Forwards Insp Repts 50-321/89-10 & 50-366/89-10 on 890527- 0623.Details Re Licensee non-cited Violations Described in Rept
ML20246K744
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/05/1989
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20246K749 List:
References
NUDOCS 8907180253
Download: ML20246K744 (2)


See also: IR 05000321/1989010

Text

.

.,

__

.___

.

. _ _ _ _

.-

-

_ - _ - _

- -

,

4

m

' <.:

, ..-

.

_.

3 'i '" ~

f

,

g 0 51989

gI

f

-

-Docket-Nos.. 50-321, 50-366

. License Nos.-DPR-57, NPF-5

/ Georgia Power Company;

,.

ATTN: Mr. W. .G.- Hairston,_ III

. Senior Vice President -

Nuclear Operations

-P. O. Box.1295'

Birmingham, AL'=35201

Gentlemen:

' SUBJECT: NRC INSPECTION REPORT NOS. 50-321/89-10 AND 50-366/89-10

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

J..E. Menning on'May 27'-' June 23, 1989.

The-inspection included a. review of

activities authorized for your Hatch facility. . At the conclusion of' the

inspection, the findings were discussed with those members of your staff

identified in the enclosed Inspection Report.

- Areas examined during the inspection are identified in the report.

Within

these areas, the . inspection consisted of selective examinations of procedures

.and representative records, interviews with personnel, and .observat'on of.

activities in. progress.

The'. inspection- findings indicate that certain activities appeared to violate

NRC: requirements. . However, because all of the criteria for categorization of

' licensee-identified violations were . met, two violations are not being cited.

The details - pertaining to .the licensee-identified non-cited violations are

described in the enclosed Inspection Report.

Your attention 'is also invited to the unresolved items identified in the

. Inspection Report. These matters will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

-

Sincerely.

ORIGINAL SIGNED BY

ALAN R. HERDT

89071go y 890

$21

PDR

A

PW

t

Alan R. Herdt, Chief

G

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

(See page 2)

kl

Sfel

,

- _

_ _ -

_ _ _ _ _ - - _ _ .

m---

. _ _

7

1

.

'

,

.

Georgia Power Company

2'

' JUL 0 a 1989

,

I

i

Enclosure.

I

NRC Inspection Report

cc w/ encl:

. R. P. Mcdonald, Executive Vice President,

-

Nuclear Operations

q

J. T. Beckham, Vice President,iiant Hatch

'

LH. C. Nix, General Manager, Plant Hatch-

O. M. Fraser, Site Quality Assurance

Manager

J.;Heidt, Manager, Nuclear Engineering

and Licensing, Plant Hatch

S. B. Tipps, Manager of Nuclear

Safety and Compliance

State of Georgia

bec w/ enc 1:

L. P. Crocker, NRR

-

M. V. Sinkule, RII

NRC Resident Inspector

' Document Control Desk

1

RII:DR

-

RII:DRP

NCk

LTrocine:er

J % ning/ Acting

06/A7/89-

06/30/89

,

1

!

.__ - _

_