ML101620053
ML101620053 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 06/09/2010 |
From: | - No Known Affiliation |
To: | Office of Information Services |
References | |
09067011T, FOIA/PA-2010-0209 | |
Download: ML101620053 (34) | |
Text
( . 1 i
BOREHOLE IDENTIFICATION TABLES CýLLAWAY POWER PLANT ;l r
TERRACON PROJECT NO. 09067011T
- Bdrnfg: CA7SOLLSt,, 19 35, 27~LT (VicinityofDbck Haul Road)
SamlenteJa (feetiibgs)e 1, L~:Tnnutjpi/)u UT NID'Lthid
- itpi ftb, Titu (u L D ~tiue DDogtu ~UTM~Esig UMot~g 0-5' <166 I 2/7/2007 5-10' <166 1 2/7/2007 10-15' <166 1 2/7/2007 15-20' <166 1 2/7/2007. 38.7054 -91.7406 1857119.57 1046600.61 20-25' <166 2/7/2007 25-30' 657 +/- 113 - 2/7/2007 Tritium in Water <145 - 2/9/2007 PBrI %a
- ; 20 6i,.60aB1St 6 0 a1k.a MWý0116),
- Sample lnt*'r,-al (friti)m *,,"nt p(ZiL D
- S~m~plingi*,* *oD ,jtituiil* *DD lui.gitb*d, LIT
- E aýtJsnq Tý ý,iglhing 3-5' <145 1 10/312007 8-10' <145 10/3/2007 13-15' <145 1 10/3/2007 18-20' <145 10/3/2007 23-25' <145 10/2007 38.7093 -91.7577 1852231.94 1047973.94 23-25' <145" I 10/3/?20 28-30' <145 i 10/3/2007 33-35' <145 1 10/3/2007 38-40' <145 10/3/2007 sapý Lq-
"er"j'o- ~.DIL lingimlDate'L titude DL~vjL IflEi T iVatn ~U],itMNrthiný 3-5' <147 i 9/28/2007 8-10' <147 1 9/28/2007 13-15' <147 1 9/28/2007 18-20' <147 i 9/28/2007 23-25' <147 - 9/28/2007 38.7058 -91.74222 1856668.3 1046737.59 23-25' <147 1 9/28/2007 28-30' <147 - 9/28/2007 33-35' <147 - 9/28/2007 Tritium in Water <156 10/3/2007 _
NOTES:
1)Bold value represents value detected above reportng limits.
- 2) DD = Decimal Degrees. -
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T B66cCASO-Sa.69+45'4,,RT cmiriof MH-2). - . *.
ST,-6'Tum p-i L, 1DD g Date 0TM DD Latitude Lon/2itu/de Eas;hng 4-6' <171 12/28/2006 9-11' <171 12/28/2006 14-216 <171 1228/206 38,7078 -91.7579 1852187.95 1047414.42 192'<171 i12/?28/2006 24-26' <171 I 12/28/2006 Tritium in Water <143 - 12/2812006
~~. q. 0jSOI0-3ta: 72 , 05, 4C' LTz B~~driii li fMH2 - 4-3-5' <147 1 10/11/2007 8-10' <147 10/1/2007 13-15' <147 10/1/2007 18-20' <147 10/1/2007 23-25' <147 1 10/1/2007 38.70773 -91.75868 1851956.06 1047399.9 28-30' <147 i 10/1/2007 33-35' <147 i 1011/2007 38-40' <147 1 10/1/2007 Tritium in Water <156 10/3/2007 lIntere, fe bgs) ~ T bqq'(ý i~Lm, gUtLE) LD.Ifitud! DID Lýigiudie UTME-ri4 U%
4-6' <167 12/15/2006 9-11' <167 12/15/2006 14-16' <167 12/15/2006 19-21' 429+/-1105 t 12/15/2006 38.7078 -91.7589 1851897.3 1047410.67 24-26' 451 +/- 106 ! 12/15/2006 29-31' 431 +/- 105 12/15/2006 34-36' 274 t 99 12/15/2006 Tritium in Water 583 +/- 105 - 12/18/2006 NOTES:
- 1) Bold value represents value detected above reportir g limits.
- 2) D0 = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest I aboratory.
- 6) Stations represent field measured approximations. Notmeasured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T Fl'7h LTX(idinit, fMtH-2) .
sarl!i~evl(etbiý Tilr FV) Sr pliqg~fte DD Lat~tUde ~DD Longiitude UTM Ea'stnqg UTM l Northing 10-5' I 11 , J1/07 3870178 -91 7589ý 18518ý79ý77 10474L22.4_
!,, iB CA-SO)LSta,72. 1 80,235 LT Vcr nty, ofMH-2).. ,
,sample [)ea (fe bg. T l ,tiun;4 Samp ___Dat 1__'Litatijfe DDPALonvjlUd UTM Ea-Arg UMNorthirng IJ,,,
0-5' <162 I 2/7/2007 5-10' <165 2/7/2007 10-15'
.10-2 <165
<165 2./7/2007 217/2007 38.7078 -91,7589 1851879.10 1047417.66 15-20' <162 ! 2/7/2007 20-25' <181 '27/2007 Trtium in Water None Not sampled Sait-o1[tr~l(feet~ TntIUM pD D,.It S(pe/Lji, Lýýg'd~ DD Lcn~iý)ide~ UT%1Easg ~UT!1 t'Jorthiiig_
3-5' <147 9/28/2007 8 8-10' <147 9/28/2007 13-15' <147 9/28/2007 18-20' <147 9/28/2007 38.7081 -91.7592 1851806.59 1047533.45 23-25' <147 1 9/2812007 28-30' <147 1 9/28/2007 Tritium in Water <156 10/9/2007 1 ru- iW <1628 2/7/2007 5-10' <181 I 2/7/2007_
10-15' <162 1 2/7/2007" 10-15, <162 1 217/2007 38.7077 -91.7590 1851871.69 1047378.14 15-20' <162 1 2/7/2007 20-25' 238-+/- 91 2/712007 ITritium in Water 313 +/- 87 2/9/2007 NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) D0 = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations . Not measured by professional surveyors.
BOREHOLE i IDENTIFICATION TABLES CALLAWAY POWER PLANT T
TERRACON PROJECT NO. 09067011T Sape lu i ~,) 8Tiwi(pUt/t Snimplinq Dite ~DD L~tlitude DD L-ngitud'e UT1Etq IT11fnlm 0-5' <167 2/7/2007 5-10' <167 *2/7/2007 10-153 <167 E/0 38.7077 -91.7592 1851808.32 1047387.84 15-20' <167 I 2/7/2007; 20-25' <167
- 2/7/2007 Tritium in Water None Not sampled 0-5' 497:1:108 1 2 2/72007 5-10' <167 2/7/2007 10-15' <167 2/7/2007 38.7080 -91.7592 1851815.54 1047514.2 15-20' <168 2/7/2007 M2025'I>SanpeIitKm u +/-F.C Sa .DE) Ltitudel Eaistiný U- r,1Nrhn 97 L "%W' ,UTMl 229 2/7/200; ITritium in Water 162 +/- 80 9/92007 10-5' <167 t 2/7/2007 gtd.g 0-5' -2/7/2007 <167 5-10' <167 [ 2/7/2007 10-15' <167 [ 2/7/2007 38.7077 -91.7593 1851782.9 1047385.41 115-20' <167 2/7/2007 Tritium in Water None Not sampled -
sap. <171t nt~j'np~i ~ate; Samplingls DD Latitujde- DD Lun UT Ea,#-
3-5' <171 I 12/28/2006 8-10' <171 i 12/28/2006 13-15' <171 12/28/2006 38.7082 -91.7592 1851800.63 1047559.44 19-20' <171 12/28/2006 23-25' <171 12/28/2006 Tritium in Water <143 1 1/3/2007 NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T 74;+ 03,.117 CAihi(-!-SOL-Sta: TT(VibinitVofMH-3) <W<.-~
Tritium (p!i U Sam$IinqDaie DE)Latitude> DD Longitude UTIM Easbng ' UTM Northing2 Sample interval (feet*bgs) 4-6' <167 1 12/27/2006 9-11' <165 12/27/2006 14-16' <165 1 12/27/2006 14-21' <171 12/27/2006 38.7076 -91.7594 1851748.79 1047346.51 119-21' <171 i 12/27/2006 24-26' <171 12/27/2006 Tritium in Water None I Not sampled
-~ on 4: ~--)US ta25S 132z,26' RT (Vidriiy of
~I'J'UL ietlalftbs TI; (pc L/ 'H pi-?V t ti" D cmii UTh4l Eastn MN_,fhl 1 . p ing ILIT 0-5' <181 . 2/8/2007 5-10' <167 2/8/2007 10' <181 2/8/2007 38.7081 -91.7600 1851591.17 1047513.61 10-15' <_181 _ 2/8/2007 Tritium in Water None Not sampled
____,,_,--___;____go'i__g CA Sta,-7.5 + 93, 37'LT iciniy of MH-3A) 2 ____________
ý is
ý) nYTtiunmpCi L), ý irapl Dte iDDl*atitudl DD ongII.de UTEa~timj ?UThl NNi'rrg NSml InerD (feI '- ~ -H.. ~. - ,-
0-5' <167 i 2/8/2007 5-10' <181 2/8/2007 10-15' <168 b2/8/2007 2/8/2007 38.7079 -91.7600 1851571.86 1047452.55 15-20' <169 20-25 <181 2/8/2007 Tritium in Water <145 2/9/2007 NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
BOREHOLE I IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACbN PROJECT NO. 09067011T stwq~, ntr,ýil(f-tl~gs TdtSa ipinL)Dat, DIDLatitude. 'DD Lojngfitude UyEM Ea~ti,~ ~UTM1 N~ortiNg 0-5' <167 218/2007 5-10' <167 i 2/8/2007 10-15 <167 2/8/2007 38.7084 -91.7626 1850844.05 1047642.02 15-20' <167 i 2/8/2007 20-25; <167 - 2/8/2007 Tritium in Water <145 - 2/9/2007 1 1 1 1 nerva, eesj TritJum1(p~t'L)y ~ Samplipng Daite ~DD Ljatitudý DD____qjjastirM L T Nýo hinq 0-5' <167 I 2/8/2007 5-10' <167 1 2/8/2007 10-15' <167 2/8/2007 38.7089 -91.7666 1849684.02 1047811.28 15-20' <167 2/8/2007 20-25' <169 2/8/2007
<145 - 2/9/2007 Tritium in Water
~Boring ~CA-- L%-Sta.:'14 K. 100' LT (Vicinity, of MýH-5)~
Inter-il
ý,jsISanýýiplwii tut ) ),t D L ititud, DEDLorgitml i-T~ L-,,- UTNotý,hinq 0-5' <169 1 22/8/2007 5-10' <169 1 2/8/2007 10-15' <169 1 2/8/2007 38.7088 -91.7699 1848744.63 1047774.37 15-20' <169 1 2/8/2007 Tritum in Water <145 1 2/9/2007 NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T
____________________ >BoririoýG:CAS0L`-Sta. 104 +64,60'I L(Vicinity,of MH-5) ______________
.Sam~le Interval (feet bgs) Tritium (Ci/Li)A SamnplingDate DIDLatitude ODDLongitude UTM Easting UTM Northing 3.2-5.2' <193 1 6/21/2007 8-10' <190 6/21/2007 13-15' <192 I 6/21/2007 18-20' <192 1 6/21/2007 38.7089 -91.7699 1849610.71 1047809.22 23-25' <192 . 6/21/2007 28-30' <190 1 6/21/2007 Tritium in Water None Not sampled
~~ 7::-~~~~;tbiH; A~3t A- !- n<<b~i 104 +'94,60'LT (intyf.H:5)~~%v
- ' ,,I :f@*-l *: Tnin p'*
i !_L: *ýan I*,'
ln ' at4 . .. '
- I.M *Ei,t; *,iri UT, 1 No *lw, 4-6' <167 1 12/4/2006 19-11' 98114 .<
567 167 12/4/2006 12/4/2006 93 -91.7701 1848703.25 1047949.56 14-16' 556 +/-- 110 1 2124/2006 Tritium in Water 468 +/- 104 1 12/5/2006 I
-Sruki1rt~wl(Ietý,sý Tnitwurn pCtjý 1 an'n aD attitude EDD [,-L1Lgitde. UTýlEaistin -j UWTM ortIihw,ý 4-6' <167 i 12/4/2006 9-11' <167 ! 12/4/2006 3879 9
-1 <167 12/4/2006 38.7093 -91.7701 1848703.25 1047949.56 14-16' <167 1 1/4/2006 Tritium in Water <177 1 12/5/2006 C3AýSOL-Stb, 1O,+0540,400' LT (Vdlhif ,-bfMH/5ýf'
[3ý7Bring:,
eltr I b; . TrtteCVI Silij Date DE)_______, E)D gin)ue~ Ui; aýtiprI ___________
3-5' <144 1 12/4/2007 5-10' <144 12/4/2007 10-15' <144 12/4/2007 15-20' <144 I 12/4/2007 38.7082 -91.7705 1848582.70 1047535.14 20-25' <144 1 12/4/2007 25-28' <144 I 12/4/2007 Tritium in Water <188 12/4/2007 NOTES:
- 1) Bold value represents value detected above reporing limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline. .
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. MidwesIt Laboratory.
- 6) Stations represent field measured approximations! Not measured by professional surveyors.
BOREHOLE I IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T
_________ _.__,: *,,
- Borilng,<*CA;SOL~sta,,>105 +24:. 200' LT(VciW ofAMlH5)§:A ;..;,,: :
3-5 <147 i 10/1/2007 8-10, <147 I 10/1/2007 13-15' 1046+/-117975+/-,117 1011/2007 - 38.7087 -91.7709 1848481.40 1047712.80 18-20' 616 +/- 103; 525 +/- 101 10/1/2007 23-25 <147 10/1/2007 Tritium in Water 473 +/- 101 - 10/9/2007 1 am , ':e 2 T.tiumýp~i L)&... Daiteq D Dta*t..Iude 0. . Ea-itinbn.
6-5n <144 _e 11/9/2007 8-10' <144 I 11/9/2007 13-15 <144 11/9207 38.7085 -91.7706 1848570.27 1047662.52 18-20 644 +/- 103 ; 535 : 99 11/9/2007 23-25' 215 87 I 11/9/2007 Tritium in Water <160 i 11/9/2007
&jrnii~,v1Tnbuimm(pCi/LL) ,S mpflnq Date DD Lititujde nDLr~td ~Uý djMNrhr~ atn 0-5' <169 I 2/8/2007 5-10' 402 100 _ 2/8/2007 10-15" 10-15-0" 2956 205 +/-- +/- 175 17;;2890 +171 21706t142 2/812007 2/8/2007 38.7089 -91.7703 1848640.48 1047788.49 15-20" 1305+/-1:141 ; 1706+/-+1142 2/8/2007 Tritum in Water' 2700 - 2/9/2007 Tritum in Water 2707 2/9/2007
- .'k
- ..><'V9 ,. Boiing'ASil Sta *106$50, 200'LT f .j 4 ,:'
3-5' <156 t 10/12/2007 8-10' <156 1 10/12/2007 13-15' <156 10/12/2007 18-20' <156 t 10/12/2007 38.7087 -91.7709 1848477.70 1047710.71 23-25' 339 +/- 96 10/12/2007 28-30' <156 10/12/2007 Tritium in Water <156 I 10/12/2007 NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T
- =*i* .,* :,;*:* :*.'* * ,
", 36f*g CGA-SOL-Sta. 107 + 00'-"90*'-LT:(Vi niy.... MH-6)*>... *;' '*"' "÷; ;..
Sample Inter-al jeat bg) ~ u C ) Smpling . Dte ,D,D Lititiifl ~DO Lorgitude U MEsil U~l,ýlin 4-6' <167 I 12/13/2006 9-11' 14-1 14-16' f[ 171 1671
<167
<184 95 1
+/--95 I
i 1 12/13/2006 2/3/2006 12/13/2006 12/13/2006
- 38.7090
-91.7709 1848476.99
_ 1 1047820.82 Trdtium in Water 3-5' <193 1 6/21/2007 5-10' in Wat~iterNnNosapedt__s______ <190 I 62/2007 Tritium _________________
13-15' 967< 136 1 6/21/2007 18-20' t 691< 126 1 6/21/2007 38.7090 -91.7709 1848469.00 1047836.53 23-25' Sample Initdral (fe~et bs <1911LUL Thitium i ' 6/21/2007 Sampingpi~ Date L~atitude, rDD Lonqitude UTM! Easting t~~ ~ti 28-30' <191 6/21/2007-Tritium in Water None i Not sampled 0-5' <169 12/8/2007 9-210' <16 9 12/6/2006 38.7092 -91.7709 1848473.49 1047891.03 10-15' <16911 2/8/2007 ntrl(etbs
<145(p-CVL)i iSampti? Date 2/9/2007. DD.Latitude' DDI fongitude, UTM Eating ~UT%1rNorthi~g~
9-11' <177 t 12/6/2006 4-6' < 177 1 12/6/2006 9-11' <177 :1 12/6/2006 14-16' 3116 4. 1851 12/6/2006 19-21' 16624+/-.1491 12/6/2006 38.7089 -91.7711 1848414.59 1047809.04 19-21' 1531 +/-.146 1 12/6/2006 24-26' 2343 +/- 1671 12/6/2006 Tritium in Water None I Not sampled NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
BOREHOLE i IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T i.(-CA-SOL-,ta' 1U0 +.03, lQU RT -Vicinit, rr.MH,6)
B~6rinn s~iplne~i fet ,"'s 1
~Tritium(pCti L) InL D~[, DD itiu DD Lm;ud~e UTM E. [wý Ur~ OJI, 0-5' <181 12/11/2006 5-10' 10-15, Tritium in Water
<181
<181
<184
[
L 12/112006 12/11/2006 12/13/2006 38.7095 -91.7711 1848408.03 1048022124 SaniýýI,~~,*mp N- . ;2htim~piL puaL SamplingngumPate. ,DD Latitu.M; ~DO.Luniwjfde UTM Eastiri V UT.M~r~g rr4ehi 0-5' <157 1 2/81/2007 5-10' __157_ 2/8/2007 38.7093 -91.7716 1848354.59 1047956.66 10-15' <157 _ 2/8/2007 LTritium in Water <145 2/9/2007
.. 1arnpe#InwaI(feet
[bgs)~ T ntium (pCi!L') Samptinm Dat DD L~aftiude ~Dr) Lonqilde~ UTM Eas~tiri HUTrMlN(,thmn 4-6' <181 1 12/11/2006 9-11' <181 1 12/11/2006 14-16' <181 1 12/11/2006 11-1 11 1 12,,06 38.7095 -91.7716 1848268.93 1048003.68 19-21 <181 12/11/2006 24 <181 12/1112006 Tritium in Water <184 1 12/13/2006 Bjin g:jXSL-ta 10 856ýj.I d~ -6B _
S~iihilednterval I ý is __ pc Trqur. F~~~ii D- - DIDL~atitude 00:(rije UT% E-Zir r hr, 4-6' <177 12/6/2006 9-11' <177 1 12/6/2006 14-16' 3116 +/- 1851 12/6/2006 19-21' 1662:+/-11491 12/6/2006 38.7091 -91,7718 1848201.11 1047881.36 19-21' 1531:1461 12/6/2006 24-26' 2343 : 167 I 12/6/2006 Tritium in.Water 2518 +/- 171 ! 12/13/2006 1 1 1 NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Llaboratory.
- 6) Stations represent field measured approximations. Iot measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON I PROJECT NO. 09067011 IV 0-5' <169 218/2007 5-10' < 169 I 2/812007 10-15' <169 2/8/2007 38.7090 -91.7719 1848186.49 1047834.28 15-20' <169 2/8/2007 Tritum in Water <145 1 2/9/2007 neia(feetbg) S~TrtIJIfiff(pCIL,~ 6am4 U~, r,,rti 4-6' 228 +/- 103 i 1216/2006 9-11' <177 1 12/6/2006 14-16' <177 1 1216/2006 38.7092 -91.7721 1848118.97 1047889.89 19-21' <177 12/6/2006 24-26' *<177 12/6/2006 Tritium in Water <176 12/8/2006
~ N;B~rih LiCA ISOLa,,-30 RT Vidinhif -f~I8 ~ ~ A<~
0-5' <157 2/9/2007 5-10' <157 219/2007_ 38.7141 -91.7742 1847520.49 1049684.52 10-15' <157 1 2/9/2007 Tritium in Water <145 2/10/2007 Bdri~:'CAS0L1S6 13 ý 8, 12"T ofcifit,-tM-S a ný,VlehiiEral Tritium ýýjCL[1) Sa[Tpýliniý DýIp E)D Latitude DE Lfjriýjtude UT41 F-citiial UTrýl tJuilhinj 4-6' <190 6/21/2007
'-1 193 i 93<193 6/21/2007 I 6/21/2007 38.7155 -91.7740 1847565.64 1050196.73 14-16' <193 6/21/2007 Tritium in Water None i Not sampled NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON i PROJECT NO. 09067011IT Sanle~terval jet , 1nrtium ei/L)' Samli' D4 ~DD Latitude, ~.
-DLniid isrq Ut1Nrhn 3-5' <190 I 6/21/2007 8-10 <190 6/21/0 38.7155 -91.7742 1847508.58 1050196.28 13-15' <190 6/121/2007 Tritium in Water None Not sampled
- SairiH/*,ta*(frt*g) 1'3D 1,at2o"Latitude DVi H-8) o'lude UMEat UT
~Simple~l ntervl detý" nýj ,~,L E aiuý DDL i d UMEitrj Iir1Northing 4-6' 403 +/- 102 I 12/22/2006 4-6' 249 +/- 97 1 12/22/2006 9-11' 213 +/- 96 I 12/22/2006 9-11, <165 12/22/2006 38.7156 -91.7741 1847544.22 1050238.75 14-16' <1652 12/22/2006 14-16' 216 +/- 96 112/22/2006 Tritium in Water <142 12/22/2006 SJIIýý' h,'l 11ýý-11ýJ~t Tntium (p'i/L'L Sýamplirig DatH LDiT) Lidetlý ~DD Loinglitde', UTM E-i,ýhg j-r' 0-5' 267+/- 97 1 2/912007 5-10' 2/200 38.7157 -91.7745 1847503.56 1050282.85 10-15' 305 +/- 99 I 2/9/2007 Tritium in Water <145 - 2/10/2007 4-6' <161 11/27/2006 9-11' <161 1 11/27/2006
[14-16' <161 1 11/27/2006 38.7158 -91.7744 1847443.12 1050298.04 9 2 1 - 1' <161 11/27/2006 Tritium in Water <177 - 12/5/2006 NOTES: I
- 1) Bold value represents value detected above reportin limits.
- 2) DD = Decimal Degrees. i
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
i BOREH OLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T GAY>SO',~ 13ý hto MH 8)*~~
ISaýmp~e (nterail (feet Ls). 'Tnt (pQi/E) -Smlný D~t DDL&ue D ogu. UTi. Eatn UTM 5~ thig 4-6' < 172 11/28/2006 D 9-11' 273 1 11/28/2006 14-16' <172 11/28/2006 38.7158 -91.7740 1847551.63 1050288.57 19 <172 11/28/2006 Tritium in Water <177 12/5/2006
-1, nPT 6, Lnate SA~jl(,etLjs Titim4I/L, Sam.in L)jt BE Lttu DD Loijiiiý TM Eistrij~CT'oti~,
4-6' <161 1 11/28/2006 9-11' <161 11/28/2006 14-16' <161 11/28/2006 38,7158 -91.7737 1847645.29 1050302.7 19-16' <161 11/28/2006 Tritium in Water <177 12/5/2006
_______._______ C?*Bbirg*A SeE-'St139C+SL 7;;' n f 8 -
,SampIe lnte alfteet, L b, S,*amp~lg ate , atit e, DDOLongtue,.... ET g MNoing ....
0-5' 3341100 I 2/9/2007 I
5-10' 1015 10-15'
<164
<164
<164 1
1 2/9/2007 2/9/2007 2/9/2007 1I 38.7159 -91.7741 1847518.77 1050351.81 Tritium in Water <145 I 2/10/2007
- KBýri$. CA ;O-t.'4 20, 90!RT (Viclnity ofMH-9)2: ______
4-6' <161 11/28/2006 9-11' <161 11/28/2006 14-16' <161 11/28/2006 38.7161 -91.7735 1847688.83 1050401.07 19-21' <161 11/28/2006 Tritium in Water 343+/- 100 I 12/5/2006 Tritium in Water I <170 I 12/22/2006 1 _
NOTES:
- 1) Bold value represents value detected above reporting limits.
I
- 2) DO = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations! Not measured by professional surveyors.
BOREHOILE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON I PROJECT NO. 09067011IT I jarnpletlnt a.(feet bgL - Tnitium~p~i/ýL) S Ln ate DDLatiude, DD LuLong*tuode UTY Eiasing.i UTY NMgNoin1gC 3-5' <147 I 10/2/2007 8-.10' <147 1 21/2007 38.7161 -91.7738 1847600.10 1050420.75 13-15' <147 10/2/2007 Tritium in Water <156 10/9/2007
- * -4
',*B~~~~~~d*~'*.QA St1*0*,'-ý5L, 102ý5"RT ýci,* "*fMHz9
(: * ;: .,),**%**;-i 3-5' <193 i 6/20/2007 8-10' <193 6/20/2007 13-15' <193 6/20/2007 38.7162 -91.7735 1847706.80 1050452.80 18-20' <193 6120/2007 Tritium in Water None I Not sampled fetfs ',rkntr,.I1tium,(PICL L) S; pln EteD Lrlt,'ý D .. nmitude UTM Easttfng UTM Nth 3-5' <190 1 612012007 8-10' <193 i 6/20/2007 13-15' <193 1 6/20/2007 38.7163 -91.7744 1847445.51 1050485.08 18-20' <193 1 6/2012007 Tritium in Water None Not sampled Sj~ý bgsý,d(et.mj)
'Tilu ([( 1S~imrqDrig~e. DD Latitude~ DD Lom-itude UTM j,Esting/1/2 UTM I toithiri2 4-6' 1537+/-138 11/21/2006 14-16' <170 1 11/21/2006 14-16' <170 1 1121/ 38.7164 -91.7740 1847558.40 1050524.29 19-21' <178 11/21/2006 24-26' <170 I 11/21/2006 Tritium in Water 211 +/- 96 F 11/27/2006 NOTES:
1)Bold value represents value detected above reportin I limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Llaboratory.
- 6) Stations represent field measured approximations. Iot measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T
[ ___________________Bornt] CA SOL-Sta: 141 +- 24.5, 100'LT (Vicinit; ,r MH-9A) ______ ______
Sam~ple* Inte l(fet'bgs) Tf im(~ L) -SwahplIg.Dati .DD'L'atitud.e~ [DDLongitude UTM Easting UM othn 4-4 <170 1 12/22/2006 9-11'1 <170 12/22/2006 38.7164 -91.7742 1847514.97 1050528.99 14-16' <170 1 12/22/2006 Tritium in Water None I Not sampled
§.ýCI..LS6 4 0f,~B~t 3117 (iainiiti fMH'9B _______
SmiloFwl(etTntimn (pCi/L)' iSampling Date. ODDLaktul E oitude UT%1L Latnj U%"Nrln, 4-6' 253 +/- 95 1 11/21/2006 9-11 , <170 j 11/21/2006 19-216' <170 1 11/21/2006 38.7166 -91.7735 1847713.25 1050584.16 24-26' <170 11/21/2006 170 12 Stb16 +
17/2006 T r ht i-MF4 Triiu inWtr 1T~um in Wat7e 191 +/- 95 - 1 1/27/200N6 ____________________
,SjP1P1
[ava tfe .~t TrtiumnqCt L) .- tSaiýmp DciDte ~DD iattudle -'DU Longtude Ui7M1EAsing. IUTM1ýNorlhirg'.
4-6' <161 i 11/27/2006 9-11' <161 I 11/27/2006 I 1-16' <172 1 11/27/2006 38.7168 -91.7741 1847515.30 14-16' <172 1 11l/27/2006 1050680.79 Tritium in Water None I Not sampled Sampe (eetLgsTrtiun (p~iL) ~iw nqDat DDLatittidj ~DDL~onitude UTflMEa'sting UTM'lNnrlhmino 3-5' <157 i 11/9/2007.
8-10' <157 i 11/9/2007 13-15' <157 11/9/2007 38.7165 -91.7739 1847587.59 1050559.05 18-20' <157 I 11/9/2007 23-25' <157 I 11/9/2007 Tritium in Water <172 I 11/9/2007 NOTES:
- 1) Bold value represents value detected above repo.ling limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations! Not measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T 136-di: ( ,AZSOLStbi. 1~42 + 2Z,'5,23'RT(Vicinit> oyH-B
- Sa mpleihterval (fe~et~bgs)i
_____________(feet[___, p~,- )ftm Safiplinfj Date DIDLatli'ude (DOL)oLr )t ude( }UM;~itni
.UTM Easting. UTMN&VI~
3-5' <157 F 11/9/2007 8-10' <157 11/9/2007 13-15' <157 F 11/9/2007
<14 11/9/2007 38,7166 -91.7736 1847672.90 1050596.14 18-20' 20-25' <157 F 11/9/2007 Tritium in Water <172 I 11/9/2007 S-ýrmpleItea A *(~lef~tsi~j Tnitir L) Samplng Da t DD Latu.eee
.)te t DLo tiDD le t-'t EIEsti, 4 I*sij'ti 3-5' <144 I 11/9/2007 8-10' <157 F 11/9/2007 13-15' <144 i 11/912007 38.7167 -91.7736 1847672.61 1050632.56 18-20' <157 F 11/9/2007 23-25' <157 11/9/2007 Tritium in Water <172 111/9/2007 Sarmip1e Intei?/ajl~feet bgs)~ Tn~tlum~ptL ampliip Dt DD.ILatitudc .DP LonjjtUdý 4Esig~tlM~~ig 3-5' <157 1 11/9/2007 8-10' <157 I 11/9/2007 13-15' <157 1 11/9/2007 38.7165 -91.7740 1847701.72 1050559.95 18-20' <157 T11/9/2007 23-25' <157 11/9/2007 Tritium in Water <172 11/9/2007 E1oIrig ýCiAOL-Sta2143 + 17'40'RT ViciniWtofMHý9B) sainple&JIFal r (Ibbl LýýS) Trtium ý)C.uLý Sý3n)phnq Dale DD Lalitude DD LuiioituJe I JTM Ertinq UTý,! rllý-tlhw,
- H 3-5' <147 1 10/2/2007 18-10' <147 F 102ý2007 38.7168 -91.7736 1847663.56 1050694.41 13-15' <147 I 10/2/2007
,Tritium in Water <156 1 10/9/207 NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Llaboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
'Cc-.
Ct CC 10)-
04 0
-q
,0) 10 '0
~C~J ca C14 I- WC 0l) 0 00 z C-4 zul I-A 2
I-m 0
CD C-)
I-a C)
- 0. 0.
F u
-L w N ro 2'
0 C4-0ý z 4 '~0.~
E o
wj I-
'C U
CO 0 C.-
a C.- C-
0 co 40 0~
a'-
u) w LO 0' Cl) z
i BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACaN PROJECT NO. 09067011T Brh-,G ELS, 3 +. 4E Y2E'.R7tici fii 1jfMH2-12)1 ______ _____
Samletqu T ri n (p1, /L) Earpjing Dd77 D Lattude [)D L-oriue UtIv1En TVrtiEI-,j L4-6' _<165 12/21/2006 8-10 _ <165 [12/21/2006
!Tritium in Water I None I Not sampled 38.7390 -91.7793 1845993.63 1058913.78
_________________ JeBo C ~L,~Sta 230'+ 5,Z2 5'R7~Vii L M 2) 1_____________
S~iinle Iner-1 f,,,, Lq'A, Tn i /m(,
L) S mrpliing D~te DD Liiude )L oiDE lgiltie) .UTYEMEastirg ~UT%1 ýNorttihw 3-5' <170 - 11120/2006 3-10, <170
+/-95 2410<170 i 11/20/2006 11/212002 38.7396 -91.7793 1845993.61 1058963.84 Tritium 13-15Tin Water W None 247i+/-95 N [I Not sampled 1 1s20/20 ____________ ______
NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T 3F, 7V RT Vin*iif,, ýUMH-12ý
-i' a fl rtu jiL apm ýt DD Laltitude FD Longitudeý UTM LEastlng- cT1Noing 3-5' m <170 11/20120,06 38.7403 -91 7791 1846046.77 1059203.93 Tdtium in Water None Not osampled _ _"_"
~ ~P ~%BMhgý CA%ýS SL-St6Y266'q95,'.10'FRT 71irinity or MH' 13)
- SampipInt~rJýe lftbqs),
t ~j.Tftim 6V(pý/Lt) SarniplingDate .DE, Latitude ~DD Longitude UTM Eastinq2 I.UMNrhr~9 0-5' <163 1 2/9/2007 5-10' <157 1 2/9/2007 "
10-15' <157 1 2/9/2007 38.7486 -91.7772 1846555.95 1062253.46 15-18.2' <157 2/9/2007 Titium in Water None Not sampled on6rhgC l -tb 7 0 39' RT (icinityrof MH 13) 0-5' <164 I 2/9/2007 10-15' 51'16 <164 1 1 2//07 2/9/2007 38.7495 -91.7770 1846401.79 1062585.27 Tdtium in Water <145 2/10/2007 BonirfqýVC L-3>th 27-0 + 60, 42'LT~ ~of cm~int MH- 13)
Lo UTM.No*rthm-.
0-5' <164 1 2/9/2007 5-10' <164 I 2/9/2007 10-15' <171 1 2/9/2007 38.7494 -91.7780 1846330.71 1062546.52 15-20' <171 1 2/9/2007 Tdtium in Water <145 r 2/10/2007 NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximationsI. Not mea sured by professional surveyors.
BOREHOILE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON I PROJECT NO. 09067011IT I
a2p e~ey .- api & i~e~DD Longjitude ~U~r1Easiitw UTJTNorh r 1, 3-5' < 145 I 10/2/2007 8-0' <145 I 10/2/2007 13-10, <145 1 10/2/2007 13-15' <145 1 10/2/2007 38.7570 -91.7785 1846150.12 1065323.75 18-20' <145 i 10/2/2007 23-25' <145 1 10/2/2007 Tritum in water None I Not sampled 'I I_ II _ I
~~~e L) DLditftu e~ DD Lniiittfde
[S),-i~ifglate DE UTrMlEistirg~ U~T, Iotng 4-6' <167 1 1/10/2007 9-11' <171 1 1/10/2007 14-16' 1616 t 145 1 1/10/2007 19-21' <171 1/10/2007 38.7572 -91.7786 1846117.98 1065362.69 24-26' <171 1 1110/2007 29-31' <171 1 1/10/2007 34-36' <171 1 1/10/2007 Tritum in water None Not sampled
___________________-S -t , F9 80'.LT (VIcnt ofMnil 6-6) _____ ______
3-5 e <147 10/2/2007 DDI.
3-5' <147 1 10/2/2007 8-10' <147 1 10/2/2007 13-15' <147 I 10/2/2007 38.7570 -91.7789 1846044.70 1065311.99 18-0 n e<147 I 1o/2/2007 23-25' <147 I 10/2/2007 Iritumn in water Noe j Not sa.mpl'ed ____________________
K~>'
-~~'~'~~~< V b flhdfA.9OL-,St~i.2294+'89; 45'RT,(Vicinity oflManh6le. 8"-),.
ý-ŽB .;K$ &,,.~&
~~ ~ ~ - -~~~~~Sa~qpLi~g te tDDLatitude -DEL'opgtuide ~ E'tn Tioti 3-5' <145 10/4/2007 8-10' <145 I 10/4/2007 13-15' <145 104/2007 2 38.7573 -91 .7786 1846109.51 1065410.84 18-20'<145 - 04/2007 23-25' <145 - 10/4/2007 Tritum in water None I Not sampled I I NOTES:
- 1) Bold value represents value detected above reportir g limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest I aboratory.
- 6) Stations represent field measured approximations. I lot measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T 2.CBoring CA-SOL-Sta. 2303 +- 98, 20',LT (icinit ~of Manhole 86'5)
Samle nteali~fet Ttiu (pi L ~gs Ewp~i~qD~ie D LtitdeDDLongitude; UTV Etirig ~UTM Northing 4-6' <167 1111/2007 9-11' <167 1/11/2007 14-16' <167 j 1/11/2007 19-21' <167 1/11/2007 38.7880 -91.7777 1846375.90 1065662.88 24-26' <167 1/11/2007 29-31' <167 1/11/2007 Tritium in Water None Not sampled
-Borin g: CA-SOL-Sta,23i 0 + 47.7, 33 LT*. cinitly (of Marntlole 86-4A)
SamiplIner- !tLbgs :~Tnt"ii /L' S£wpling Date DDLttd - LoUIINrhn 0-5' 5-10'
<158
<158 j 2/9/2007 219/2007 10-15' <158 2/9/2007 38.7596 -91.7774 1846479.21 1066248.3 Tntium in Water None - Not sampled R*i .I CA.SOsta?23116-C1
- -, :7:37'RT) c+nityf M7,nhte;86 3:-.
'anrieInteiral (fe g) Tuu p, L Sampingpa~,te _DDLatitude 0Longitude EID IJTM Eatn 'UTM Northing 0-5' <158 I 2/9/2007 5-10' <158 i 2/9/2007 10-15' <158 1 2/9/2007 1520' <158 2/9/2007_ 38.7612 -91.7774 1846452.23 1066823.75 115-20' < 158 [ 2/9/2007, 20-25' <158 2/9/2007 Tritium in Water None Not sampled __ __
NOTES:
- 1) Bold value represents value detected above reportng limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations!. Not measured by professional surveyors.
BOREHOLE IDENTIFICATION TABLES CALLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T
- h. CA.-SOL-Sta. 2316 + 66.7, 22'RT VicinityofMýanhboe386-3)
-Bodno Sample IntervaLd fettbgs) 'Trhfum' p&iL -iapling Date IDD L,,t(ijde DD Long itujde UTMV Eatng Ur. orhn 0-5' <155 i 2/9/2007 5-10' <158 2/9/2007 10-15' <158 2/912007 38.7613 -91.7775 1846425.86 1066883.24 15-20' <158 i2/9/2007 20-25' <158 - 2/9/2007 Tritium in Water None I Not sampled
-: C-S7OL-Sta. 23520 , 'n, 20'RT~ ,c-nity of Manhole 86-2)
Bnn ,4 Sapýl~ntevtiva(feet bg's) Tri4'Vtium(pCi/L) Sanmpflii DAe DI Laiud DLo.nild TM Etig UTM No,rthing 0-5' <156 I 2/9/2007 5-10' <165 i 2/9/2007 10-15' <165 - 2/9/2007 38.7624 -91.7777 1846378.19 1067280.49 15-20' <165 2/9/2007 20-25' <158 2/9/2007 Tritium in Water None I :Not sampled _1 SampleIriý a Trlbgs) pi,) S"1,1i aD ~iiUý DLnjtd UTM Eastin 1-T%1 No(tkmg 3-5' <156 I 10/4/2007 8-10' <156 1 10/4/2007 13-15' <156 I 10/4/2007 18-20' <156 10/4/2007 38.7634 -91.7791 1845957.75 1067660.48 23-25' <156 f 10/4/2007 28-29' <156 10/4/2007 Tritium in Water <156 10/12/2007 NOTES:
- 1) Bold value represents value detected above reporting limits.
- 2) DD = Decimal Degrees.
- 3) RT = Right of pipeline.
- 4) LT = Left of pipeline.
- 5) Analysis conducted by Environmental Inc. Midwest Laboratory.
- 6) Stations represent field measured approximations. Not measured by professional surveyors.
Manhole Tritium Investigation - Phase I Terracon Callaway Plant Project No. 00906701 IT September 8, 2006 Table 2: Manhole 2 - Borehole Sampling Results MH 2 0-1': 219,003 6/30/2006 1-2': 249,630 6/30/2006 unspecified 118,988 6/14/2006 Tritium in Water no sample dry 3-5': 673 6/30/2006 8-10': 791 6/30/2006 13-15': 966 6/30/2006 18-20': 1374 6/30/2006 23-25': 1381 6/30/2006 Composite 500 6/30/2006 Tritium in Water 590 6/30/2006 Tritium in Water <128' 7/5/2006 IVMHW2ZB12 2 .~:~~73 03ý L3~4. j*
'Sam Ielbjtbriv'I :fe~itbgs) Tritium,_i~Y+ Da~teX 3-5': 174 7/11/2006 8-10': 175 7/11/2006 13-15': 879 7/11/2006 Tritium in Water 337 7/11/2006 5.5-7.5': 6,378 7/11/2006 14-16': 2,361 7/11/2006 Tritium in Water 340 7/11/2006 Sam Ipe.,1nt'ervl j~bt-ýbgs Triidfiunj (CL) Dat 3-5': 1 <165 7/11/2006 8-10': <165 7/11/2006 13-15': <165 7/11/2006 Tritium in Water 435 " 7/11/2006 location MH-2 B-1B 2
Manhole Tritium Investigation - Phase I Terracon Callaway Plant Project No. 009067011T September 8, 2006 Table 2: Manhole 3B - Borehole Sampling Results 0-11': 43,304 7/10/2006 1-2': 117,359 7/10/2006 unspecified 19,257 6/14/2006 Tritium in Water no sample dry 3-5': 187 7/10/2006 8-10': <159 7/10/2006 13-15': <159 7/10/2006 19-20': <159 7/10/2006 Tritium in Water 138 7/10/2006 SahiTtti leI~iL:Date~
4-6': <167 7/12/2006 9-11': <167 7/12/2006 17-19': <167 7/12/2006 Tritium in Water <139 7/12/2006
- i-~---~-- ~
3-5': <167 7/12/2006 8-10': <167 7/12/2006 13-15': <167 7/12/2006 Tritium in Water <139 7/12/2006
~~7t55R50~?
k~+~l~113.
BA 3-5': <167 7/12/2006 8-10': <167 7/12/2006 13-15': <167 7/12/2006 Tritium in Water <139 7/12/2006 3
Manhole Tritium Investigation - Phase I Terracon Callaway Plant Project No. 009067011T September 8, 2006 Table 2: Manhole 5 - Borehole Sampling Results YM H7"':- YGW5+50:~
lrJtfvalte~tb jpr1fl@e KT~htiurn_ _QiL fDote -
0-1': 141,170 6/30/2006 1-2': 96,036 6/30/2006 unspecified 214,455 6/14/2006 Tritium in Water. no sample dry S'M H'~-,5,01311 , 1055ý1~
3-5': 174 7/5/2006 8-10': 3871 7/5/2006 13-15': <165 7/5/2006 18-20': <166 7/5/2006 Tritium in Water <128z 7/5/2006 113 1G5 7ýTL49jj>ý 4-6': <165 7/5/2006 9-11': <165 7/5/2006 14-16': <165 7/5/2006 19.5-21.5': <165 7/5/2006 Tritium in Water <129 7/5/2006 SMH7-5 .13;73~ ~105+29
' R50-~
S-ýaplJe lpervAi~f bg_7§,5 Tiriit~u? CpiL) Datfe 4-6': <166 7/6/2006 9-11': No Recovery 14-16': <166 7/6/2006 18-20': <166 7/6/2006 Tritium in Water <128 7/6/2006
~,
~' 1354-~ 1Ž T1061ý2 1 1L21 -V
$~Irn~el~itTral fee b(p Li/L)ii - Date L 4.5-6.5': <166 7/6/2006 9-11': <166 7/6/2006 14-16': <166 7/6/2006 19.5 20.5 <166 7/6/2006 Tritium in Water <128 7/6/2006
'MH-5 B-1 ,B-1A Comp 2 MH-5 B-1A 4
Manhole Tritium Investigation - Phase I Terracon Callaway Plant Project No. 009067011T September 8, 2006 Table 2: Manhole 6 - Borehole Sampling Results C., C tXt3/4~,~tr - . . 3/4,
~4,L F2~~3/4, ŽZ<c!~~!IILt'~
unspecified -300' unspecified <160 7/13/2006 Tritium in Water <138 7/13/2006 Tritium in Water <160 7/28/2006 3-5': 188 7/13/2006 8-10': 236 7/13/2006 13-15': 272 7/13/2006 Tritium in Water <138 7/13/2006.
3-5': <163 7/13/2006 8-10': 215 7/13/2006 13-15': 230 7/13/2006 Tritium in Water 188 7/13/2006
!: " ý MH-6 B-3 1'08+036R4:01-3-5': <163 7/13/2006 8-10': 221 7/13/2006 13-15': <163 7/13/2006 Tritium in Water <138 7/13/2006 1/4MH-6,"B-4 , 107+62 L16/ -
S,5pipiý I nijal&eIý(pt gi)fsK.T~jjtju6rý pi/L '.Date~
3-5': 1,204 7/13/2006 8-10': 2,303 7/13/2006 13-15': <163 7/13/2006 Tritium in Water 281 7/13/2006
'Reported by AmerenUE 5
Manhole Tritium Investigation - Phase I Terracon Callaway Plant Project No. 009067011T September 8, 2006 Table 2: Manhole 6B - Borehole Sampling Results MH-61 1,99 0-1': 64,704 7/6/2006 1-2': 53,981 7/6/2006 unspecified 144,060 6/14/2006 Tritium in Water no sample dry 3.5-5.5': 2491 7/6/2006 8.5-10.5': 7311 7/6/2006 13.5-15.5': 33841 7/6/2006 18.5-20.5': <165 7/6/2006 Tritium in Water 1554 7/6/2006 S~~~i ~
e ltrafet '( b~-
s ~Ii~
fflf /1-(L,) Dat 3-5': <166 7/6/2006 8-10': <166 7/6/2006 13-15': <166 7/6/2006 20-21': <166 7/6/2006 Tritium in Water 158 7/6/2006 4.5-6.5': <159 7/10/2006 13-15': 8,743 7/10/2006 Tritium in Water 1306 7/10/2006 MH3-6B M 4 ~ 1 09t60 Li _____
3-5': 194 7/10/2006 8-10': 25,863 7/10/2006 13-15': 5,284 7/10/2006 18-20': 793 7/10/2006 Tritium in Water 910 7/10/2006
'Composite of B-1 and B-1 B 6
Manhole Tritium Investigation - Phase I Terracon Callaway Plant Project No. 00906701 1T September 8, 2006 Table 2: Manhole 8 - Borehole Sampling Results 0-1 230,868 6/28/2006 1-2 147,428 6/28/2006 unspecified 57,178 6/14/2006 Tritium in Water no sample dry 3-5': 761 6/28/2006 8-10': 1,889 6/28/2006 13-15': <171 6/28/2006 18-20': <171 6/28/2006 23-25": <162 6/28/2006 Tritium in Water <124 6/28/2006 3-5': <162 6/28/2006 8-10': 924 6/28/2006 13-15': 714 6/28/2006 18-20': <162 6/28/2006 23-25": <171 6/28/2006 Tritium in Water <124 6/28/2006 MH48 B31 1 3-5': <162 6/28/2006 8-10': 290 6/28/2006 13-15': <162 6/28/2006 18-20': <162 6/28/2006 23-25": <163 6/28/2006 Tritium in Water <124 6/28/2006 9-11': 3,651 6/29/2006 13.5-15.5: <176 6/29/2006 Tritium in Water 159 6/29/2006 7
Manhole Tritium Investigation - Phase I Terracon Callaway Plant Project No. 00906701 1T September 8, 2006 Table 2: Manhole 9B - Borehole Sampling Results MH-9B1 K1i42~+47.5 SaMple Interval (fepet2 Tt* iL ) Date, 0-1': 154,956 6/27/2006 1-2': 53,735 6/27/2006 Tritium in Water <138 5/4/2006 Tritium in Water <124 6/28/2006
' MH-9B3 B-1 4+50~<
SqrnpIe Interval (feet bgs) Tritiumr(pCi/L), >Date<
3.5-5.5': 480 6/27/2006 8.5-10.5': <166 6/27/2006 13.5-15.5': <166 6/27/2006 Tritium in Water <124 6/28/2006 MH-9B3 B-2> 14-2+90,R50 _____
Sample Interval (feet g,) Tritium (pGiL) &2 Date 3-5': 197 6/27/2006 8-10': <171 6/27/2006 13-15': <171 6/27/2006 18-20': <171 6/27/2006 23-25': <171 6/27/2006 Tritium in Water <124 6/28/2006 MH-91 B-3141+85 L70 Sample, 1ntervaI'(feet bgs) -,Tritium~ (pCiL Date 3-5': 5,223 6/27/2006 8-10': <171 6/27/2006 13-15': 302 6/27/2006 18-20': 588 6/27/2006 23-23': 569 6/27/2006 Tritium in Water <124 6/28/2006 MH-9B3B-4 >141+301L15 -~
Sample' Interval- (feet1bgs~) Tritium_________ Date 3.5-5.5': 204 6/27/2006 8-9': 665 6/27/2006 Tritium in Water 155 6/28/2006 8
Manhole Tritium Investigation - Phase I Terracon Callaway Plant Project No. 009067011 T September 8, 2006 Table 2: Manhole 11A - Borehole Sampling Results MH-1 1A ~ 232_______ _80__
Sample Interval (feet bg~s)~ Tritiiuirn5Ci/L)- ~Date.
0-1': 816 6/29/2006 1-2': 669 6/29/2006 unspecified 885 6/15/2006 Tritium in Water no sample dry S§am~ple Inera (fe g Tritium (pCi/L):'~ Date 3-5': <176 6/29/2006 8-10': <176 6/29/2006 13-15': <176 6/29/2006 Tritium in Water no sample dry MIH-1 1A B-2< 232+25 L25~
Sample lntqrval (feet bg) (Tritium (p~i/L)j Date 3-5': 722 6/29/2006 8-10': <176 6/29/2006 13-14': <165 6/29/2006 17-18': <165 6/29/2006 Tritium in Water <173 7/11/2006
<MH-1I AJB-3 : 'K231+95'R40~
3-5': <176 6/29/2006 8-10': 992 6/29/2006 13-15': <165 6/29/2006 18-19.5: <165 6/29/2006 Tritium. in Water <173 7/11/2006 9
DIC 2601.2 DECOMMISSIONING RECORDKEEPING LOG Event Report Number (YY-XXX) Prepared by Date Location Event Description mDrain Tritium discharged to the Storm 92-001(1) R. Winslow 11/14/07 Stormd DrainT02, Pond T-1, & from 1984 - 1992 via T-3 sumps.
Contaminated sumps containing 92"002(1) Storm Drain measurable gamma-emitting (combined R. Winslow 11/14/07 Pond isotopes were routed to Turbine with 92-001) Bldg sumps and discharged to the Strom Drain Pond.
Sewage Sewage Treatment Plant 92-003(1) R. Winslow 11/14/07 Treatment contaminated via a cross-Plant connection from FFTF.
Cooling Sludge removed from Cooling 92-004(1) R. Winslow 12/6/07 Tower sludge Towers contains low levels of disposal site radioactivity.
Contaminated sediment from Spray Pond cleanout of the SW Spray Ponds93-001(1) R. Winslow 12/6/07 sediment in 1989 and 1991 was placed in disposal sites disposal trenches south of the Protected Area.
Storm Drain PER 298-0783: Isotopic analysis98-001 R. Winslow 12/12/07 Pond of discharge to storm indicates some Co-60drain present PER 200-1826: Co-60 found in liquid nitrate waste. These 00-001(2) wastes typically are drained to the
,(combined N N/A -
.Storm.Drain Storm-Drain Pond_-Determined to-with 98-001) Pond be cross-contamination of sample container, and not a radioactive discharge to the SDP.
01_001(2) Storm Drain PER 201-1381: Potentially (combined R. Winslow 12/12/07 Pond contaminated water poured down with 98-001) drain to Storm Drain Pond 01-002(2) Storm Drain PER 201-1233: Water drained to (combined R. Winslow 12/12/07 Pond Storm Drain Pond using with 98-001) potentially contaminated hoses03-001 Storm Drain PER 203-0856: Tritium levels in (combined R. Winslow 12/12/07 Pond January composite sample of with 98-001) storm drain outfall water elevated.
PER 203-2356: Radioactive water found in demineralized water 03-002(2) system including DWST.
(combined R. Winslow 12/12/07 Storm Drain Leakage from pumps and DWST with 98-001) Pond overflow goes to the Storm Drain Pond. (Note there were multiple PERs - documenting multiple contamination events.)
Page 1 of 2
DIC 2601.2 DECOMMISSIONING RECORDKEEPING LOG 03-003(2) PER 203-3885: Tritium detected in (combined R. Winslow 12/12/07 Storm Drain the WOA air wash water. This with 98-001.) Pond drains to the Storm Drain Pond.05-001 Storm Drain CR 2-05-08789: Increased Co-60 (combined R. Winslow 12/12/07 Pond was observed at the Storm Pond with 98-001) discharge during October.
Soil samples indicate Co-60 and 0/40 Cs-137 along pipe with higher 06-1 MLodne levels indicated ininCBD Contamination box 12.
valvevalve boxes re-mediated (reference AR-OER 53852).
(')Reference G02-06-100, COLUMBIA GENERATING STATION, DOCKET NO. 50-397, GROUNDWATER PROTECTION - DATA COLLECTION QUESTIONNAIRE (2)Reference PTL 244301, REVIEW SITE OPERATING HISTORY FOR EVIDENCE OF PAST SPILLS AND LEAKS TO THE ENVIRONMENT Page 2 of 2
~k
.1