Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection CompletionML22034A397 |
Person / Time |
---|
Site: |
Monticello, Harris, Wolf Creek, Point Beach, Grand Gulf, Arkansas Nuclear, Susquehanna, Columbia, Brunswick, Surry, Limerick, North Anna, Turkey Point, Callaway, Waterford, South Texas, Quad Cities, LaSalle |
---|
Issue date: |
02/16/2022 |
---|
From: |
Samson Lee Division of Security Operations |
---|
To: |
|
---|
taw |
Shared Package |
---|
ML22034A345 |
List: |
---|
References |
---|
Download: ML22034A397 (1) |
|
Similar Documents at Monticello, Harris, Wolf Creek, Point Beach, Grand Gulf, Arkansas Nuclear, Susquehanna, Columbia, Brunswick, Surry, Limerick, North Anna, Turkey Point, Callaway, Waterford, South Texas, Quad Cities, LaSalle |
---|
Category:- No Document Type Applies
MONTHYEARML23362A0642024-01-16016 January 2024 Enclosure - Participants List for 12-19-23 Summary of Meeting with Triso-X, LLC, to Align on Triso-X Draft Environmental Safety Request for Additional Information ML24002B1302024-01-0404 January 2024 03. FW A9 Evaluation Forms for CoC (Compiled 2013-0315) ML24002B1312024-01-0404 January 2024 04. FW A9 Evaluation Forms for Appendix a (Compiled 2023-0315) ML24002B1322024-01-0404 January 2024 05. FW A9 Evaluation Forms for Appendix B (Compiled 2023-0315) ML23353A1842023-12-27027 December 2023 Enclosure 1 - Participants List for Summary of Meeting Held December 4, 2023, with TRISO-X, LLC to Align on Draft Responses to Requests for Additional Information for Chemical Safety Analysis ML23354A2102023-12-20020 December 2023 File 2B Exam Administrative Items ML23341A1902023-12-0707 December 2023 Enclosujustification for Exemption Request from Specific Requirements in 2023 Security Rule ML23348A2202023-11-30030 November 2023 2016 Revision to License Renewal Request Attachment IV ML24018A0702023-11-30030 November 2023 Form 2.1-1 Examination Preparation Checklist ML23317A0072023-11-30030 November 2023 Revised Draft Record of Decision Kairos Hermes CP ML23333A0122023-11-27027 November 2023 Attachment D - Bill Nuttle 2023 Expert Declaration ML23313A2042023-11-21021 November 2023 Enclosure 1: 10/12/2023 Meeting - Framatome List of Attendees ML23291A4462023-11-0101 November 2023 Enclosure 1 - List of Attendees ML23354A1112023-10-26026 October 2023 Logistics Support Coordinator Checklist ML23354A1132023-10-26026 October 2023 Off-Site Liaison Coordinator Checklist ML23354A1092023-10-26026 October 2023 Protective Measures Coordinator Checklist ML23265A1592023-10-0202 October 2023 NRC 898 Revised Completeness Determination for NuScale Topical Report TR-0516-49416, Non-Loss-Of-Coolant Accident Analysis Methodology, Revision 4 ML23265A1242023-09-22022 September 2023 Revised NRC Form 898 for Dwo LTR Resource Estimate ML23229A1562023-09-15015 September 2023 Enclosure 1 Framatome Meeting List of Attendees ML23229A156 (Public) ML23263A9872023-09-0707 September 2023 FOIA-2023-000207 - Resp 1- Final, Agency Records Subject to the Request Are Enclosed ML23211A0012023-09-0707 September 2023 Enclosure - Consideration of New Information Regarding Kairos Hermes 2 on the Cumulative Impacts for Kairos Hermes Test Reactor ML23263A9892023-09-0707 September 2023 FOIA-2023-000207 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed ML23242A2142023-08-31031 August 2023 Request for Extension of Comment Period Associated with Draft Nuregs: Revision 1 of Subsequent License Renewal Guidance Documents, and Supplement 1 to Associated Technical Basis Document, Docket Id NRC-2023-0096 ML24002A8132023-07-25025 July 2023 EIP-ZZ-00240 Add E, Rev. 28, Health Physics Coordinator (Hpc) Checklist ML23202A1762023-07-11011 July 2023 Enclosuchronological Timeline of Bleu Project at NFS ML23192A1212023-07-0606 July 2023 FAQ 23-03 - Peach Bottom Unit 1 Unplanned Scram with Complications Interpretation ML23180A1352023-06-29029 June 2023 EA 23-040 BWXT Pec Summary Final ML23181A1342023-06-20020 June 2023 RT-100 SAR Rev. 10, Record of Revisions ML23165A2492023-06-14014 June 2023 4Q 2022 Performance Summary U4 ML23165A1112023-06-14014 June 2023 Archives ITAAC Findings on Design Engineering ML23165A2512023-06-14014 June 2023 1Q 2023 Performance Summary U4 ML23164A1862023-06-13013 June 2023 Crop 2022 Q4 Cross Cutting Issues Summary Page ML23215A1632023-06-0101 June 2023 Bf 2023-301 File 2B - Exam Administrative Items (Normal Release) ML23143A1792023-05-19019 May 2023 Robatel, Technologies Llc., RT-100 Safety Analysis Report, Rev. 9 - Record of Revisions ML23150A1902023-05-18018 May 2023 Submittal of EIP-ZZ-00245 Addendum H, Revision 004, Security Coordinator Checklist for the Alternate Tsc/Osa Assembly Area ML23164A0262023-05-18018 May 2023 Procedure Review Form - Emergency Coordinator (EC) Checklist ML23150A1872023-05-18018 May 2023 Submittal of EIP-ZZ-00240 Addendum H, Revision 008, Security Coordinator Checklist ML23138A1462023-05-16016 May 2023 Conversation Record CoC 1042 Amendment 4 - Clarification Call Regarding Tn'S Structural Rsi Responses ML23136A6052023-05-12012 May 2023 FAQ 23-02 Peach Bottom Performance Indicator Interpretation Request ML23159A1652023-05-11011 May 2023 TMI-2 Pol Am. 67 and SER Minor Discrepancies ML23061A1292023-05-0909 May 2023 International Consolidated Interim Storage Facility NEPA Record of Decision ML23131A3472023-05-0909 May 2023 Concurrence Page for K Manzione Holtec International, Issuance of Materials License 2024-01-04 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Monticello]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Point Beach]] OR [[:Grand Gulf]] OR [[:Arkansas Nuclear]] OR [[:Susquehanna]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:Callaway]] OR [[:Waterford]] OR [[:South Texas]] OR [[:Quad Cities]] OR [[:LaSalle]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Monticello]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Point Beach]] OR [[:Grand Gulf]] OR [[:Arkansas Nuclear]] OR [[:Susquehanna]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:Callaway]] OR [[:Waterford]] OR [[:South Texas]] OR [[:Quad Cities]] OR [[:LaSalle]] </code>. |
Text
IR Report 8 Baseline Inspection Completion with Certification Information By Procedure
Title:
Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Procedure: 92707 Limited IPE Code: SG IMC Min Sample Completion Region Site IPC Frequency Completed Sample Percent Status Note Certify Date / By When 1 LIM 2021 1 0 0% Complete C 09/27/2021 - Berry, Joshua K required When 2 HAR 2021 1 0 0% Complete C 12/14/2021 - Berry, Joshua K required When 2 NA 2021 1 0 0% Complete C 09/27/2021 - Berry, Joshua K required When 2 SUR 2021 1 0 0% Complete C 09/27/2021 - Berry, Joshua K required When 3 LASA 2021 1 0 0% Complete C 10/27/2021 - Berry, Joshua K required When 4 STP 2021 1 0 0% Complete C 08/25/2021 - Ober, Rebecca A required Total: 0 C: Complete NOTE: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the C1: Complete - by reference iaw IMC 0306 total between 2020 and 2022.
C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 *Procedure was marked complete, however not all sub procedures may have been completed. See IMC C4: Complete - in previous year(s) 0306 for appropriate comments.
C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/27/2022 5:33:15 AM Page 1 of 1