ML20246K744
| ML20246K744 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/05/1989 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20246K749 | List: |
| References | |
| NUDOCS 8907180253 | |
| Download: ML20246K744 (2) | |
See also: IR 05000321/1989010
Text
.
.,
__
.___
.
. _ _ _ _
.-
-
_ - _ - _
- -
,
4
m
' <.:
, ..-
.
_.
3 'i '" ~
f
,
g 0 51989
gI
f
-
-Docket-Nos.. 50-321, 50-366
. License Nos.-DPR-57, NPF-5
/ Georgia Power Company;
,.
ATTN: Mr. W. .G.- Hairston,_ III
. Senior Vice President -
Nuclear Operations
-P. O. Box.1295'
- Birmingham, AL'=35201
Gentlemen:
' SUBJECT: NRC INSPECTION REPORT NOS. 50-321/89-10 AND 50-366/89-10
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
J..E. Menning on'May 27'-' June 23, 1989.
The-inspection included a. review of
activities authorized for your Hatch facility. . At the conclusion of' the
inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
- Areas examined during the inspection are identified in the report.
Within
these areas, the . inspection consisted of selective examinations of procedures
.and representative records, interviews with personnel, and .observat'on of.
activities in. progress.
The'. inspection- findings indicate that certain activities appeared to violate
NRC: requirements. . However, because all of the criteria for categorization of
' licensee-identified violations were . met, two violations are not being cited.
The details - pertaining to .the licensee-identified non-cited violations are
described in the enclosed Inspection Report.
Your attention 'is also invited to the unresolved items identified in the
. Inspection Report. These matters will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
-
Sincerely.
ORIGINAL SIGNED BY
ALAN R. HERDT
89071go y 890
$21
A
PW
t
Alan R. Herdt, Chief
G
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
(See page 2)
kl
Sfel
,
- _
_ _ -
_ _ _ _ _ - - _ _ .
m---
. _ _
7
1
.
'
,
.
Georgia Power Company
2'
' JUL 0 a 1989
,
I
i
Enclosure.
I
NRC Inspection Report
cc w/ encl:
. R. P. Mcdonald, Executive Vice President,
-
Nuclear Operations
q
J. T. Beckham, Vice President,iiant Hatch
'
LH. C. Nix, General Manager, Plant Hatch-
O. M. Fraser, Site Quality Assurance
Manager
J.;Heidt, Manager, Nuclear Engineering
and Licensing, Plant Hatch
S. B. Tipps, Manager of Nuclear
Safety and Compliance
State of Georgia
bec w/ enc 1:
L. P. Crocker, NRR
-
M. V. Sinkule, RII
NRC Resident Inspector
' Document Control Desk
1
RII:DR
-
RII:DRP
NCk
LTrocine:er
J % ning/ Acting
06/A7/89-
06/30/89
,
1
!
.__ - _
_