Forwards Insp Repts 50-321/89-11 & 50-366/89-11 on 890619-23.Noted Violations Not Being Cited Due to Criteria for Categorization of Licensee Identified Violations Being Met
ML20246Q251
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/14/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20246Q255 List:
References
NUDOCS 8907210041
Download: ML20246Q251 (2)


See also: IR 05000321/1989011

Text

__ _ _ _ _ _ _

. .

[

ag 141989

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 1295

Rirmingham, AL 35201

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/59-11 AND 50-366/89-11)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

N. Merriweather on June 19-23, 1989. The inspection included a review of

activities authorized for your Hatch facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. However, because all of the criteria for categorization of

licensee-identified violations were met, the violation is not being cited.

The details pertaining to the licensee-identified violation is described in

the enclosed Inspection Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNED BY

CAUDLE A.JULIAN

Caudie A. Jullan, Chief

Engineering Branch

Division of Reactor Safety

Enclosure: (See page 2)

8907210041 890714

PDR

O ADOCK 05000321

PDC

._ - _ - _ _ _ _ _ _ _ __ -

NC

. _ _ _ _ _ _ . _- . _ _

. .

-

.

.

Georgia Power Company 2

M 14 E

Enclosure:

NRC Inspection Report

cc w/ encl:

R. P. Mcdonald, Executive Vice President,

Nuclear Operations

J. T. Beckham, Vice President, Plant Hatch

H. C. Nix, General Manager, Plant Hatch

0. M. Fraser, Site Quality Assurance

Manager

J. Heidt, Manager, Nuclear Engineering

and Licensing, Plant Hatch

S. B. Tipps, Manager of Nuclear

Safety and Compliance

State of Georgia

bec w/ encl:

L. P. Crocker, NRR

M. V. Sinkule, RII

NRC Resident Inspector

Document Control Desk

-

i

!

l

l

,}

RII:DRI I:

R IgS

NMerri -ather:tj TConlon 7 p[j( AHerdt

07/g/89 07 g/89 07/ /89

i

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . - _ _ _

j