Forwards Insp Repts 50-321/89-16 & 50-366/89-16 on 890722- 0825.Violations Noted But Not Cited Since All Criteria of licensee-identified Violations Met
ML20248D182
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/20/1989
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20248D183 List:
References
NUDOCS 8910040149
Download: ML20248D182 (3)


See also: IR 05000321/1989016

Text

- ,

, , .; * ~' '

gp 2 01989

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Georgia Power Company.

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/89-16 AND 50-366/89-16

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

,

Messrs. J. E. Menning and R. A. Musser on July 22 - August 25, 1989. The

inspection included a review of activities authorized for your Hatch facility.

At the conclusion of the inspection, the findings were discussed with those

members.of your staff identified in the enclosed Inspection Report.

' Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. However, because all of the criteria for categorization of

licensee-identified violations were met, the violation is not being cited.

Therefore, no response to this item is required. The details pertaining to the

licensee-identified, non-cited violation are described in the enclosed

Inspection Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10 Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Alan R. Herdt, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

NRC Inspection Report

8910040149 890920

cc w/ enc 1: (See page 2) PDR ADDCK 05000321 I'

G PNV

_ _ _ _ - _ _ _ __ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

ZF /

r-

.

,,

,'*~

SEP t 01989

Georgia Power Company 2

cc w/ enc 1:

R. P. Mcdonald.. Executive Vice

President, Nuclear Operations

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

J. T. Beckham

Vice President, Plant Hatch

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

H. C. Nix

General Manager Plant Hatch

Route 1 Box 439

Baxley, GA 31513

S. J. Bethay

Manager Licensing - Hatch

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

Shaw, Pittman, Potts and

Trowbridge

2300 N Street, NW

Washington, D. C. 20037

Charles H. Badger

Office of Planning and Budget

Room 610

270 Washington Street, SW

Atlanta, GA 30334

J. Leonard Ledbetter, Director

Environmental Protection Division

Department of Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

Chairman

Appling County Commissioners

County Courthouse

Baxley, GA 31513

State of Georgia

bec w/ enc 1: (See page 3)

_ ___ _______ ____ _ ______-__ _ _- -

_ _ - _ _ - _ _ _ _ _

.

L ..-

h v. .. ,

i

I

l Georgia Power Company 3

SEP 01989

bec w/ encl:

L. P. Crocker, NRR

M. V. Sinkule, RII

K. E. Brockman, RII

Document Control Desk

NRC Resident Inspector

l -- U.S. Nuclear Regulatory Comission

Route 1, Box 725

Baxley, GA 31513

Hugh S. Jordan, Executive Secretary

Georgia Public Service Comission

244 Washington Street SW

Atlanta, GA 30334

(

RII:DRP RII:D P

WT h an

LTrocine KEBr

09/)f/89 09 /8