ML072950527: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/22/2007
| issue date = 10/22/2007
| title = 10/19/2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements
| title = 10/19/2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Naslund C D
| addressee name = Naslund C
| addressee affiliation = Union Electric Co
| addressee affiliation = Union Electric Co
| docket = 05000483
| docket = 05000483
Line 31: Line 31:


==Enclosures:==
==Enclosures:==
: 1. Attendance List  
: 1. Attendance List
: 2. Presentation Slides Union Electric Company John O'Neill, Esq. Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W.
: 2. Presentation Slides Union Electric Company John O'Neill, Esq. Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W.
Washington, DC 20037 Scott A. Maglio, Assistant Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Missouri Public Service Commission Governor's Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 651 02-0360 H. Floyd Gilzow Deputy Director for Policy Missouri Department of Natural Resources P. 0. Box 176 Jefferson City, MO 651 02-01 76 Rick A. Muench, President and Wolf Creek Nuclear Operating Corporation P.O. Box 41 1 Burlington, KS 66839 Chief Executive Officer Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 631 30 Lee Fritz, Presiding Commissioner Callaway County Courthouse 10 East Fifth Street Fulton, MO 65251 Les H. Kanuckel, Manager Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Union Electric Company Director, Missouri State Emergency P.O. Box 116 Jefferson City, MO 65102-01 16 Management Agency Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 651 02-0570 Luke H. Graessle, Manager AmerenUE P.O. Box 620 Fulton, MO 65251 Regulatory Affairs Thomas B. Elwood, Supervising Engineer Regulatory Affairs/Licensing AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 Keith G. Henke, Planner Division of Community and Public Health Office of Emergency Coordination 930 Wildwood, P.O. Box 570 Jefferson City, MO 65102 Technical Services Branch Chief FEMA Region VI1 2323 Grand Boulevard, Suite 900 Kansas City, MO 641 08-2670 ENCLOSURE 1 ATTENDANCE SHEET - CALLAWAY PUBLIC MEETING (10/19/07)
Washington, DC 20037 Scott A. Maglio, Assistant Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Missouri Public Service Commission Governor's Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 651 02-0360 H. Floyd Gilzow Deputy Director for Policy Missouri Department of Natural Resources P. 0. Box 176 Jefferson City, MO 651 02-01 76 Rick A. Muench, President and Wolf Creek Nuclear Operating Corporation P.O. Box 41 1 Burlington, KS 66839 Chief Executive Officer Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 631 30 Lee Fritz, Presiding Commissioner Callaway County Courthouse 10 East Fifth Street Fulton, MO 65251 Les H. Kanuckel, Manager Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Union Electric Company Director, Missouri State Emergency P.O. Box 116 Jefferson City, MO 65102-01 16 Management Agency Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 651 02-0570 Luke H. Graessle, Manager AmerenUE P.O. Box 620 Fulton, MO 65251 Regulatory Affairs Thomas B. Elwood, Supervising Engineer Regulatory Affairs/Licensing AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 Keith G. Henke, Planner Division of Community and Public Health Office of Emergency Coordination 930 Wildwood, P.O. Box 570 Jefferson City, MO 65102 Technical Services Branch Chief FEMA Region VI1 2323 Grand Boulevard, Suite 900 Kansas City, MO 641 08-2670 ENCLOSURE 1 ATTENDANCE SHEET - CALLAWAY PUBLIC MEETING (10/19/07)

Revision as of 19:30, 12 July 2019

10/19/2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements
ML072950527
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/22/2007
From: Vincent Gaddy
NRC/RGN-IV/DRP/RPB-B
To: Naslund C
Union Electric Co
References
Download: ML072950527 (24)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 7601 1-4005 October 22, 2007 Charles D. Naslund, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT:

MEETING

SUMMARY

CONCERNING CALLAWAY PLANT PUBLIC MEETING ON OCTOBER 19, 2007

Dear Mr. Naslund:

This refers to the public meeting conducted at the NRC Region IV office in Arlington, Texas, on October 19, 2007.

At this meeting, NRC and AmerenUE management discussed various topics, including: essential service water; the current problem identification and resolution crosscutting issue; recent human performance improvements; circumstances leading to the September 6, 2007, emergency declaration; and, safety culture. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,

a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document management system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams. html (the Public Electronic Reading Room).

Since re1 y , Vincent G. Gaddy, Project Branch B Division of Reactor Projects Docket: 50-483 License: NPF-30

Enclosures:

1. Attendance List
2. Presentation Slides Union Electric Company John O'Neill, Esq. Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W.

Washington, DC 20037 Scott A. Maglio, Assistant Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Missouri Public Service Commission Governor's Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 651 02-0360 H. Floyd Gilzow Deputy Director for Policy Missouri Department of Natural Resources P. 0. Box 176 Jefferson City, MO 651 02-01 76 Rick A. Muench, President and Wolf Creek Nuclear Operating Corporation P.O. Box 41 1 Burlington, KS 66839 Chief Executive Officer Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 631 30 Lee Fritz, Presiding Commissioner Callaway County Courthouse 10 East Fifth Street Fulton, MO 65251 Les H. Kanuckel, Manager Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Union Electric Company Director, Missouri State Emergency P.O. Box 116 Jefferson City, MO 65102-01 16 Management Agency Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 651 02-0570 Luke H. Graessle, Manager AmerenUE P.O. Box 620 Fulton, MO 65251 Regulatory Affairs Thomas B. Elwood, Supervising Engineer Regulatory Affairs/Licensing AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 Keith G. Henke, Planner Division of Community and Public Health Office of Emergency Coordination 930 Wildwood, P.O. Box 570 Jefferson City, MO 65102 Technical Services Branch Chief FEMA Region VI1 2323 Grand Boulevard, Suite 900 Kansas City, MO 641 08-2670 ENCLOSURE 1 ATTENDANCE SHEET - CALLAWAY PUBLIC MEETING (10/19/07)

PAGE I OF ENCLOSURE 2 October 19, 2007 1 Chuck Naslund Senior Vice President and Chief Nuclear Officer 1 Introduction - Chuck Naslund Pi&R Cross Cutting Issue - Adam Heflin ESW Update - Tim Herrmann Human Performance - Procedure Use and Adherence - Fadi Diya PRA improvements and Actions to Meet RG 1.200 - Luke Graessle Safety Culture Update - Chuck Naslund 2% 3 2Q2007 Callaway Plant NRC ance Indicator Status . PLE -Periormanca Umlt Exceeded:

thC YSIUB llm1ls the number 01 allowed lalluies for any men rnonllored companenl wllhoul tumlng the monlloied system Whlle under MSPI. I1 thls llmlt Is sxcaeeded.

Ihe MSPI for the monitored system 15 While. TeBarrllesS Of he SalcUIeted Value of the Index RII PLE Values lor second quarter2007 are 1.55 lhen 50 OB~CB~L 2 2Q2007 Callaway Plant NRC Performance Indicator Status Callaway NRC White Industry Cornerstone NRC Performance lndlcaior Threshold Threshold NRC Status AvglMedian Comments 8% 5 INPO PI Index -1ndustlyand Callaway 100 95 90 a5 a0 75 70 65 60 55 50 45 40 35 - - O!mter +Callaw ay - Best Ouarble -Median -Worst Ouarble gbhird Quarter PI = 85.33 --- Proiected Fourth Quarter PI = 97.91 6 3 Goal - End of Year 2007: <=I 5 Corrective Maintenance Jobs Good 0 DecOd AprOG AugO6 Dec06 Apr07 AugO7 DecO7 I ests Good >O 0 I? I I I 9 ! I i8 bm I Top Quartile c280 Hov 05 Mar 06 Jul06 Uov 06 Mar 07 JulO7 Mor 07 - Goai of 0 a Q S z .- +I - .-

  • L E 4 QRT 06 1 QTR 07 2 QTR 07 3 QRT 07 4 QTR 07 cess and are in place. ce ue 13 Tim Herrmann Vice President, Engineering 21 ccomplishments e Planned replacement of small bore pipe 9 Inspected portions of 30", 8" and 6" diameter pipe - Replaced portions of 30", 8" and 6" diameter pipe based on inspection results - Repaired portions of 30" diameter pipe using internal base metal repairs and external weld overlay repairs Q Inspected a sample of vent and drain lines - Replaced a few vent and drain lines based on inspection results 14 Small Bore ESW Pipe Replacement Status 4000 3500 3000 2500 - g 2000 1500 I000 500 0 Replacing remainder of small bore piping by the end of Refuel I6 Replacing majority of buried large bore ESW piping with HDPE material by the end of Cycle 16 (intent is to route and connect in Cycle 16 using a requested LCO extension.)

Replacing

'B' ESW pump S% 30 15 Q The scope of the inspection program is based on: -What has not been inspected - Pipe that will not be replaced by the end of - Monitoring repaired pits - Monitoring non-repaired pits Future replacements will be driven by the inspection program Refuel 16 0 Overall reliability of the ESW System has improved: - Reduction in frequency of small bore leaks (over 2 years since last leak) - No structural concerns for the pipe degradation found in ESW System - Piping replacement has increased flow margin to ESW System heat loads and reduced probability of through-wall leakage Additional pipe replacement will further increase flow margin and reduced probability of through-wail leakage 32 16 Fadi Diya Plant Director 33 e Continuing the Use and Reinforcement of Human Performance Event Prevention Tools a Continuing the Use of Coaching Observations: - Over 1100 Documented Observations Per Month Consequential Error Rate at 0.069 Per 10,000 Hours Worked 17 Violations with Human Performance Cross Cutting Issues Human Performance Cross Cutting lsues4QTR06 - 9 8 -. 3QTRO7 6 -. H'2.C - 0 H.3.a 55- 5 H.4.a E 4 -. H.4.b fib- 4QRT06 1 QTR07 2 QTR07 3QRT07 4QTRQ7 Luke Graessle anager, Regulatory Affairs 36 18 Q Training & Qualification of new PRA E ng i nee rs PRA Model Upgrade to RG 1.200 Future Projects 37 Chuck Naslund Senior Vice President and Chief Nuclear Officer 19 39 20