ML20207E756

From kanterella
Jump to navigation Jump to search

Informs of Completion of Review & Evaluation of Info Provided by Southern Nuclear Operating Co by Ltr Dtd 980608, Proposing Changes to Third 10-Yr Interval ISI Program Plan Requests for Relief RR-4 & R-6.Requests Acceptable
ML20207E756
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/03/1999
From: Emch R
NRC (Affiliation Not Assigned)
To: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20207E760 List:
References
TAC-MA2120, TAC-MA2121, NUDOCS 9906070133
Download: ML20207E756 (3)


Text

r_ .

[.;t[' .

> June 3, .1999 "

. Mr. H. L. Sumner, Jr.- - '

Vice President- Nuclear . .

Hatch Project : _

Southem Nuclear Operatingj Company, Inc. [ '

/

Post Office Box 1295 - ~

Birmingham, Alabama 35201-1295( ,

SUBJECT:

EDWIN i. H'ATCH NOCLE R PLANT, UNITS 1 AND 2 RE: THIRD 10-YEAR-

' INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUEST FOR RELIEF

- NOS. RR-4, REV.'2 AND RR-6,: REV 2 (TAC NOS. MA2120 AND MA2121)

Dear Mr. Sumner:

p The staff, with technical assistance from its contractor, Idaho National Engineering and  ;

Environmental Laboratory (INEEL), has reviewed and evaluated the information provided by I Southern Nuclear Operating Company (licensee) by letter dated June 8,1998, proposing j changes to _the Third 10-Year Interval inservice Inspection Program Plan Requests for Relief

. Nos. RR-4 and R-6. The staff found both of the licensee's requests acceptable.

The staffs evaluation and conclusions are contained in Enclosure 1. Enclosure 2 is'the INEEL iTechnical Evaluation Report.

Sincerely, Original _ signed by:

Richard L. Emch, Jr., Section Chief, Section 1 l/

Project Directorate ll I Division of Ucensing Project Management-Office of Nuclear Reactor Regulation Docket Nos:L 50-321 and 50-366 I Enclo'sures:' As stated '

h 5 {Lg ~

cc w/encls: See next page l Distribution: e-mail RCN - SE only .. ' P. Skinner, Rll'

,emahmeFNst OGC-PUBLIC G. Hill (4)

PD 11-1 Rdg. ACRS J. Zwolinski/S. Black - M. Tschiltz, EDO .

DOCUMENT NAME: G:\ HATCH \RR2120.WPD . .

  • See previous concurrence To receive a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy with attachment / enclosure N = No c?py-OFFICE Mil-1/PM PDil-1/LA L E OGC" PDil-1/SC PDll/D, NAME Olshan:cn ' CHawes 6/nN REmch bk ,

DATE, l.c / 'Z /99 /c / dL /99 , 05/14/99 [r)/ b 99 b/ /99

' " ' OFFICIAL RECORD COPY 9906070133 990603 PDR ADOCK 0S000321 0 PDR g '

c i

.v -

f#""'%q

.p* t UNITED STATESi

[ NUCLEAR REGULATORY COMMISSION 3, ,

g WASHINGTON, D.C. 20565 0001

' '%-6.,+#o# June 3, 1999

' Mr. H. L Sumner, Jr.

LVice President- Nuclear Hatch Project j L Southern Nuclear Operating - J Company, Inc.j Post Office Box 1295

Birmingham, Alabama 35201-1295 -

c

SUBJECT:

EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2 RE: THIRD 10-YEAR

.INTERVALINSERVICE INSPECTION PROGRAM PLAN REQUEST FOR RELIEF NOS. RR-4, REV. 2 AND RR-6, REV 2 (TAC NOS. MA2120 AND MA2121)

'Dsar Mr. Sumner! l i

" The staff, with technical assistance from its contractor, Idaho National Engineering and i

Environmental Laboratory (INEEL), has reviewed and evaluated the information provided by Southem Nuclear Operating Company (licensee) by letter dated June 8,1998, proposing changes to the Third 10-Year Interval inservice inspection Program Plan Requests for Relief Nos
RR-4 'and R-6. The staff found both of the licensee's requests acceptable.

The staffs evaluation and conclusions are contained in Enclosure 1. Enclosure 2 is the INEEL

- Technical Evaluation Report.

i Sincerely,' j j

/  !

Richard L. Emch, Jr., Section Chief, Section 1 -

Project Directorate 11 Division of Licensing Project Management - I Office of Nuclear Reactor Regulation Docket Nos:- 50-321 and 50-366- ,

Enclosures:

'As stated - l l cc w/encisi See next page -

...'(.

- n l

'-% . 4  ; '

1  %

m

~ Edwin I. Hatch Nuclear Plant l^

l

. cc: .. .. .

i Mr. Ernest L. Blake, Jr. Charles A. Patrizia, Esquire .

l Shaw, Pittman, Potts . Paul, Hastings, Janofsky & Walker l and Trowbridge - 10th Floor l: 2300 N Street, NW.- 1299 Pennsylvania Avenue Washington, DC 20037 Washington, DC 20004-9500 L Mr.- D. M. Crowe - ,

Chairman .

, Manager, Licensing - Appling County Commissioners Southern Nuclear Operating 1 County Courthouse Company, Inc. Baxley, Georgia 31513 P. O. Box 1295 Birmingham,- Alabama 35201-1295 Mr. J. D. Woodard Executive Vice President j Resident inspector

. Southern Nuclear Operating Plant Hatch .

Company, Inc.

.11030 Hatch Parkway N. P. O. Box 1295 L Baxley, Georgia 31531- - Birmingham, Alabama 35201-1295 S I' Mr. Charles H. Badgeri .

Mr. P. W. Wells

. Office of Planning and Budget J . General Manager, Edwin 1. Hatch Room 610 : Nuclear Plant l 270 Washington Street, SW. Southern Nuclear Operating

- Atlanta, Georgia 30334 Company, Inc.

U.S. Highway 1 North .

Harold Reheis, Director P. O. Box 2010  !

Department of Natural Resources - Baxley, Georgia 31515 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 - Mr. R. D. Barker Program Manager Steven M. Jackson Fossil & Nuclear Operations

. Senior Engineer - Power Supply _

Oglethorpe Power Corporation

. Municipal Electric Authority. 2100 East Exchange Place of Georgia P. O. Box 1349

.1470 Riveredge Parkway, NW-- Tucker, Georgia 30085-1349

. Atlanta, Georgia 30328-4684 1-i L

l

l. 1 L

. .