Text
~
..
l'
I
l'
!
August 4,
1999
i
-
Southern Nuclear Operating Company, Inc.
ATTN: Mr. H. L. Sumner, Jr.
Vice President, Hatch Plant
Nuclear Operations
P.O. Box 1295
Birmingham, AL 35201
SUBJECT:
.NRC INTEGRATED INSPECTION REPORT NOS. 50-321/99-04 AND
50-366/99-04
Dear Mr. Sumner:
On July 10,1999, the NRC completed an inspection at your Hatch 1 and 2 reactor facilities.
The enclosed report presents the results of that inspection.
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred. The violation is being treated as a Non-Cited Violation (NCV),
consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject
inspection report. If you contest the violation or severity level of the NCV, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to
the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington D.C. 20555-
0001, with copies to the Regional Administrator, Region ll, and the Director, Office of
Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001.
~ In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room (PDR).
Sincerely,
(Original signed by
Pierce H. Skinner)
Pierce H. Skinner, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos. 50-321 and 50-366
Enclosure: NRC Integrated inspection Report
g
Nos. 50-321/99-04, 5046C99-04
/O
cc w/ encl: (See page 2)
M
I
.
9908100027 990004
ADOCK 05000321
0
l
J
'
'
.,
2
cc w/ encl:
J. D. Woodard -
Executive Vice President
Southern Nuclear Operating Company, Inc.
P. O. Box 1295 -
Birmingham, AL 35201-1295
P. H. Wells
General Manager, Plant Hatch
Southern Nuclear Operating Company, Inc.
U. S. Highway 1 North
P. O. Box 2010
Baxley, GA 31515
D. M. Crowe
Manager Licensing - Hatch
Southem Nuclear Operating Company, Inc.
P. O. Box 1295
Birmingham, AL 35201-1295
Ernest L. Blake, Esq.
Shaw, Pittman, Potts and
Trowbridge
.
2300 N Street, NW
Washington, D. C. 20037
Office of Planning and Badget
Room 610
270 Washington Streel, SW
Atlanta, GA 30334
Director ~
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Manager, Radioactive Materials Program
. Department of Natural Resources
4244 International Parkway
Suite 114
Atlanta, GA 30354
Chairman
Appling County Commissioners
County Courthouse
Baxley, GA. 31513
cc w/enci cont'd: (See Page 3)
4
SNC -
3
cc w/ encl: Continued
Program Manager
Fossil & Nuclear Operations
Oglethorpe Power Corporation
2100 E. Exchange Place
Tucker, GA 30085-1349
)
Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker
10th Floor
1299 Pennsylvania Avenue
q
Washington, D. C. 20004-9500
l
)
Senior Engineer - Power Supply
Municipal Electric Authority
of Georgia
1470 Riveredge Parkway NW
Atlanta, GA 30328-4684
Distribution w/ encl:
L. Plisco, Ril
P. H. Skinner, Ril
i
L. Olshan, NRR
l
PUBLIC
NRC Resident inspector
U.S. Nuclear Regulatory Commission
11030 Hatch Parkway North
Baxley, GA 31513
l
)
.
- SEE PREVIOUS CONCURRENCE
OFFICF.
Ril:DRP
Ril:DRP
Ril:DRP
Ril:DRP
Ril:DRs
SIGNATURE
y
NAME
BHolbrook:dka* JMundef
JCanady
TFredette*
DForbes*
([gg[>
DATE
7/ /99
7/ - /99
7/ /99
7/ /99
7/ /99
3/}/99
7/ /99
COPY?
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES (NO)
YES
NO
OFFICIAL RECORD COPY
DOCUMENT NAME: G:\\HATCHUR 9944A.wpd
1
4-
'
.
3
cc w/ encl: Continued
Program Manager-
Fossil & Nuclear Operations
Oglethorpe Power Corporation
2100 E. Exchange Place
' Tucker, GA 30085-1349
Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker
10*h Floor
1299 Pennsylvania Avenue
Washington, D. C. 20004-9500
Senior Engineer - Power Supply
Municipal Electric Authority
of Georgia
1470 Riveredge Parkway NW
Atlanta, GA 30328-4684
>
Distribution w/ encl:
L. Plisco, Ril
P. H. Skinner, Rll
L. Olshan, NRR
PUBLIC
NRC Resident inspector
U.S. Nuclear Regulatory Commission
11030 Hatch Parkway North
Baxley, GA 31513
I
OFFICE
RII:DR(
Ril:DRP
l
Ril:DRP
Ril:DRP
Ril:DRS
SiONATURE
y
Qgy
g
g,
NAME
I Ro brook:dha
JMundayj
JCana g
TFrodotte
DForbes
-
DATE
g/ggf99
7/$ /99
{p
7/ /99
7/ /99
7/ 199
7/ /99
COPY't
(VESJ NO
YES
(NO)
yep f @
YES
NO
YES
NO
YES
NO
YES
NO
OFFICFAL RECORD COPY
'DOCOMENT NAME: G:WATCHWR 9EKMAwpd
L.
,
JUL-28-1999 16:07
tRC HATCH SITE
P.02
.
.
5
^5FiCs
RU:DRP
M:DRP
lM:DRP
P$ 56 #
RN:DRS w
SIONATURt;
'
y My"
pg
BHolbrook:dka
JMunday
JConsdy
/F odotte
DForbes
DA1Y
71 19e
7/ 199
7/ 199
(
7/ify199
7/g4
7/ 19 9
7/ 199
COPY?
YES
NO
YES
NO
YES
NO
YES
NO
YE8 AOJ
YES
NO
YES
NO
l
OFFICIAL RECORD COPY
DOCUMENT NAME: G:\\ HATCH \\lR 9944A.wpd
1
l
l
1
l
!
l
l
l
l
TOTAL P.02
<