NRC Pre Pre--LAR Submittal Telecon Callaway Plant Risk-Ri k-Informed Risk I f d TS Initiative I iti ti 5b Relocate Surveillance Frequencies to Licensee Control March 25, 2010 1

LAR 5b Telecon Agenda Introduction Scott Maglio Risk Informed Amendments Roger Wink

& Timelines PRA Quality Status Keith Connelly Schedule Scott Maglio Open Discussion and Questions All 2

Current and Planned Risk Informed Amendments Submitted BOP ESFAS Planned NFPA 805 (Risked Informed Fire Protection Program)

Initiative 5b (Relocate Surveillance Frequencies to Licensee Control)

Initiative 4b (Risk Informed Completion Times) 3

Timeline for Risk Informed Initiatives 4

Callaway PRA Quality Status Two peer reviews have been conducted on the Callaway internal events PRA:

o WOG PRA Peer Review o Scientech Gap Analysis (using ASME Std, through 2005 Addendum)

Gaps to Capability Category II of the Standard, and open WOG Peer Review findings, are being addressed in a current, large-effort PRA upgrade (Update 5) project.

o Team effort by AmerenUE and Scientech o Scheduled for completion 4th Quarter 2011 5

Current Model (Update 4) Quality Status:

Gaps to CC II of the Standard are documented in a set of Findings/Observations, or F/Os.

o No A-Level F/Os (Extremely important and necessary to address.)

o 24 B-Level F/Os (Important and necessary to address, but may be deferred until the next PRA update) o 20 C-Level F/Os (Marginal importance.)

6

Gap Assessment Status Scientech has preliminarily assessed the current internal events model gaps to Capability Category II with respect to RITSTF Initiative 5b.

B Based d on thi this preliminary li i assessment, t none off the th identified gaps would appear to preclude implementation of 5b using the current PRA model.

o This conclusion is based, in part, on the NEI 04-10 process, which provides for addressing quality gaps with sensitivity analyses.

7

Gap Assessment Status NFPA 805 Fire PRA under development Final Peer Review Report received March 9, 2010.

External and shutdown risk will be addressed, initially, with qualitative or bounding analyses.

8

5b Schedule Considerations Approach:

o Submit ~ 6/2010 o Based on current PRA model, with sensitivity analyses to address gaps to Capability Category II (per NEI 04-10 guidance).

9

Open Discussion and Questions Submittal will follow LAR Template (TSTF-425 (Rev 3))

o Assessment and NSHC based on 7/6/09 FR o No significant variations or deviations o The Independent Decisionmaking Panel may be separate from the MR Expert Panel o Submittal and implementation processes to utilize inputs from STARS (Diablo Canyon & STPNOC) o Table assessing all Callaway TS SRs for inclusion - Include with LAR?

o Will include TS mark-up pages o Would NRC want TS typed pages with LAR, or prior to LA issuance date?

10