Forwards Insp Repts 50-321/89-14 & 50-366/89-14 on 890717-20.No Violations or Deviations Noted
ML20246A662
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/08/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20246A666 List:
References
NUDOCS 8908230102
Download: ML20246A662 (2)


See also: IR 05000321/1989014

Text

, _ mm -

- - - - .-- - - - - - -

- _ _

&

,

'

  1. ll .* August 8,31989

&, v. . .,

j'.,

.

'

Ih

li

..

l. $.

-Docket Nos. 50-321,T50-366

License Nos.-DPR-57, NPF-5

, ,

Georgia Power Company.

-ATTN: 1Mr; W; G. Hairston, III

'

. Senior.Vice President -

. . .

Nuclear' Operations

P. O. Box 1295-

- ' Birmingham, AL -35201

v ,

LGentlemen:

. SUBJECT: NRC INSPECTION REPORT NOS. 50-321/89-14 AND 50-366/89-14

This ' refers' to 'the~ Nuclear Regulatory Comrtission (NRC) inspection conducted

by. J. L. Coley on July 17-20, 1989. The inspection included 'a' review of

activities authorized for your Hatch. facility. At the: conclusion of the

' inspection, the findings were discussed with those.' members of your staff-

identified in the. enclosed Inspection Report

- Areas. examined duringl the inspection are identified Lin the report. Within

' these areas, the_ inspection consisted of selective examinations.'of procedures'

and representative records, interviews' with personnel, 'and observation of

-activities in progress.

Within the scope of - the -inspection, no violations or deviations were

identified.

In accordance with- Section 2.790 of the NRC's " Rules 'of Practice," Part 2,

. Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning.this letter, please contact us.

Sincerely,

original signed by

Caudie A.'Julian

Caudie A. Julian, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection' Report

cc.w/ encl: (See page 2)

h[

a

$NN [ gli

.

ZEol

__

, ,

-

August 8, 1989

L .

o ,.

'

Georgia Power Company 2

l cc w/ enc 1:

'R. P. Mcdonald, Executive Vice

President, Nuclear Operations

J.~ T. Beckham, Vice President

Plant Hatch

H. C. Nix, Generel Manager

Plant Hatch

0. M. Fraser, Site Quality

Assurance Manager

~J. Heidt, Manager, Nuclear

Engineering and Licensing

Plant Hatch

S. B. Tipps, Manager of Nuclear

Safety and Compliance

State of Georgia

bec w/ enc 1:

L. P. Crocker, NRR

M. V. Sinkule, RII

NRC Resident Inspector

Document Control Desk

J. Coley

J. Blake

J. Rogge

RII DRS RI RII: t

J oley:er JJBlake  % A A'ge ,n f

07/3(/89 Og/J/89 Og/ /89