7 ;

~~

o

' 3 :"'

s :.

R, (("' -"

%'of UNITED STATES NUCLEAR REGULATORY COMMISSION o

r, WASHINGTON. D. C. 20555 9

o'

.., g -

June 22, 1989-Docket Nos. 50-321 50-366 l

l Nr. W. G. Hairston, III-Senior Vice President -.

Nuclear Operations i

Georgia Power Company P. 0. Box 1295 l

-Birmingham, Alabama 35201 i

Dear Mr..Hairston:

SUBJECT:

SECOND TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM / PLAN FOR THE EDWIN I., HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. 66527 AND 66528)

By letter dited February 24, 1988, Georgia Power Conpany (GPC) submitted Revision 2' to the Inservice Inspection (ISI) Program for the Second Ten-Year Interval for the Edwin I. Hatch Nuclear Plant, Units 1 and 2.

Following an initial review the NRC staff and its contractor, Idaho National Engineering Laboratory (INEL, our letter of July 7,1988, forwarded a request for additional information.(RAI GPC responder' to the RAI by letter dated September 8,1988.

Included with the~ Septenber 8,1988 response were copies of Revision 1 of the Second Ten-Year Interval ISI Plans for Unit 1 and Unit 2.

~ The staff and its contractor have now completed the review of the Hatch ISI Program and the ISI Plans for Units 1 and 2 for the Second Ten-Year Interval. is the staff's. Safety Evaluation Report, and Enclosure 2 is the INEL Technical Evaluation Report.

The staff ~ endorses the conclusions and recommendations presented in the INEL report, and concludes'that the Hatch Second Ten-Year Interval ISI Program, Revision 2, and the Unit 1 and Unit 2 Plans, Revision 1, with the additional information provided and the specific written refief, constitute the basis for compliance with 10 CFR 50.55a(g) and Technical Specifications 4.6.K (Unit 1) and 4.0.5' (Unit 2) and are, therefore, acceptable, except as noted in Table 1 of Enclosure l' and in Section 2.2.1 of Enclosure 2. Specifically, relief requests 2.1.1, 4.1.4 and 8.1.1 are denied, and the statement, "Where it is impracticable to separate adjoining sections of piping for hydrostatic testing, the sections may be tested together at the lower specified test pressures," is

. unacceptable. ~ If GPC determines that the Code-required hydrostatic pressure test is impractical to perform or that the Code-required test pressure is impractical to attain,10 CFR 50.55a(g)(5) requires submittal of specific information and technical justification to the NRC to support that determination.

D&l 8907030233 890622 PDR ADOCK 05000321 Q

PDC i_____m_ _ _ _ _ _ _

pp..., %

l 9

.Mr..W. G.'Hairston,LIII. {

l m.

-.This, ccmpletes'the staff review of the Second Ten-Year Interval ISI Program / Plan for' Hatch Units'I-and'2.. Review of the Inservice Testing.(IST) Program for the Second Ten-Year' Interval is still under review.

However, the results of b

this review are' expected to become available within the next several months, and I-will notify you 'of"those 'results by separate correspondence after the IST review has been completed.

Please cafl me if you' have'anycquestions.

Sincerely,

w

/s/

Lawrence P. Crocker, Project Manager Project Directorate II-3 Division of Reactor Projects.I/II Office of Nuclear Reactor Regulation

Enclosures:

1. Staff SER
2. INEL Report EGG-MS-8297 cc w/ encl:

See _next page DISTRIBUTION:

. IDocket Fijeggy NRC PDR Local PDR PDII-3 Reading S. Varga

'14-E-4 G. Lainas' 14-H-3

'D. Matthews

'14-H-25 M. Rood 14-H-25 L. Crocker 14-H-25 OGC (For inform. Only) 15-B-18 E. Jordan MNBB-3302 B.- Grimes 9-A-2 ACRS (10)

P-315 i

[ Hatch Plant File Y

h PD, $-3 PD 11-3 PD 11-3 r1R d LCrocker DMatthews

% /J)/89

(,/p/89 4 /A) /89

-s l

cc:

G. F. Trowbridge, Esq.

Mr. R. P. Mcdonald Shaw, Pittman, Potts and Trowbridge Executive Vice President -

2300 N Street, N. W.

Nuclear Operations Washington, D.C.

20037 Georgia Power Company P.O. Box 1295 Mr. L. T. Gucwa Birmingham, Alabama 35201 Engineering Department Georgia Power Company Mr. Alan R. Herdt, Chief P. O. Box 1295 Project Branch #3 Birmingham, Alabama 35201 U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Nuclear Safety and Compliance Manager Atlanta, Georgia 30323 Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.

P. O. Box 1295 Birmingham, Alabama 35201 Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 725 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.

Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Director Environmental Protection Division Department of Natural Resources 205 Butler Street, S.E.,

Suite 1252 Atlanta, Georgia 30334 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513