ML22034A395

From kanterella
Jump to navigation Jump to search
Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion
ML22034A395
Person / Time
Site: Monticello, Harris, Wolf Creek, Point Beach, Grand Gulf, Arkansas Nuclear, Susquehanna, Columbia, Brunswick, Surry, Limerick, North Anna, Turkey Point, Callaway, Waterford, South Texas, Quad Cities, LaSalle  NextEra Energy icon.png
Issue date: 02/16/2022
From: Samson Lee
Division of Security Operations
To:
taw
Shared Package
ML22034A345 List:
References
Download: ML22034A395 (1)


Text

IR Report 8 Baseline Inspection Completion with Certification Information By Site Region No: 2 Site: 07000027 - BWX Technologies, Inc. IPC Cycle: 2021 (BWXT)

IMC Min Sample Completion Procedure IPE Code Title Frequency Completed Sample  % Status Note Certify Date / By 96001 SG NRC FOF Insp CAT I Fuel Cycle Triennial 2 0 0% Complete C 12/14/2021 - Berry, Joshua K Site Totals: 0 Region Totals:

Report Totals:

C: Complete NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the C1: Complete - by reference iaw IMC 0306 total between 2020 and 2022.

C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 *Procedure was marked complete, however not all sub procedures may have been completed. See IMC C4: Complete - in previous year(s) 0306 for appropriate comments.

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/27/2022 5:43:16 AM Page 1 of 1