ML20154L449
| ML20154L449 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/14/1998 |
| From: | Olshan L NRC (Affiliation Not Assigned) |
| To: | Sumner H SOUTHERN NUCLEAR OPERATING CO. |
| References | |
| RTR-REGGD-01.143, RTR-REGGD-1.143 TAC-M99287, TAC-M99288, NUDOCS 9810190302 | |
| Download: ML20154L449 (3) | |
Text
'
October 14, 1998 Mr. H. L. Sumner, Jr.
Vice Pr;sid:nt - Nucle:r Hatch Project -
Southem Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
NOTIFICATION OF DISCREPANCY IN SAFETY EVALUATION FOR. -
IMPROVED TECHNICAL SPECIFICATIONS (ITS) RELATIVE TO RELOCATION OF INFORMATION - EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M99287 AND M99288)
Dear Mr. Sumner:
In your letter dated July 14,1997, you stated that the Process Control Program (PCP) for solid radioactive waste had been relocated to the PCP manual. You had previously committed to relocate the PCP in the Quality Assurance (QA) Program Requirements section of the Final Safety Analysis Report. In our letter dated September 9,1998, we stated that relocation of the PCP to the PCP manual was not acceptable, and that the PCP programmatic controls described in the enclosure to your July 14,1997, letter should be relocated to the QA program description.
We have reconsidered your relocation of the PCP to the PCP manual against the guidance in Regulatory Guide 1.143 and believe that the level of QA proposed for your QA program will provide adequate oversight and control. Therefore, we conclude that locating of the PCP in the PCP manualis acceptable.
Sincerely, ORIGINAL SIGNED BY:
Leonard N. Olshan, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects -l/II Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page I\\ o Distributiom Docket File LPlisco, Ril PUBLIC PSkinner, Rll
( Dk g\\
PD 11-2 Rdg.
OGC JZwolinski ACRS ACRS To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy *See previous concurrence OFFICE PM:PDil-2*
l LA:PCll-2* l D:F7bik l NAME LOlshan:cn LBerry HBerkW 3
DATE 10/1/98 9/28/98
/ /N98
/ /98
/ /98
/ /97 DOCUMENT NAME: G:\\ HATCH \\PCP.LTR OFFICIAL RECORD COPY 9810190302 981014 39 3
DR ADOCK 050003 1
_,.,, a.a i
u
s 5%
g 4
UNITED STATES j
g j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066M001
\\*****/
October 14, 1998 Mr. H. L. Sumner, Jr.
Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
NOTIFICATION OF DISCREPANCY IN SAFETY EVALUATION FOR IMPROVED TECHNICAL SPECIFICATIONS (ITS) RELATIVE TO RELOCATION OF INFORMATION - EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M99287 AND M99288)
Dear Mr. Sumner:
In your letter dated July 14,1997, you stated that the Process Control Program (PCP) for solid radioactive waste had been relocated to the PCP manual. You had previously committed to relocate the PCP in the Quality Assurance (QA) Program Requirements section of the Final Safety Analysis Report. In our letter dated September 9,1998, we stated that relocation of the PCP to the PCP manual was not acceptable, and that the PCP programmatic controls described in the enclosure to your July 14,1997, letter should be relocated to the QA program description.
We have reconsidered your relocation of the PCP to the PCP manual against the guidance in Regulatory Guide 1.143 and believe that the level of QA proposed for your QA program will provide adequate oversight and control. Therefore, we conclude that locating of the PCP in the PCP manualis acceptable.
Sincerely, h
)4L Leonard N. Olshan, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - 1/ll Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page
o.. ". y.
-l l
7 i
f Edwin I. Hatch. Nuclear Plant cc:
Mr. Emest L. Blake, Jr.
Charles A. Patrizia, Esquire Shaw, Pittman, Potts Paul, Hastings, Janofsky & Walker
{
and Trowbndge 10th Floor 2300 N Street, NW.
1299 Pennsylvania Avenue i
Washington, DC 20037 Washington, DC 20004-9500 Mr. D. M. Crowe Chairman Manager, Licensing Appling County Commissioners Southem Nuclear Operating County Courthouse l
Company, Inc.
Baxley, Georgia 31513 P. O. Box 1295 i
Birmingham, Alabama 35201-1295 Mr. J. D. Woodard Executive Vice President Resident inspector Southem Nuclear Operating Plant Hatch Company, Inc.
11030 Hatch Parkway N.
P. O. Box 1295 Baxley, Georgia 31531 Birmingham, Alabama 35201-1295 Regional Administrator, Region 11 Mr. P. W. Wells U.S. Nuclear Regulatory Commission General Manager, Edwin I. Hatch Atlanta Federal Center Nuclear Plant 61 Forsyth Street, SW, Suite 23TB5 Southem Nuclear Operating Atlanta, Georgia 30303 Company, Inc.
U.S. Highway 1 North I
l Mr. Charles H. Badger P. O. Box 2010 Office of Planning and Budget Baxley, Georgia 31515 Room 610 270 Washington Street, SW.
Mr. R. D. Barker
' Atlanta, Georgia 30334 Program Manager Fossil & Nuclear Operations Harold Reheis, Director Oglethorpe Power Corporation Department of Natural Resources 2100 East Exchange Place 205 Butler Street, SE., Suite 1252 P. O. Box 1349 Atlanta, Georgia 30334 Tucker, Georgia 30085-1349 Steven M. Jackson
~ Senior Engineer-Power Supply Municipal Electric Authority of Georgia F
1470 Riveredge Parkway, NW Atlanta, Georgia 30328-4684 i
r
,