ML111540092

From kanterella
Jump to navigation Jump to search
Summary of Annual Performance Assessment Meeting with Union Electric Company to Discuss the Callaway Plant Performance for the NRC Inspection Period Ending December 31, 2010
ML111540092
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/03/2011
From: Geoffrey Miller
NRC/RGN-IV/DRP
To: Heflin A
Union Electric Co
References
Download: ML111540092 (18)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION R EGION I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 June 3, 2011 Mr. Adam C. Heflin, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT:

SUMMARY

OF ANNUAL PERFORMANCE ASSESSMENT MEETING WITH UNION ELECTRIC COMPANY

Dear Mr. Heflin:

On April 26, 2011, representatives of Union Electric Company met with NRC personnel at William Woods University to discuss the Callaway Plant performance for the NRC inspection period ending December 31, 2010. The list of attendees and a copy of the NRCs presentation are included as Enclosures 1 and 2. In addition, Missouri State Representative Jeanette Mott-Oxford (D) was in attendance, and submitted a written statement (ADAMS Accession No. ML111230828). In her statement, Representative Mott-Oxford discusses several issues previously addressed by the NRC. A response to the representative will be provided in separate correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Sincerely,

/RA/

Geoffrey Miller Chief, Project Branch B Division of Reactor Projects Docket: 50-483 License: NPF-30

Enclosures:

1. Attendance List
2. NRC Presentation Slides

Distribution via ListServe R:\_REACTORS\EOC and Midcycle\EOC Meeting Summaries\2011\CWY EOC MS 04-05-11 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials NJM Publicly Avail Yes No Sensitive Yes No Sens. Type Initials NJM RIV/PE:DRP/B RIV/PAO C:DRP/B NJMakris VLDricks GBMiller

/RA/ /RA/ /RA/

5/3/11 5/3/11 5/3/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax