ML20247C928

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-321/OL-89-01 Administered on 890612-16.Concerns Raised Re pre-exam Review Ineffective in Ensuring site-specific Exam Validity & Operator Generic Weaknesses
ML20247C928
Person / Time
Site: Hatch 
Issue date: 09/06/1989
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20247C933 List:
References
NUDOCS 8909140130
Download: ML20247C928 (2)


Text

-

.a

..g

. s.1

- q.y September 6, 1989 Georgia Power Company LATTN: Mr.. W.: G. Hairston,.III Senior Vice: President-

. Nuclear 0perations:

y 40; Inverness Center Parkway

.P. 0.; Box 1295-Birmingham, AL 35201' Gentlemen:.

SUBJECT:

EXAMINATION. REPORT'. 50-321/0L-89-01' On June 12.

16, 1989, the;NRC administered examinations to employees of-your

. company who had; applied for licenses. to operate your E. I. Hatch facility. ' At

' the' conclusion of :the. examination, the examination questions and.~ preliminary findings were discussed with those members of your. staff identified in the enclosed report.

1 Your attentionJis invited to tw'o specific areas of concern. -As detailed.in

'the.Examinatic,n. Report. your pre-examination review was ineffective in -

ensuring site-specific examination validity and, the operator generic weak-

.nesses that were noted during the operating. examinations.

Further management

. attention istneeded to eliminate'these concerns, r

In 'accordance with 10.CFR 2.790 of the Commission's regulations, a copy of

' this letter and the enclosures will be pitced in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

i Sincerely, (original signed by T. A. Peebles)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety

Enclosures:

'1.. Report Details

' 2.

Examination (s) and Answer Key (s) (SR0/R0)

~

3.

Facility Comments

'4.

NRC Resolution of Comments 5.

Simulation Facility Report

- cc w/ enc 1 1:

(See page 2)

~

'8909140130 890906 PDR ADOCK 05000321 V

PDC f

kl y[

......m.

J

[

Georgia Power Company 2

September 6, 1989 cc w/ enc 1 1:

State of Georgia cc w/ enc 1s 1 and 5:

H. C. Nix, Site Generh1 Manager cc.w/encls 1.-2, 3, 4, and 5:

C. Coggins, Manager of Training bec w/ enc 1 1:

L. Crocker, NRR K.~Brockman, DRP J. Menning, Hatch Senior Resident Inspector G. Hopper, DRS bec w/encls 1, 2,'3, 4, and 5:

Document Control Desk bec wIencls 1 and 5:

Operator Licensing Branch, DLPQ:NRR i

(

l i

i i

1 i

RII RI RII R11 CCa "SMde M/ man n les GHopp r:btm 8/>bto

/89 8/g/89

/g/89 8/$F/89 I

u____m._.___

._