Insp Repts 50-321/86-31 & 50-366/86-31 on 861006-10.No Violations Noted.Major Areas Inspected:Effectiveness of Licensed & non-licensed Training Programs & Items of Noncompliance Identified in 850205-07 Insp
ML20215F597
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/11/1986
From: Lange D, Oliveira W, Wilson B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20215F589 List:
References
50-321-86-31, 50-366-86-31, NUDOCS 8612230465
Download: ML20215F597 (7)


Text

r.

  • UNITED $TATES
  • [ Sn MQ D

NUCLEAR REGULATORY COMMisslON o

'

y REGION il '

n g

j 101 MARIETTA STREET, N W,

's ATLANTA, GEORGIA 30323 s.,...../

Report Nos.: 50-321/86-31 and 50-366/86-31 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket Nos.: 50-321 and 50-366 License Nos.: DPR-57 and NPF-5 Facility Name: Hatch 1 and 2 Inspection Conducted: October 6-10, 1986 Inspectors:

A

/w

/2 ////fl

.

.

D. Lange, Lead Reactor EngW eer Examine 7,

Datd 5fgnec (Region I)

AG. hk A.

/2/u /rt W. Oliveir3, Reactor Eggin'eer, Date 5fgned (Region I)

Approved by:

/d

/7 /

B. Wilson, Chief' "

//

DdtfSigned Operational Programs Section

Division of Reactor Safety SUMMARY

,

Scope: This special, unannounced inspection entailed reviewing the effectiveness of licensed and non-licensed training programs.

Results:

Within the areas inspected, no violations were identified. Concurrent with this inspection a review of items of non-compliance, identified during the inspection conducted February 5-7, 1985, was performed (Inspection Report 321, 366/85-07).

Items closed are identified in the details of this report.

8612230465 061217 PDR ADOCK 05000321 PDR

-.

- - -

-

- -

-

-

- -

-

.

.

'

.

I.

REPORT DETAILS L

1.

Licensee Employees Contacted

  • L. Sumner, Manager of Operations
  • H. Nix, Plant Manager
  • A. Frazer, Acting QA Site Manager
  • R. K. Moxley, Acting QA Audit Group Supervisor
  • R. s. Grantham, Operations Supervisor of Training
  • D. F. Moore, Nuclear Training Coordinator
  • T. L. Elton, Plant Engineering Supervisor
  • E. C. Stewart, Field Representative Quality Assurance
  • R. D. Baker, Nuclear Licensing Manager
  • R. Ott, Supervisor HP Chem. Training
  • D. Bennett, Supervisor Program Developnent Other licensee employees contacted included operators, senior ope ators, technicians, mechanics, engineers, and training staff personnel.

U. S. Nuclear Regulatory Commission

  • P. Holmes-Ray, Senior Resident Inspector
  • Attended exit interview 2.

Exit Interview The inspection secpe and findings were sunnarized on October 10, 1986, with those persons indicated in paragraph I above.

The licensee acknowledged the inspection findings with no dissenting comments.

The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during this inspection.

3.

Licensee Action on Previous Identified Inspection Findings; Inspection Report No. 321/366 85-07 (Closed) Unresolved item 321, 366/85-07-02:

Lack of establishing an adequate training program for I&C technicians, as necessary to assist with core damage conditions (NUREG 0737 Item IIB.4).

The mitigation of core damage training program has been established and it is adequately described in I&C technicicn training program.

Continuing training for I&C technicians will also include mitigation of core damage training. This item will be closed.

(Closed) Inspector followup item 321, 366/85-07-05:

Lack of a formal on-the-job (0JT) training program for maintenance personnel.

The training has been developed and is adequately described in the nuclear mechanical training program. This item will be closed.

.

,

-

,

.-

-.

, - - - - - -

-

..,

n.

.-

,

.

-

.

.

-

-

..-

,

,,

t,, 11 x

.

-

s

,

,,

,

,N

,

,

. )

,

,

2-

.,

p (Closed)' Inspector followup item 321/366, 85-07-01.~ This item identified that there was,no formal training program established for support engineers.

The ins ~pector. reviewed the operations training program procedure, document

'

-

No. 72TR-TRN-001-0s, Rev. 2 dated July 24', 1986, which outlines a formal

'

eleven,(11) weekj structured training program for ; plant staff engineers.

This procedure appeared to establish an acceptable program to provide an

.

engineer.with a. broad background in basic theory, _ systems, and plant

-

operations. 'This engineering staff and manager training program is INP0

'

accredited, and' forty-five percent of the engineers have-received the training. 'The inspector interviewed five engineers.

The engineers that

.had received the;INP,0;adcredited training considered the training effective and th'at > f t had enhanced their technical skilis and knowledge.

They would. prefer their' continuing training address more plant specific

'

equipment vice general,, systems.

The training records.of the engineers

,

'

were complete, current and in compliance with Jrocedure 71TR-TRN-001-0S and ANSI N45.2.9

,1974.

Six lesson plans were reviewed and were found

!

to follow INP0 guidelines and were incompliance with the licensee's engineering training' program. This item is considered closed.

(Closed) Violation 321/366,85-07-03.. This -finding identified that the Plant Manager had not received training in mitigation of core damage as required by NUREG-0737..The inspector reviewed the training records and verified that training had been. completed on June 14, 1985. This item is considered

"

'

'

closed.;

,

\\t

,

'

(Closed) Inspector followup item 331/366, 85-07-04. This finding identified

'

that no procedure had been developed for controlling implementation of the STA training program as required by NUREG 0737. The inspector verified that the STA training program was developed and being implemented by

,

procedure 72TR-TRN-001-0S Rev. 2, July'24, 1986.

This item is considered L

closed.

,

(Closed) Violation 321/366, 85-07-06.

This finding identified inaccurate i

and/or incomplete disclosure information on License Applications.

The inspector verified that this problem had been addressed.

Nuclear operation t

instruction, NOI-5-108, dated August 26, 1986, outlines the responsibilities and control of NRC slicense applications.

Inc.erviews were conducted with those individuals responsible for the implementation of these operations

instructionstto verify the completeness of the review process. This item is considered closed.

U l

(Closed) Violattori 321/366, 85-07-07. This finding identified the lack of a controlling procedure for maintaining training records.

The inspector reviewed procedure 71TR-TRN-001-05, dated September 19, 1986. The procedure describes the method for collecting and disposition of training records.

'

The inspector also verified that this procedure was being implemented. This

,

item is considered closed.

'

,

f 4V g

. - -,,. - -, -,

....,

. _, -.-_ -,

,.-,.-c

, - - -

n-.. _,, _ - -. -...

- - -

-,.,-._,,n.-.,._n.,..m

--e,_

,.,-, -

-

-

.

(Closed) Inspector followup item 321/366, 85-07-08. This finding identified a need for an evaluation of the success of the accelerated requalifica-tion training program.

The inspector verified that the accelerated requalification training had been conducted. To determine the effectiveness of the training the inspector interviewed operators and senior operators.

Feedback from the licensed personnel indicated that the training was satisfactory.

A confirmation of concurrence letter issued by the NRC on September 18, 1986, indicated that the accelerated requalification training, based on NRC administered examination results, substantially improved the knowledge and performance level of licensed personnel.

This item is considered closed.

(Closed) Inspector followup item 321/366,85-07-09. This finding identified a need to re-establish an NRC approved requalification program.

The inspector reviewed.the revised requalification training program and verified that a safety evaluation had been completed and NRC approval

'i granted.

(SER, April 22, 1986, To J. Beckham from D. Muller.)

This item is considered closed.

4.

Non-Licensed Operator Training The non-licensed operator (NLO) training program was established to the requirements in administrative procedure 70AC-TRN-001-0S and is outlined in the training procedure 72TR-TRN-001-0S.

The NL0 training program has been INP0 accredited.

The inspector observed the shif t turnovers of NL0s and other activities performed by NL0s including:

the preparation and tagging of the Unit 2 CRD system's hydraulic control units in accordance with procedure 304G-DPS-001-0S and P&ID H 26006 and 007; and the start up and operation of diesel generator (DG) 2R4% S001C. The activities were conducted in accordance with the approved procaires and NL0s appeared knowledgeable in the requirements of the procedures and Technical Specifications.

The tagging of the 137 hydraulic control units was a team effort and appeared well coordinated.

The preparation phase, e.g. assignments, coordination, review of the P& ids, marking of the tags followed by the tagging and verification, and the recording and reporting activities, indicated that the NL0s were well trained and qualified.

The inspector reviewed over 15 NLO training records.

The records were complete and current and in compliance training procedure 71TR-TRN-001-0S and ANSI N45.2.9 - 1974.

The licensee is automating (computerizing) their training records maintenance and retrieval system making the records more readily accessible for review and maintaining personnel qualifications.

5.

Non-Licensed Staff Training (41400)

The purpose of this inspection was to assess the effectiveness of the

'

licensee's non-licensed staff training.

As a representative sample, the inspector selected the training pro for non-licensed operators (NL0s), instrument and control (I&C) gramstechnicians, electricians, mechanics, engineers, and health physics technicians (HPs).

The effectiveness was determined by:

reviewing the activities performed by the above personnel at

-.

.

.

.

. -.

..

-

.

.. -

er

-

.

,

the job site; interviewing the personnel to determine if they were adequ-ately trained, qualified and certified to perform these activities; and determining what continued training they were receiving to n'aintain or upgrade their proficiency.

The results of the review and interviews indicated the non-licensed staff training to be effective and adequate.

The non-licensed staff personnel generally gave supervision and training high marks in being responsive and supportive 'of. the training programs.

.

This is also ' demonstrated by the fact that seven of the, ten training programs.have been INPO accredited.

The remaining three. programs, electrical, mechanical, and I&C technician training were under accreditation evaluation by INP0.. Supervision and management however, were viewed by the personnel as being reactive rather than anticipating the training needs of their personnel.

The inspectors verified that the electrical, mechanical and I&C technician training programs were in compliance with administrative procedure 70AC-TRN-001-0S.

The union representing each craft has two members on the training certification and review committee.

One representative of the

mechanics also served as a subject matter expert (SME) for developing the

nuclear mechanic training program.

The three maintenance training programs were undergoing INP0 evaluation for accreditation.

,

The inspectors observed the following activities to determine training effectiveness:

,

I A practice emergency response drill where electricians were observed

-

'

simulating a scram recovery with jumpers to operate the scram discharge volume vent in accordance with technical support Center (TSC) message no. 4, and reference drawing 11-27614 revision 11.

A health physics

'

technician accompanied the electricians.

.

-

Electricians performing maintenance on diesel generator 2R43-S001C as required by maintenance work orders (MW0s) 2-86-3226 and 2-86-5072

for the standby lube oil and prelube oil pump motors. The maintenance I

was performed in accordance with procedure 525SP-100386-IE-25, L

revision 1.

A mechanic performing inspection of diesel generator 2R43-S001C in l

-

I accordance with preventive maintenance procedure 52PM-R43-014-05.

--

I&C technicians performing semiannual calibration of the logarithmic radiation monitor in accordance with procedure 57CP-D11-001-1.

I

-

An I&C technician performing (RPT) initiation logic flow transmitters a time response test surveillance of I

the recirculating pump trip and motor generator (MG) set breakers in accordance with procedure 57.SV-C71-006-1.

I

!

L

.

. _

.

.

-

.

The activities observed indicated that the training for mechanics, I&C technicians, and electricians was adequate and effective.

The maintenance personnel and several of their supervisors were interviewed.

The personnel appeared knowledgeable of the requirements in the procedures and considered much of their formal training to be job related and effectively presented.

Supervision was pleased with the improvements in the formal training and supported the INP0 concept of training.

The training records of twenty maintenance personnel were reviewed.

The records provided adequate qualification information for the pers'onnel performing the activities observed.

Future training records will also be automated (computerized) for the ready access and assurance that the qualifications of the maintenance personnel are current.

6.

Health Physics The inspector observed and interviewed two health physics technicians (HPs).

One, a contractor, was participating in the tagging of the CRD system's hydraulic control units.

He continually surveyed the area the NL0s were working in and advised them not to spend any more time than was necessary. The other HP was accompanying the electricians during the practice emergency response drill.

The HPs appeared well versed in the ALARA requirements and their responsibilities necessary to support the plant staff.

The inspector reviewed the training that HPs received prior to participation in fire drills.

They received general employee training (GET) plus additional classroom training, e.g.,

taking samples, etc, but did not

.

receive fire fighting training commensurate with their duties. The licensee committed to review the training of all ancillary personnel participating in fire drills.

The review and the implementation of the necessary corrective actions will be an inspector followup item (50-321, 366/86-31-01).

The training record of one HP technician involved in the practice amergency response drill was complete, current and in compliance with procedure 71TR-TRN-001-0S and ANSI N45.2.9 - 1974.

7.

General Employee Training The personnel interviewed considered their general employee training (GET)

to be adequate and job related.

The contractor HP, and the contractor I&C technician involved in the practice emergency response drill, thought the GET was better than that of other plants where they had been employed. The training records reviewed contained complete and current GET training information.

Quality Assurance (QA) audit report no. LP,-QAM-002-0186 issued on January 2, 1986, was reviewed and found to be comprehensive.

The responses to the audit were timely, and all corrective actions have been completed.

.

..-.

-

-

---

.=

-

-

.

-

.

.8.

Licensed Operator and Senior Operator Training-(41701)

'

The licensed operator training program is outlined in the training procedure 72TR-TRN-002-0S, and has received INP0 accreditation.

To evaluate the

.

effectiveness of the program, the inspector attended training lectures, observed simulator training, and interviewed licensed' operators and senior operators.

The inspector also conducted interviews with training super-visors and instructors regarding the progress of program development towards a practical performance based training approach. The inspector reviewed six operator and six senior operator training records.

The records were complete and in compliance with training procedure 71TR-TRN-001-0S and ANSI N45.2.9 - 1974. The inspector reviewed the segmented examination given to date, and the results of the annual diagnostic examination. The inspector had one concern resulting from the review of the diagnostic examination given. The training department had not interfaced with the operations department to analyze the results of the diagnostic exam to determine if re-training or additional training was required.

At least two of the 14 categories on the annual diagnostic exam had indicated significant knowledge deficiencies. The inspector discussed this concern with the training department personnel, and the concern was re-emphasized at the exit meeting. Training procedure 72TR-TRN-002-0S, 7.4.1.7 outlines the requirement for analyzing the results of the annual diagnostic examination. -Tracking and implementation of this item will be followed through inspector followup item-(321/366, 86-31-02.)

With the exception of the inadequate criteria established for timely remedial action to correct knowledge deficiencies identified -during the

,

annual diagnostic examination, the licensed operator training program appeared significantly improved over the past two years.

The inspector encouraged continued practical application of classroom lecture material and maximizing the performance based training conducted on the Hatch simulator.

.