, the
'
.
corrective action you have taken, or plan to date showing the estimated date
of completion with regards to exercise weakness.
I'n accordance with 10 CFR 2.790(a), ' copy of this letter and its enclosure
!
"will be placed in the NRC Public Document Room.
j
!
'
-
.
l
!
!
!
', O h
j
i
!
1:
i
!
3
'
9011070375 901023
ADOCK 05000321
(
G
PNV
g
4
0
-' '
.
.
l
Georgia Power Company
2
Should you have any questions concerning this letter, please contact us.
4
Sincerely.
Ott0NAl'$lGNto W
DOUGL A S 4 dN ' P!<
Douglas M. Collins, Chief
Radiological Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure:
NRC Inspection Report
cc w/ encl:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
l
Georgia Power Company
l
P. O. Box 1295
Birmingham, AL 35201
J. T.'Beckham
,
Vice President. Plant Hatch
Georgia Power Company
P.50. Box 1295
'
Birmingham, AL 35201
11. C . Ni x .
General Manager, Plant Hatch
Route 1, Box 439
Baxley,-GAL 31513
S. J. Bethay
Manager Licensing - Hatch
Georgia: Power Company
,
P. O. Box 1295
Birmingham, AL 35201
Ernest L..Blake, Esquire
Shaw,.Pittman, Potts and
Trowbridge
2300 N Street, NW
Washington, D. C.
20037
.
(ccw/ encl:
Cont'd on page 3)
,
7
,
p. /
'."'
'
?
(>
.,
r
,
,
..
,
..
"' g
,
Georgia Power Company
3-
-
.
-
(cc w/ encl: cont'd)
'
Charles H. Badger:L
m
'
Office of. Planning and Budget
Room 610:'
-270 Washington Street, SW
,'
Atlanta,:GA 30334
.
y
' Lonice Barrett, Comissioner
'
L
Department of Natural-Resources
(
205 Butler Street' SE, Suite 1252
.
Atlanta, GA- 30334
'
1
'
Thomas Hill. Manager
'
Radioactive Materiais i,ogram
'
Department of; Natural Resources
i
y
878 Peachtree'St., NE., Room 600
i
-
,
i
LAt1anta, GA- 30309
.i
'
' Chairman .
.
Appling County:Comissioners
- County .. Courthouse
.
-
1Baxley. GAE 31513t
'
'
'
i
p
.
. State?ofGeorgiai
,
!,
'
e
- bec w/enci:
l
L'. P.-Crocker, NRR
'
'
'A.'R;-Herdt, RII
4
?
j,g
JK. E Brockman. RII.
'
rJL C; Heard, FEMA, RIVE
LR. A. Erickson, NRR
TDocument' Control Desk
.
A:
NRC-Resident Inspector l
'
4
-
U;S. '. Nuclear.-Regulatory Comission
4 -
,
,
- Route
1~, Box;725'
,
,
4
LBaxley, IGA 31513L
-i
(
! HushiS. TJordan,l Execut.ive Secretary .
.
'C.
Georgia L Public - Service : Commi s sion --
'
244; Washington: Street' SWL
<
' Atlanta, GA- 30334-'
!
!
'~
'
,
.
'
I
JRII:DRSS
-RII:DRSS'
"RII:DRP-
f^
24.C
.
..
'
.ETesta
WRanhin
KBrockman
,'
'
10//6790
110/p/90-
104490.
=-
,
I
- +-
,