__ _ _ _ _ _ _
[
.
.
ag 141989
Docket Nos. 50-321, 50-366
Georgia Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 1295
Rirmingham, AL 35201
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-321/59-11 AND 50-366/89-11)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
N. Merriweather on June 19-23, 1989.
The inspection included a review of
activities authorized for your Hatch facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
However, because all of the criteria for categorization of
licensee-identified violations were met, the violation is not being cited.
The details pertaining to the licensee-identified violation is described in
the enclosed Inspection Report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGNED BY
CAUDLE A.JULIAN
Caudie A. Jullan, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
(See page 2)
8907210041 890714
ADOCK 05000321
O
NC
._
- _ - _ _ _ _ _ _ _ __ -
. _ _ _ _ _ _ .
_- . _ _
.
.
-
.
.
M 14 E
Georgia Power Company
2
Enclosure:
NRC Inspection Report
cc w/ encl:
R. P. Mcdonald, Executive Vice President,
Nuclear Operations
J. T. Beckham, Vice President, Plant Hatch
H. C. Nix, General Manager, Plant Hatch
0. M. Fraser, Site Quality Assurance
Manager
J. Heidt, Manager, Nuclear Engineering
and Licensing, Plant Hatch
S. B. Tipps, Manager of Nuclear
Safety and Compliance
State of Georgia
bec w/ encl:
L. P. Crocker, NRR
M. V. Sinkule, RII
NRC Resident Inspector
Document Control Desk
-
i
!
,}
l
l
RII:DRI
I:
R IgS
7 p[j( AHerdt
NMerri -ather:tj
TConlon
07/g/89
07 g/89
07/
/89
i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ .
- _ _ _
j