UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 18, 2012 LICENSEE: Union Electric Company FACILITY: Callaway Plant, Unit 1

SUBJECT:

SUMMARY

OF AUGUST 29,2012, PRE-APPLICATION MEETING WITH UNION ELECTRIC COMPANY FOR REVISING TECHNICAL SPECIFICATION 3.7.9, "ULTIMATE HEAT SINK" (TAC NO. ME9234)

On August 29,2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Union Electric Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee's planned submittal of an amendment request for Callaway Plant, Unit 1, to revise Technical Specification 3.7.9, "Ultimate Heat Sink,"

to incorporate more restrictive limits for the minimum required ultimate heat sink retention pond level and temperature, as specified in Surveillance Requirement (SR) 3.7.9.1 and SR 3.7.9.2, respectively. The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML12227A349.

The licensee presented information on the background and content of the proposed request (ADAMS Accession No. ML12241A291). The licensee described its proposed technical changes for the ultimate heat sink cooling tower and retention pond.

The NRC staff queried the licensee about several aspects of the proposed changes and provided comments for consideration by the licensee in developing its submittal. The licensee's staff acknowledged the NRC staffs questions and comments and stated that they would be considered as the licensee continues to prepare its submittal. No regulatory decisions were made at the meeting.

No members of the public were in attendance. No Public Meeting Feedback forms were received.

- 2 Please direct any inquiries to me at 301--415-2296, or Fred.Lyon@nrc.gov.

t*~

LA \':'/0'1 Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50--483

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES AUGUST 29.2012. PRE-APPLICATION MEETING WITH UNION ELECTRIC COMPANY FOR REVISING TECHNICAL SPECIFICATION 3.7.9. "ULTIMATE HEAT SINK" FOR CALLAWAY PLANT. UNIT 1 LICENSEE S. Maglio J. Little R. Andreasen M. Smith B. Yates T. Elwood M. Markley G. Casto K. Sturzebecher S. Darbali D. Muller S.Sun J. Thorp M. Hamm G. Purciarello G. Lapinsky*

F. Lyon

  • by telephone Enclosure

-2 Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov.

IRA!

Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMCallaway Resource LPL4 Reading RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource RidsRgn4MailCenter Resource RidsNrrDeEicb Resource KSturzbecher, RESIDE RidsNrrDirslolb Resource RAlvarado, NRR/DE/EICB RidsNrrDorl Resource SDarbali, NRRlDE/EICB RidsNrrDorlLpl4 Resource DMuller, NRRlDIRSIlOLB RidsNrrDraAhpb Resource SSun, NRR/DSS/SRXB RidsNrrDssSbpb Resource GPurciarello, NRRlDSS/SBPB RidsNrrDssSnpb Resource GLapinsky, NRRlDRAlAHPB RidsNrrDssSrxb Resource DRahn, NRRlDE/EICB .

RidsNrrDssStsb Resource MHamm, NRR/DSS/STSB RidsNrrLAJBurkhardt Resource SKennedy, EDO RIV ADAMS Accession Nos. Meeting Notice ML12227A349, Meeting Summary ML12243A376, Handouts ML12241A291 *via email OFFICE DORULPL4/PM DORULPL4/LA DORULPL4/BC DORULPL4/PM NAME FLyon JBurkhardt* MMarkley FLyon DATE 9/13/12 9/13/12 9/14/12 9/18/12 OFFICIAL RECORD COpy