1JUL 2 71989
Docket Nos.:50-321, 50-366
,
Georgia' Power Company-
ATTN:Mr.' W. G. Hairston, III
-
Senior Vice President.-
_
_ . ,
<
.
._ Nuclear _ Operations
S/IEGUMDS INT 0RMATION EEMOVED
_
P. O. Box 1295
.. Birmingham, AL 35201
Gentlemen::
. SUBJECT:
NRC. INSPECTION REPORT-N05. 50-321/88-37 AND 50-366/88-37
~
Thank you' for your . response of. June 22. 1989, to our Notice of Violation issued
on May 31,1989, concerning activities conducted at your Plant Hatch facility
under NRC License Hos. OPR-57 and NPF-5.
In ~ your -response, you acknowledged the occurrence of the. violation relating to
the unauthorized entry of _a child into the protected area, but expressed the
. belief..that -the . violation was inconsistent with current NRC philosophy of-
performance based inspections' due to the event having no ' safeguards sign-
ificance.
Your? response further denied the violation relating to the failure
4
- to report the event.
After careful consideration of the-basis for_ your denial,
. we have concluded, for the~ reasons presented in the enclosure to this_-letter,
Lthat -the violation occurred as ' stated in the Notice of Violation.
Therefore,
in accordance with 10 CFR 2.201(a),'please submit to this office.within 30 days
of the date: of; this letter, a_ written statement describing steps which have
.
been taken to correct the violation denied and the results achieved, corrective
steps which will be -taken to avoid further violations, and the date when full
compliance will be achieved.
The incident'itself indicates a very low regard by the security. staff for their
ownL program and procedures.
Further, the attitude of management appears to be
supportive of the security staff attitude based on the improper analogy of the
' five year-old child climbing a fence and the failure to initiate an
-investigation into the incident until a substantial period of time (30 days)
.had elapsed.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security neasures are exempt from public disclosure.
Therefore, the enclosure
'
.to this letter will not be placed in the NRC Pubitc Document Room.
The responses directed by this letter and its enclosure are not subject to the
. clearance procedures of the Office of Management and Budget as required by the
'
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
,
1
I b
8908030159 890727
4 .-
ADOCK 05000321
o
)
w
.__
- - _ - _ _ _ -
-
,
. Georgia Power Company
2
JUL 2 7 l$89
We appreciate your cooperation in this matter.
Sincerely,
Di
Stewart D. Ebneter
Regional Administrator
Enclosure:
Staff Assessment of f.icensee Response
(Safeguards Information)
cc w/ enc 1:
'
R. P. Mcdonald, Executive Vice President,
-Nuclear Operations
J. T. Beckham, Vice President, Plant Hatch
H. C. Nix, General Manager, Plant Hatch
0. M. Fraser, Site Quality Assurance
Manager
J. Heidt, Manager, Nuclear Engineering
and Licensing, Plant Hatch
S. B. Tipps, Manager of Nuclear
Safety and Compliance
cc w/o enc 1:
State of Georgia
bec w/ enc 1:
NRR/DRIS/SB
bec w/o enc 1:
L. P. Crocker, NRR
M. V. Sinkule, RII
NRC Resident Inspector
Document Control Desk
RIDS, IE-04, 075
(-- -.
-
'
RII:DRSS
RII:DRSS
R)l *
RII:DRSS
&
'
//ft-C
AT1
n:tj
DTho
1re
'line
hPStohr
.
07/[hUson
07/
9
]/89
07/j7/
07/A
9
07/td/89
RII:DRP
RII:DRP
RJdR
RII:DRA
h
L
A
k
h
s
)07/%/89
4
st
07/g/89
07/g/89
0
89
L--_---_-----
- - -
- - - -